Vishal Kumar Singh

Vishal Kumar Singh Email and Phone Number

Attended Board of Technical Education, Uttar Pradesh (BTEUP) @
Vishal Kumar Singh's Location
Ballia, Uttar Pradesh, India, India
About Vishal Kumar Singh

Vishal Kumar Singh is a Attended Board of Technical Education, Uttar Pradesh (BTEUP) at KRC Infra projects Pvt. Ltd.

Vishal Kumar Singh's Current Company Details
KRC Infra projects Pvt. Ltd

Krc Infra Projects Pvt. Ltd

Attended Board of Technical Education, Uttar Pradesh (BTEUP)
Vishal Kumar Singh Work Experience Details
  • Krc Infra Projects Pvt. Ltd
    Junior Engineer (Structure)
    Krc Infra Projects Pvt. Ltd Feb 2023 - Present
    Development of Six –Line Access-Contrlled Highway Of Daatkali Tunnel-Dehradun of Ganeshpur-Dehradun Section of NH-72A From Km- 16+380 to 19+785. In The State of Uttarakhand Under Bharatmala Pariyojana On EPC Mode ( Package-3).
  • Krc Infraprojects
    Jr. Str. Engineer
    Krc Infraprojects Aug 2022 - Aug 2024
    Dehradun, Uttarakhand, India
  • Three60 Surveying & Mapping
    Assistant Surveyor
    Three60 Surveying & Mapping Feb 2005 - Oct 2022
    ElEPHANT UNDERPASS (EUP) : 02 NO’S 200MTR Each Steel girder length of one span 28.570 Meters SPAN COMPOSITE STEEL GIRDER and spacing of main girder 4.170 meter. Overall width of bridge 12.500 meter No. of cross girder = 2 nos Deck slab thickness.(Average) = 0.250 m Web plate size (without slab) = 1570 X 16 mm Top Flange thickness Plate- 1 = 375 X 22 mm Bottom Flange thickness Plate-1 = 480 X 25 mm Width of Crash Barrier = 0.50 m Width of footpath = 0.00 m Cantilever side1 = 2.08 m Cantilever side2 = 2.08 m Depth of cross girder = 0.940 m Total 14 no’s span, Foundation of pier 7X7 MTR, Pier Diameter 2.2X1.4 MTR, Pier height 7 MTR.
  • Ie:Tpf Engineering Pvt Ltd
    Assistant Surveyor
    Ie:Tpf Engineering Pvt Ltd Feb 2005 - Aug 2022
    Elephant Underpass (EUP) : 02 NO’S 200MTR Each Steel girder length of one span 28.570 Meters SPAN COMPOSITE STEEL GIRDER and spacing of main girder 4.170 meter. Overall width of bridge 12.500 meter No. of cross girder = 2 nos Deck slab thickness.(Average) = 0.250 m Web plate size (without slab) = 1570 X 16 mm Top Flange thickness Plate- 1 = 375 X 22 mm Bottom Flange thickness Plate-1 = 480 X 25 mm Width of Crash Barrier = 0.50 m Width of footpath = 0.00 m Cantilever side1 = 2.08 m Cantilever side2 = 2.08 m Depth of cross girder = 0.940 m Total 14 no’s span, Foundation of pier 7X7 MTR, Pier Diameter 2.2X1.4 MTR, Pier height 7 MTR.

Vishal Kumar Singh Education Details

Frequently Asked Questions about Vishal Kumar Singh

What company does Vishal Kumar Singh work for?

Vishal Kumar Singh works for Krc Infra Projects Pvt. Ltd

What is Vishal Kumar Singh's role at the current company?

Vishal Kumar Singh's current role is Attended Board of Technical Education, Uttar Pradesh (BTEUP).

What schools did Vishal Kumar Singh attend?

Vishal Kumar Singh attended U.p Board, U.p Board, Board Of Technical Education, Uttar Pradesh (Bteup).

Not the Vishal Kumar Singh you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.