Walid Ali
AeroLeads people directory · profile

Walid Ali Email & Phone Number

Roads, buildings and infrastructure Senior Resident Engineer/ project manager at TATWEER MIDDLE EAST AND AFRICA L.L.C
Location: United Arab Emirates 14 work roles 1 school
1 work email found @aecom.com LinkedIn matched
✓ Verified August 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email w****@aecom.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
Roads, buildings and infrastructure Senior Resident Engineer/ project manager
Location
United Arab Emirates
Company size

Who is Walid Ali? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Walid Ali is listed as Roads, buildings and infrastructure Senior Resident Engineer/ project manager at TATWEER MIDDLE EAST AND AFRICA L.L.C, a with 66 employees, based in United Arab Emirates. AeroLeads shows a work email signal at aecom.com and a matched LinkedIn profile for Walid Ali.

Walid Ali previously worked as Resident Engineer at Tatweer Middle East And Africa L.L.C and Resident Engineer at Aecom Middle East Limited. Walid Ali holds Bachelor'S Degree, Civil Engineering from Zagazig University.

Company email context

Email format at TATWEER MIDDLE EAST AND AFRICA L.L.C

This section adds company-level context without repeating Walid Ali's masked contact details.

{first}.{last}@aecom.com
86% confidence

AeroLeads found 1 current-domain work email signal for Walid Ali. Compare company email patterns before reaching out.

Profile bio

About Walid Ali

Waleed Ali is mostly experienced in the construction, supervision, testing, and commissioning of major and strategic Roads, buildings, and infrastructure projects intended to address a mixture of strategic and conceptual needs, being implemented in parallel with other components of the capital investments program (CIP) including high way, infrastructures, bridges, Marine, residential/commercial buildings, landscaping, and wet and dry utility industry using both open cut and NDM methods (GRE, GRP, HDPE, DI, UPVC) with SCADA networks, underground and above ground structures and ITS networks. All with the client's extreme pleasure and happiness on successfully completing the project on time and including monthly valuations, claims assessment, auditing of final accounts, liaison with Clients, services, and contracting organizations concerning technical, contractual, and financial issues, providing design and technical support for works being constructed, administrating stringent quality control and on-site environmental, health and safety procedures. My chronological resume lists my work experiences and achievements starting from the current or most recent one, and following up with previous jobs below other important things related with my previous majority projects are EXPO interchanges with total bridge length 3.2 k including Cd road bridges, directional ramps, road widening both sides, 4 to 6 lanes, proposal lanes in both directions, roadway signage, utilities diversion, protection of major existing services luce water transmission, drainage and irrigation networks, telecommunication, ED, EHV, HV, gas line and LV cables, including SCADA networks, construction of ITS networks, the construction of a new deep intercept as asset enhancement scheme, construction of Trunk sewer and TSE infrastructure from existing trunk sewer in the center of the city to a new WWTW plant, 53 km in length over a quarter of the length constructed by micro tunneling, construction of a new TSE pumping station and intermediate TSE pumping station and intermediate TSE pumping station with 2 reservoirs and chlorination facilities with 2200 liters per each, construction of twin pumping mains of 42.3 km trench in length, upgrading of roads and infrastructure and construction of new storm water manholes and gullies, relocation of existing service new LED lumen street lighting, repair and maintenance of existing roads cracks. . construction of B+G+ 7+ roof staff accommodation commercial building, B+G+8+roof residential retail building, construction of rest houses, warehouses etc.

Listed skills include Road Transport, Pipeline Management, Utilities Management, Consulting, and 5 others.

Current workplace

Walid Ali's current company

Company context helps verify the profile and gives searchers a useful next step.

TATWEER MIDDLE EAST AND AFRICA L.L.C
Tatweer Middle East And Africa L.L.C
Roads, buildings and infrastructure Senior Resident Engineer/ project manager
dubai, united arab emirates
Employees
66
AeroLeads page
14 roles

Walid Ali work experience

A career timeline built from the work history available for this profile.

Resident Engineer

Current

Abu Dhabi Emirate, United Arab Emirates

Project 1: Contract no. 6312008007- Maintenance and Repairing of Distortions in the Internal Roads and Assets in Abu Dhabi City, Mainland, Madinat Zayed CentreClient: Abu Dhabi Municipality- Madinat Zayed CentreAmount: AED 40 MThe Scope of Works involves full Maintenance and Repairing of Distortions in the Internal Roads and Assets in Abu Dhabi City, Mainland, Madinat Zayed CentreProject 2: Contract no. 6312008925- Studies and Engineering Works Improvement for Traffic Safety Client: Abu Dhabi Municipality- ADMAmount: AED 30MThe Scope of Works involves full maintenance and rehabilitation of Road works in the City of Abu Dhabi City Municipality Administrative Area, including all the internal and external road networks and the E-Roads network within that administrative area, The object of this Contract is to execute miscellaneous works in Abu Dhabi Main Land (Link Roads, Entrances and infrastructure for Completed Projects), The work includes removing existing pavement, drainage, lightning; pavement marking and signing; utility relocation of protection; and other related construction. The new roadway consists of aggregate sub-base material, aggregate base course, asphaltic-concrete base course, asphaltic-concrete binder course, and asphaltic concrete wearing course. Roadway drainage consists of all surface drainage pipes, manholes, catch basins, inlets, and subbase drainage systems, the work also includes relocation, protection, and construction of contingency ducts for existing and future utilities. Signing includes regulatory, warning, and special designation signs, appropriate to traffic operation: in addition, temporary signing will be required during the construction period, The work includes all light poles foundation, installation of light poles with lanterns and lamps, control cabinet foundation, installation of control cabinets, conduit installation of cables, and all work for lighting and related works.

Apr 2020 - Present

Resident Engineer

Aecom Middle East Limited

Dubai, United Arab Emirates

Project 1: Upgrading of Roads & infrastructure works in Old SHABIAT, Al-Ain – Phase 1Client: Al Ain City MunicipalityPosition: Resident EngineerAmount: AED 259,756,884The Scope of Works involves full maintenance and rehabilitation of Old SHABIATS including stormwater and street lighting works, Repair, and maintenance of Road Cracks, Partial or Full Depth of Reconstruction / Cold Milling, New Road Construction for Proposed roads with Foot Paths access, construction of New Foot Paths and Parking included interlock, Curb Stones, road signs and marking, Construction of New Storm Water lines including manholes and gullies, Relocation of Existing Services in improving roads with new LED Luminaries, and Construction of New Street Light networks.Project 2: R1048-3 IMPROVEMENT OF ROAD NETWORKS EXPO 2020Client: Dubai Roads and Transportation Authority (RTA)Position: Assistant Resident EngineerAmount: AED 676,150,151.00This project comprises the Construction of an interchange on the Existing Jebel Ali -Lehab Road & Academic City Road intersection to provide one of the Access Road to the EXPO 2020 event center. The project includes a Total Bridge Length 3.21Km including CD Road Bridges, Directional Ramps, a Total Length of 4.40Km widening on both sides of the existing JEBEL ALI-LEHBAB ROAD from 4 to 6 lanes, a Total length of 2.0Km Proposed 6 Lanes in both directions for Access road to EXPO, Construction of roadway signage and pavement marking, Utility Diversion / Protection of Major Existing Services, Relocation of DEWA-ED-EHV, HV and LV cables, Relocation of DEWA (Water) Transmission and distribution lines, including SCADA network relocation, DM Drainage & Irrigation Networks, Relocation of Etisalat, DU Networks, Construction of Proposed ITS Networks, and Protection of existing DUSUP gas line.

May 2018 - Aug 2020

Senior Resident Engineer

Dubai, United Arab Emirates

Project1: - B+G+7+Roof Staff Accommodation Building on Plot 3590820 At Al Quoz 4th, Dubai. Amount: AED 104,000,000Client: DIRE- Dubai International real stateProject 2: G+M Warehouse on Plot No. 5992049 at Jebel Ali Ind. Area 1Client: Shaikh Saeed Bin Maktoum Bin Juma Al MaktoumAmount: AED 22,850,500Building no. 01 gr. Floor plan (1525.53 sq.m), Building no. 01 mezzanine floor (1175.18 sq.m), the total area of building no. 01 (2700.71 sq.m), Building no. 02 gr. Floor plan (1548.76 sq.m), Building no. 02 mezzanine floor (1266.19 sq.m), the total area of building no. 02 (2814.95 sq.m), building no. 03 gr. Floor plan (3582.65 sq.m), building no. 03 mezzanine floor (3272.89 sq.m), the total area of building no. 03 (6855.54 sq.m), total service area (280.12sq.m), total no. Of required car parking (35 nos.), total no. Of garbage trolleys (04 trolleys), total built-up area (12651.32 sq.m). As a Resident engineer for more than construction projects, Project Management, Engineering Management, Materials Management, Technical Documentation & Conflict Resolution. My part-time role was between projects including but not limited to site supervision of works and overview of operation and maintenance, construction and commissioning including monthly valuations, claims assessment and auditing of final accounts, liaison with Client and contractor organizations concerning technical, contractual, and financial issues, providing technical support for works being constructed, administrating stringent quality control and on-site health and safety procedures on the project, leading the project supervision team including 10 persons upon the delivery of the project. Coordinate with other departments with regard to design and ensure that conceptual and detailing stages are within the set project timeline, Analyse and implement a variety of the field’s concepts, practices, and procedures.

Oct 2017 - Apr 2018

Resident Engineer

Dubai, United Arab Emirates

Project1: Margham Abattoir, Location: Dubai- UAEAmount: AED 23,081,430.00Client: Dubai Municipality - projects management division construction, completion, and maintenance of the Ground floor main building, service block and guard blockProject 2: DM COLD STORAGES building - Alaweer – Dubai Amount: AED 130 MClient: Dubai Municipality - Projects Management DivisionProject 3- RAHSED HOSPITAL-Group of healthcare buildings &facilities, Umhurair- Dubaiclient: Dubai Healthcare Authority Amount: AED 165 MProject 4- BUBLIC PROCSECUTION OFFICE BUILDING - G+1, UM Hurair 2- Dubai Client: Dubai Municipality - Projects Management DivisionAmount: AED 11MProject 5- BUBLIC PROCSECUTION WAREHOUSE BUILDING –G+1 AlQusais industrial area.Client: Dubai Municipality - Projects Management DivisionAmount: AED 10 MProject 6- (B+G+8 +Roof Residential & Retail Building), International City, Phase - 3- DubaiProject 7- (ETHIHAD MOSQUE), Al Barsha 2nd- DubaiClient: Union Cooperative SocietyProject 8- Construction of G + M Storage Building for Dubai Court at Al Qusais Ind. fifth area, Project No: 30019, Plot No: 248-0418, Storage Building for Dubai CourtClient: Dubai Municipality - Projects Management DivisionAmount: AED. 16,170,000.0Project 9. Construction of Rest Houses at Al Taweela Abu DhabiClient: Mr. Mosabah Al FattanAmount: AED. 24,000,000.00 Excavation, Backfilling & Compaction Anti Termite & PCC Works for Footings/tie beams, RCC Foundation & Columns, Block works, Plaster, all substructure and superstructure works with interior and exterior finishing. Project including (2 no of two-bedroom villa+ 2 no three-bedroom villa+ 2 no one Bedroom villa+ Majlis+ GYM+ Kitchen Block and Swimming Pool)Project 10. Project: PJ 0042 – DHA Headquarters extension, Plot No. 3150145 at Umm Hurair 2nd Client: Dubai Health Authority- Engineering department.Amount: AED. 02,266,000.00. Contractor: M/s. Delta Emirate Building Co. (LLC)

Sep 2015 - Sep 2017

Resident Engineer

Abu Dhabi Emirate, United Arab Emirates

Project 1: Link between Aryam & Ghezlan IslandsClient: The Crown Prince CourtAmount: AED. 103,000,000.00The project is located 69km to the south-eastern part of Abu Dhabi UAE between ALAryam Island and ALGhzelan Island including marine and scour protection works, whose main function is to link land transportation between these two islands. This project mainly comprises roads and bridges. Construction with a total length of 1806m, of which the total road length is 1700m, one single-span bridge 40m, and another triple-span bridge 120m. The bridge foundation is cast in-situ piles and the main superstructure is precast pre-stressed beams. Paving work includes waterproofing and wearing course. The road is backfilled with filling materials and uses rocks to protect the road on two sides. The road is successively paved with a subbase course, base course, and asphalt course Road and bridge include affiliated facilities like railings, Field survey, Geotechnical, and geophysical investigation, N.O.C, Embankment works, Paving work, Construction of the bridge, Singing & Road marking, Causeway/pipes fixing, Submission of calculation sheet and modules, Coordinate with any other third party, The testing, and commissioning of all works. Etc. with all additional Temporary Roads and Additional RC Culverts (Dim=1000mm) and GRP Temporary culverts.Project 2: Contract No. 407/1- Value engineering enhancement of landscape outside Abu Dhabi island- Phase 2, IRID CONTRACT NO.209/5 – Rehabilitate the Parks and infrastructure in Abu Dhabi Mainland (phase 6- infrastructure), C-106 Rehabilitate the Parks & infrastructure in Abu Dhabi Island The project includes three contracts located in miscellaneous works orders and located in different locations of Abu Dhabi Island and the mainland.Client: Abu Dhabi MunicipalityThree Miscellaneous contracts including 21 work orders for construction of road works, landscaping, and infrastructure.

Apr 2014 - Aug 2015

Resident Engineer

Stantec Uk Limited Abu Dhabi, Uaemwh Global – Abu Dhabi, Uae

Abu Dhabi Emirate, United Arab Emirates

Project 1: Contract No. O-11385 Construction of trunk sewer in Abu Dhabi- Assert Enhancement Scheme, Stage 1, Abu Dhabi, Area 3 (AES 3) – Part 1Client: Abu Dhabi Sewerage service company (ADSSC) – Abu Dhabi. UAEAmount: AED. 100,000,000.00Construction of deep trunk sewer by micro-tunnelling from proposed manhole MH A3-15 near the intersection of Hazza Bin Zayed Street and Al Salam Street, to proposed manhole MH A3-01 outside existing pumping station MPS 2. This comprises of the following (1600 mm Dia. Concrete encased GRP pipeline, length 290m (MH A3-15 to MH A3-13. 2400 mm Dia. Concrete encased GRP pipeline, length 2950 m (MH A3-13 to MH A3-04). 2600 mm Dia. Concrete encased GRP pipeline, length 710 m (MH A3-04 to MH A3-01). Construction of deep trunk sewer by micro tunnelling from proposed manhole MH A3-08-01 to proposed manhole MH A3-08 for the connection of Al Salam Street Residences Development. This comprises of the following. 500 mm Dia. Concrete encased GRP pipeline, length 110 m. Construction of manholes within NDM pits with the backdrops arrangements where required at the following locations:( 1600 mm diameter future connection at MH A3-15 for AES 3- Part 2 (upstream Area 3 Deep Trunk Sewer from PS 2), 400 mm diameter future connection at MH A3-09 and 300 mm diameter at MH A3-06 for Sector E-25 Development. 500 mm diameter future connections at MH A3-08-01 for Al Salam Street Residences Development. 1800 mm diameter future connection at MH A3-04 for Reem Island Sewerage Connection Phase 2. 2800 mm diameter future connection at MH A3-01 for the Link Sewer connection). Interception of the following existing sewers. (Existing 1800 mm diameter Sewer (C-line) at MH A-13 Sea Palace Development at MH A3-10 and MH A3-07 Sector E-26 at MH A3-01). Construction of Vortex Drop Chambers:( VD-01 at Node No. MH A3-13 for the connection of the existing sewer from Sea Palace Development).

Aug 2013 - Mar 2014

Resident Engineer

Arcadis Consulting Middle East Limited (Hyder Consulting Middle East Limited)

Abu Dhabi Emirate, United Arab Emirates

Project 1: Al Ain Asset Enhancement Scheme – Construction of Trunk Sewerage & TSE infrastructure – Part 2, AL Ain, UAEClient: Abu Dhabi Sewerage Services CompanyAmount: 767 MThe original contract budget is 761,148,995.00 M. The Al Ain Asset Enhancement Scheme is intended to address a mixture of strategic and conceptual needs. AES is being implemented in parallel with other components of the Capital Investment Program (CIP). The AES Proposals Include The Construction of a new deep interceptor trunk sewer from the existing Mezyad trunk sewer in the center of Al Ain City to a new WWTW at Al Hamah, approximately 53 km in length over a quarter of the length to be constructed by micro tunneling construction of a new TSE pumping station at AL Hamah WWTW and an Intermediate TSE pumping station with 2 reservoirs and chlorination facilities. Each of the pumping stations has a capacity of approximately 2200 liters per second. Construction of twin pumping mains of approximately 42.3 km trench length, from the TSE Pumping Station at Al Hamah to the Intermediate Pumping Station and from the Intermediate Pumping Station to the existing pumping station at M10.The scope of the work is divided into two packages and package 2 has been awarded to N.B.H.H on 11th October 2010 to be completed on 10th October 2012.As a Resident engineer including but not limited to site supervision of works and overview of operation and maintenance, construction and commissioning including monthly valuations, claims assessment and auditing of final accounts, liaison with Client and contractor organizations concerning technical, contractual, and financial issues, providing technical support for works being constructed, administrating stringent quality control and on-site health and safety procedures on the project, leading the project supervision team including 10 persons upon the delivery of the project.

Jan 2011 - Aug 2013

Resident Engineer

Abu Dhabi Emirate, United Arab Emirates

Project 1: Construction of Sewerage Connections and Related Works in Abu Dhabi Island and Mainland-Phase-II, Abu Dhabi, UAEClient: Abu Dhabi Sewerage Services CompanyAmount: AED. 117,379,795.63The covered works orders under this Contract are the main part including Gravity Sewer including related structures and associated works; works related to the abandonment of existing sewerage; reinstatement of all surfaces and/or any existing components/ services disturbed or damaged as a result of the construction and/ or maintenance of this project; NDM works; miscellaneous works at existing sewer networks which include- but are not limited to the following: connection of new sewerage to existing manholes, construction of new manholes on existing networks, dealing with live sewer flow, over pumping and all related works, modify existing manholes to receive new pipelines, modify existing manholes to receive new pipelines, the provision of labor, materials, plant equipment, instruments, etc. required for works, the testing and commissioning of all works.As a Resident engineer including but not limited to site supervision of works and overview of operation and maintenance, construction and commissioning including monthly valuations, claims assessment and auditing of final accounts, liaison with Client and contractor organizations concerning technical, contractual, and financial issues, providing technical support for works being constructed, administrating stringent quality control and on-site health and safety procedures on the project, leading the project supervision team including 10 persons upon the delivery of the project.

Jul 2010 - Dec 2010

Resident Engineer And Assistant Resident Engineer

Parsons International Limited

Abu Dhabi Emirate, United Arab Emirates

Project 1: Yas island contract 1- Internal roads at various locations in Yas IslandClient: AlDarAmount: AED. 70,000,000Maintenance of roads and assets transfer from Aldar to Abu Dhabi Municipality complete with trees, footpaths, traffic control devices, pavement marking, and connecting them to the existing roads. service ducts for future utilities at all road crossing storm water and irrigation facilities, the landscaped areas, asphaltic internal roads complete with roundabouts, car parking, access to existing plots, traffic signs and road marking, sidewalk, and hard landscaping areas. Street lighting poles, lanterns, cable, feeder pillars, and other necessary components  Project 2: Contract PGD/O & M/ 204: O&M of Irrigation, Storm Water, and Landscape for Abu Dhabi Mainland along Abu Dhabi Dubai Highway from Airport to Ajban InterchangeAmount: AED. 117,379,795.63The principal objective of the project is to outsource responsibility for the operations and maintenance of the open space assets and other stormwater and irrigation facilities, the landscaped areas, gardens, farms, and forests within Abu Dhabi Mainland that are currently owned by PRFD

Dec 2009 - Jul 2010

Resident Engineer And Assistant Resident Engineer

Associated Consulting Engineering International (Ace)

Dubai, United Arab Emirates

Project 1: Dubai industrial city TBN001 labor cities 5&6 infrastructure, Dubai, UAE.Client: DIC (A member of Tatweer, Member of Dubai Holding). Amount: AED 100 millionThe project area is in Dubai industrial city and the scope of the contract comprises Construction of new proposed roads complete with footpaths, traffic control devices, pavement marking, and connecting them to the existing roads. Service ducts for future utilities at all road crossing storm water and irrigation facilities, the landscaped areas, asphaltic internal roads complete with roundabouts, car parking, access to existing plots, traffic signs and road marking, sidewalk, and hard landscaping areas. Street lighting poles, the construction of the infrastructure works. Construction of Infrastructure for labor city 5 and labor city 6 including Sewer mains Diameter between 500 to 160mm, manhole, and HC chambers. Construction of water supply network including valve chambers and HCs with fire fitting network. Construction of Etisalat network, construction of 11 KV Electricity network, construction of Drainage soak away system and irrigation networks.Project 2: DS174 Main Irrigation Lines, Dubai, UAE..Client: Dubai Municipality. Amount: AED 273 MThe project areas and works are in different parts of the city of Dubai and comprise the installation of about 100 KM of irrigation mains with an irrigation booster pump station and the construction of about 75 Nos valve chambers of different types.Project 3: Sewerage and drainage section Contract DS 154- Construction of Sewerage and Drainage Gravity network for AL MEZHAR 2 Sewerage and Drainage, Dubai, UAEClient: Dubai Municipality. Amount: AED 75 MSewerage and Drainage Project in AL Mezhar 2 locality in Dubai. Project 4: Sewerage and drainage section Contract DS 132 - Construction of Sewerage and Drainage Gravity network for Al Warqaa Phase 2 (Community 422) Dubai, UAEClient: Dubai Municipality. Amount: AED 63 MConstruction of Sewerage Networks.

Apr 2007 - Oct 2009

Assistant Resident Engineer

Aecom Middle East Limited Alain

Alain, United Arab Emirates

Project 1: Contract A-1764 – Water Distribution Network at Al Bateen, Al Saad, Abu Samrah, and Al Yahar, UAEClient: ADWEA- Abu Dhabi Water and Electricity Authority- Alain Distribution company AADCAmount: AED 31 MProject DescriptionPotable water distribution mains, including DI and HDPE pipelines, DN600mm to DN100mm. Assistant Resident Engineer duties for works including Construction of primary and secondary distribution mains for new development areas in Al Bateen, Al Saad, Abu Samra, and Al Yahar areas, Construct 600mm diameter ductile iron main, Extension/modifications of existing distribution networks to the left-over areas from other ADWEA projects in Zakher and Mutared replacement of AC.Duties and responsibilitiessite supervision of works and overview construction and commissioning including liaison with Client and contractor organizations concerning technical, providing technical support to supervision staff for works being constructed, administrating stringent quality control and on-site health and safety procedures on the project, leading the project supervision team including 4 inspectors upon the delivery of the project.

Sep 2004 - Apr 2007

Assistant Residental Engineer

Grain Al Ayesh

United Arab Emirates

project 1: Contract No. G1042, Water Supply Scheme for Haramiya and Grain Al Ayesh Island, UAE: Client: ADWEA. Amount: AED70MConstruction works at Grain Al Ayesh. Works involving DN800mm pipeline from DN1600mm Transmission pipeline to 4No. Reservoirs; utilizing DN500mm and DN400mm branches; DN300mm to DN200mm new distribution system to supply existing palace and jetty; 4No. new ADWEA reservoir compounds complete with circular concrete ground water tank 4500m3 capacity; pump station (4No. pumps - 2 duty / 2 standby and one hydro-pneumatic tank) and gatehouse. Bainona Palace, involving DN500mm pipeline from DN1600mm Shuweihat Transmission pipeline with DN400mm branches to supply existing and proposed tanks in the Bainouna Palace area and DN200mm branch to supply Bainouna Camp. The reservoir tank Compound at H.H. Sheikh Sultan Palace provided one circular concrete ground water tank (4500 m3 capacity) with provision for future additional tanks of the same capacity; pump station (4No. identical pumping units - 2 duty / 2 standby); construction works of DN1000mm pipeline from Shuweihat to Jabel Dhanna, to supply Sir Baniyas and Jabel Dhanna Islands with potable water; replacement of existing ADWEA potable water AC distribution network at Mirfa with the new ductile iron distribution system, including house connections.project 2: Contract Nos. D-00-0221 and D-00-0221/A, Water Supply Network for New Residential Area North of Khalifa Town B, UAE: Client: ADWEA- Abu Dhabi Water and Electricity Authority- Abu Dhabi Distribution Company ADDC. Amount: AED14MConstruction of a new potable water distribution system at Khalifa Town, including installation of potable water distribution networks including ductile iron pipes and fittings, DN800mm to DN100mm diameter, fire hydrants, etc. Special works included thrust boring, parallel trenching, augmentation works, house connections, maintenance repair, and emergency works.

Mar 2002 - Dec 2003

Area Engineer

Egypt

railway maintenance activities and existing assets maintenance related to Egyptian National RailwayClient: Egyptian National Railway

Jun 1998 - Mar 2002

Site Engineer

Iee (Industrial & Engineering Enterprises Co.)

Egypt

as site engineer including but not limited to site supervision of works and overview construction and commissioning including liaison with Client and contractor organizations concerning technical, providing technical support to construction staff for works being constructed Client: Cairo governorate, Project value: EP 60 million

Jun 1997 - Jun 1998
1 education record

Walid Ali education

FAQ

Frequently asked questions about Walid Ali

Quick answers generated from the profile data available on this page.

What company does Walid Ali work for?

Walid Ali works for TATWEER MIDDLE EAST AND AFRICA L.L.C.

What is Walid Ali's role at TATWEER MIDDLE EAST AND AFRICA L.L.C?

Walid Ali is listed as Roads, buildings and infrastructure Senior Resident Engineer/ project manager at TATWEER MIDDLE EAST AND AFRICA L.L.C.

What is Walid Ali's email address?

AeroLeads has found 1 work email signal at @aecom.com for Walid Ali at TATWEER MIDDLE EAST AND AFRICA L.L.C.

Where is Walid Ali based?

Walid Ali is based in United Arab Emirates while working with TATWEER MIDDLE EAST AND AFRICA L.L.C.

What companies has Walid Ali worked for?

Walid Ali has worked for Tatweer Middle East And Africa L.L.C, Aecom Middle East Limited, Sustainable Architectural And Engineering Consultancy, Obe Architects, and Dorsch Holding Gmbh - Abu Dhabi.

How can I contact Walid Ali?

You can use AeroLeads to view verified contact signals for Walid Ali at TATWEER MIDDLE EAST AND AFRICA L.L.C, including work email, phone, and LinkedIn data when available.

What schools did Walid Ali attend?

Walid Ali holds Bachelor'S Degree, Civil Engineering from Zagazig University.

What skills is Walid Ali known for?

Walid Ali is listed with skills including Road Transport, Pipeline Management, Utilities Management, Consulting, Storm Sewer, Infrastructure, Potable Water Treatment, and Irrigation Management.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Walid Ali you were looking for.

View similar profiles