Night Drilling And Completions Fluids Engineer
Currentboosting and maximizing fluids performance for both water based,oil based and completions fluidsDrilled 5 top holes with HPWBM (207m) with the best inhibition in 8 days with the best at 1.45days(1.33hrs) with rig walk