Vladimir Shalamov
AeroLeads people directory · profile

Vladimir Shalamov Email & Phone Number

Independent Consultant: Production Engineering, Plug and Abandonment and Workover at JAM Stars Consulting
Location: Calgary, Alberta, Canada 13 work roles 1 school
1 work email found @shaw.ca LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email v****@shaw.ca
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Independent Consultant: Production Engineering, Plug and Abandonment and Workover
Location
Calgary, Alberta, Canada
Company size

Who is Vladimir Shalamov? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Vladimir Shalamov is listed as Independent Consultant: Production Engineering, Plug and Abandonment and Workover at JAM Stars Consulting, a with 1 employees, based in Calgary, Alberta, Canada. AeroLeads shows a work email signal at shaw.ca and a matched LinkedIn profile for Vladimir Shalamov.

Vladimir Shalamov previously worked as Independent Consultant: Production Engineering, Plug & Abandonment and Workover at Jam Stars Consulting and President and Founder at Jam Stars 3D. Vladimir Shalamov holds Bachelor'S Degree, Petroleum Engineering from Tyumen State Oil And Gas University.

Company email context

Email format at JAM Stars Consulting

This section adds company-level context without repeating Vladimir Shalamov's masked contact details.

{first_initial}{last}@shaw.ca
86% confidence

AeroLeads found 1 current-domain work email signal for Vladimir Shalamov. Compare company email patterns before reaching out.

Profile bio

About Vladimir Shalamov

A highly accomplished, adaptable and solution-oriented Petroleum Engineer with extensive experience of managing multimillion dollar complex projects to deliver an increased well yield and return on investment. A leading edge approach to planning, designing and executing well operational plans coupled with highly attuned relationship and stakeholder management skills enable delivery of results. Key skills include: plug and abandonment, field development planning; contract negotiation; troubleshooting; solving problems; design; production optimization; well testing; process design. Proficient in working with both horizontal and vertical wells, drilling, onshore rigs, coil tubing and other workovers. An exceptional level of attention to detail as well as focus on conducting operations safely and in line with global environmental standards. Commercially astute at managing both operational and capital budgets. Seeking a new opportunity globally as a Production Engineer, Intervention Engineer or Engineering Manager.

Listed skills include Petroleum Engineering, Petroleum, Upstream, Gas, and 46 others.

Current workplace

Vladimir Shalamov's current company

Company context helps verify the profile and gives searchers a useful next step.

JAM Stars Consulting
Jam Stars Consulting
Independent Consultant: Production Engineering, Plug and Abandonment and Workover
Calgary, AB, CA
Website
Employees
1
AeroLeads page
13 roles

Vladimir Shalamov work experience

A career timeline built from the work history available for this profile.

Independent Consultant: Production Engineering, Plug And Abandonment And Workover

Calgary, Ab, Ca

Independent Consultant: Production Engineering, Plug & Abandonment And Workover

Current
Jam Stars Consulting

Calgary, Canada Area

Provide independent consulting for O&G production, workover and P&A.Provide 3D design and printing models and prototypes for Oil and Gas

Jul 2015 - Present

President And Founder

Current

Calgary, Canada Area

Jam Stars specializes in prototyping and photo-realistic full color models, and our 3D technology has wide application in industries such as architecture, engineering, medical and healthcare, fashion, fitness and sports and entertainment.We use ProJet CJP 660Pro full color 3D printer. Provide presentation for clients about a company and product  Work with a client to ensure that all client requirements were done.  Prepare quotations to client requests. Manage company budget.

Mar 2017 - Present

Well Intervention Engineer - P&A, Integrity, Ctu And Service Rig Workover, Slick Line

Bp

Houston, Texas Area

BP America, Lower-48 Onshore, Houston, USAWorked across a network of complex onshore production in the USA.Responsible for plans and execution relating to the service rig, coil tubing unit and wire line well interventions on a large unconventional natural gas field in Wyoming. Planned and scheduled well intervention and well integrity activity.Provided hydraulic fracturing design using StimPlan software. Developed detailed well servicing operational programs to achieve the agreed objectives. Provided operational and technical support to onsite Well Intervention Site Leaders. Developed key procedures, including Plug and Abandon, fishing and remediate cementing workovers. Liaised with the BLM and WOGCC regulatory agencies. Worked with Intervention Engineers to develop skills and experience through coaching and mentoring.

Aug 2012 - Jul 2015

Principal Production Advisor

Moscow, Russian Federation

Maximised the recovery of well operations and provided advice to enable maximisation of capacity and operational planning. Carried out investment analysis to make recommendations to improve return on investment and the operation cycle. Provided technical expertise of heavy oil field development planning for TNK-BP project. Provided technical expertise of oil and gas projects including drilling, completion and workover. Worked as technical expert for Gazprom-Neft and Terra Resources. Resolved complex technical issues. Worked with static and dynamic models. Prepared operational and strategic plans.Managed budgets in line with operational and strategic plans. Managed contractual terms and issues. Worked on the contractual issues

Jan 2011 - Dec 2011

Subsurface Engineer, Consultant

Kiev, Ukrane

Provided support to the local team in respect of workover, completions and sidetracks.Development of completion design for multi-zone production with dual lift using ESP, SRP and PCP in Russia and Ukraine. Trouble shooting and problems solving complex production and technical issues. Training and coaching of local personnel.Management of the sidetrack project in Russia.

Mar 2010 - Nov 2010

Senior Production Engineer, Consultant

Sonoran Energy

Dallas/Fort Worth Area

Worked as a consultant to develop and implement a reactivation strategy for a newly acquired, out of commission oil field in West Texas and Louisiana.Undertook a detailed geophysical analysis of unconventional horizons and foundation data. Evaluated historical production lots to determine the most appropriate stimulation and reactivation strategies for the field with net proved reserved of 660,400 BOE.Estimated and recommended new acquisition of oil and gas fields. Prepared workover programs and procedures; provided supervision for the rig operation.Established and implemented reactivation programs and operating plans. Negotiated agreements with vendors, subcontractors and equipment suppliers. Recruited, training and coached 3 operational field employees. Provided field supervision for initial production start-up to closely monitor and resolve any quality, safety or production issues. Planned and managed a $4m operating budget delivering effective return on investment

Sep 2007 - May 2009

Operations Manager

Lundin Petroleum

Moscow, Russian Federation

Recruited by Swedish petroleum company to manage operations of their newly acquired unconventional Kaspiskoye Oil Field, located at the south- west part of Pre-Caspian Basin. Managed $20 million project with new well drilling, completion and facilities construction. Administered $10 million operating budget for production operations and workovers.Increased field production from 400 barrels to 1100 barrels per day through well stimulations, new well drilling and artificial lift system (ESP and SRP) optimization.Recruited, trained and directed technical team of 20 members. Developed and implemented company strategic plan for new business opportunities.

May 2006 - Oct 2007

Consultant, Drilling Engineer

Norwest Engineering

Calgary, Canada Area

Employed as a consultant to provide management assessment and conduct negotiations for drilling exploration projects in Russia (Kamchatka peninsula), with the budget of $50M.

Mar 2006 - May 2006

Drilling Consultant

Calgary, Canada Area

Employed by this major oil and gas exploration, development and production company to direct multiple drilling operations in North Alberta, with well operating budgets of $1.4 million

Nov 2005 - Mar 2006

Project Coordinator

Moscow, Russian Federation. Calgary, Canada

Approached by this oil field technologies and services firm to help them safeguard and expand their foothold in the Russian petroleum market, serving as both a corporate representative for pre-sales engineering and contract negotiations, and project coordinator for drilling, logging, cementing, perforation, hydraulic fracturing, acidizing, and well testing projects.Pursued and secured 2 contract projects with TNK-BP worth $3.8 million monthly.Renegotiated service terms on a major contract wit UKOS Oil Company that was at risk of termination, successfully safeguarding the business relationship and increasing revenue streams by 30%.Grew the Rosneft account from $10k to $2.5 million monthly.Developed a sophisticated solution for a complex drilling & oil production issue and decreased oil to gas ratios for Rosneft, resulting in a $2.5 million contract agreement.

Oct 2000 - Apr 2005

Senior Production Engineer

Nizhnevartovsk, Russia

Joined this international oil & gas exploration and development company to provide petroleum engineering expertise for well completions, workovers, simulations and heavy oil resources in their joint venture interests in the Western Siberian oil basin. Artificial lift design such as gas lift, ESP, SRP, PCP, plunger lift and etc. Utilized new well completion technologies and state-of-the-art recompletion and enhanced isolation, well stimulation and squeezing methodologies to generate 12K+ bbl per day.Developed and managed a pilot project of heavy oil production, including drilling and completions horizontal wells, steam injection (CSS), water and CO2 flooding and artificial lift design. Strategized and managed the reactivation of a fund of 200 out-of-commission wells, increasing production across the field to 1M bbl per year.Conducted economic and technical analyses and forecasts for new completions of vertical and horizontal wells using “Decline analysis” and Nodal analysis. Directed and managed a team of 5 employees.

Dec 1995 - Oct 2000

Reservoir Engineer And Production Manager

Chernogorneft Inc.

Nizhnevartovsk, Russia

Aug 1988 - Dec 1995
1 education record

Vladimir Shalamov education

FAQ

Frequently asked questions about Vladimir Shalamov

Quick answers generated from the profile data available on this page.

What company does Vladimir Shalamov work for?

Vladimir Shalamov works for JAM Stars Consulting.

What is Vladimir Shalamov's role at JAM Stars Consulting?

Vladimir Shalamov is listed as Independent Consultant: Production Engineering, Plug and Abandonment and Workover at JAM Stars Consulting.

What is Vladimir Shalamov's email address?

AeroLeads has found 1 work email signal at @shaw.ca for Vladimir Shalamov at JAM Stars Consulting.

Where is Vladimir Shalamov based?

Vladimir Shalamov is based in Calgary, Alberta, Canada while working with JAM Stars Consulting.

What companies has Vladimir Shalamov worked for?

Vladimir Shalamov has worked for Jam Stars Consulting, Jam Stars 3D, Bp, Baker Rds, and Kuwait Energy Company.

How can I contact Vladimir Shalamov?

You can use AeroLeads to view verified contact signals for Vladimir Shalamov at JAM Stars Consulting, including work email, phone, and LinkedIn data when available.

What schools did Vladimir Shalamov attend?

Vladimir Shalamov holds Bachelor'S Degree, Petroleum Engineering from Tyumen State Oil And Gas University.

What skills is Vladimir Shalamov known for?

Vladimir Shalamov is listed with skills including Petroleum Engineering, Petroleum, Upstream, Gas, Completion, Drilling, Energy, and Oil And Gas Industry.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Vladimir Shalamov you were looking for.

View similar profiles