William Mccabe
AeroLeads people directory · profile

William Mccabe Email & Phone Number

Project Manager | Production Engineer | Facilities Engineer | Production Optimization at Siena Natural Resources
Location: Yukon, Oklahoma, United States 11 work roles 2 schools
1 work email found @conocophillips.com LinkedIn matched
✓ Verified August 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email w****@conocophillips.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Project Manager | Production Engineer | Facilities Engineer | Production Optimization
Location
Yukon, Oklahoma, United States

Who is William Mccabe? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

William Mccabe is listed as Project Manager | Production Engineer | Facilities Engineer | Production Optimization at Siena Natural Resources, based in Yukon, Oklahoma, United States. AeroLeads shows a work email signal at conocophillips.com and a matched LinkedIn profile for William Mccabe.

William Mccabe previously worked as Vice President of Production at Siena Natural Resources and Production Engineer at Siena Natural Resources. William Mccabe holds Bachelor Of Science (B.S.), Mechanical Engineering, 3.0 from Oklahoma State University.

Company email context

Email format at Siena Natural Resources

This section adds company-level context without repeating William Mccabe's masked contact details.

{first}.{last}@conocophillips.com
86% confidence

AeroLeads found 1 current-domain work email signal for William Mccabe. Compare company email patterns before reaching out.

Profile bio

About William Mccabe

Experienced and results driven Mechanical/Petroleum Engineer with over 10 years of expertise in the petroleum industry. Proven success in leadership roles, particularly as Vice President of Production, with extensive experience in project management, artificial lift design, production optimization, process/facility design, and construction planning and supervision. Skilled in managing chemical programs and failure analysis, leading cross-functional teams, and communicating effectively at all levels of an organization from field operations to C-suite executives. Consistently delivers cost-effective projects on time and within budget, driving operational efficiency and significant cost reduction.

Listed skills include Petroleum and Natural Gas.

Current workplace

William Mccabe's current company

Company context helps verify the profile and gives searchers a useful next step.

Siena Natural Resources
Siena Natural Resources
Project Manager | Production Engineer | Facilities Engineer | Production Optimization
AeroLeads page
11 roles

William Mccabe work experience

A career timeline built from the work history available for this profile.

Vice President Of Production

Current

Oklahoma City, Oklahoma, United States

• Lead and manage all aspects of day-to-day operations across multiple operating areas in Kansas, Northern Oklahoma, and Texas.• Develop and implement financial and operational strategies through program implementation in areas including production monitoring, well workovers, failures, chemical, and infrastructure projects.• Achieved a substantial reduction in overall failure frequency, decreasing from over 2 failures per well per year to an average of 0.8 failures per well per year through AFL design and optimization.• Serve as a key leader in identifying and optimizing telemetry rollout, enhancing time management, and improving overall visibility across all assets.• Key contributor to identify and leverage new technologies to enhance and optimize all aspects of operations.• Implemented advanced data analytics tools to track and predict production trends, enabling proactive decision-making and improving asset performance across the board.• Identify and manage high-value projects, including those exceeding $1 million, ensuring adherence to budgets and timelines.• Development of AFE’s for large-scale infrastructure, completion, and production projects.• Collaborate daily with C-suite executives to identify and execute capital projects, improve processes, and enhance operational efficiency• Oversee facility design improvements to aging and poorly designed infrastructure, ensuring compliance with operational budgets and minimizing environmental risk.• Serve as team lead on multidisciplinary projects driving company-wide initiatives that align with long-term goals.

May 2023 - Present

Production Engineer

Oklahoma City, Oklahoma, United States

• Optimized artificial lift systems and downhole equipment, leading to production uplift and reduced operation costs.• Managed capital projects focused on pipeline and infrastructure enhancements, improving operational efficiency and reliability.• Developed and executed completion designs for both new wells and re-completions, ensuring cost control and production maximization.• Conducted comprehensive economic evaluations for all projects, ensuring effective capital management across CAPEX and OPEX, and alignment with company objectives.• Played a critical role in the development and implementation of production monitoring and optimization programs.

Nov 2021 - May 2023

Contract Engineer

Self-Employed

Oklahoma, United States

• Engineering expertise and construction oversight of packaged gas processing units, ensuring compliance with design specifications and operational requirements.• Developed and revised P&IDs for facilities utilizing amine and filtration systems for helium capture in nitrogen wells, ensuring operational efficiency and safety.

Jul 2021 - Dec 2021

Currently Seeking Opportunities As A Mechanical Engineer, Petroleum Engineer, And Project Manager

Oklahoma City, Ok, United States

Apr 2020 - Nov 2021

Operations Engineer

Kingfisher, Oklahoma, United States

• Direct management and definition of artificial lift optimization, failure mitigation, and production chemical programs.• Successfully led a multidisciplinary team to redesign SWD facilities in the Kingfisher Field, optimizing design for cost-effectiveness and minimal operational oversight.• Field team lead for SWD facility re-design for Kingfisher Fieldo P&ID (Piping and Instrumentation Design) development, cost analysis, construction plans, and PHA (Process Hazard Analysis) all prepared for this facility design.• Directed and implemented initiatives to reduce failure rates from 1.2 to .4 failures per well per year.• Team lead for LOE/Capital optimization and minimization program, reducing LOE spend 10 – 15% YOY, each year for four years, during program oversight.• Development of floodplain facility design for Kingfisher Co. for facilities in areas with substantial flood levels.

Jan 2018 - Apr 2020

Facilities Engineer

Weatherford, Oklahoma, United States

• Designed and implemented new production facilities for new drills, incorporating needs for all disciplines, and reducing cycle times from spud to TIL while reducing overall construction costs.o Full design from concept, through P&ID development and PHA, to construction execution and operation.o Single to 8 well pad designs, with accommodations for truck hauling of all produced fluids.• Developed strategies for uneconomic well facilities and implemented floodplain mitigation designs on legacy facilities.• New vessel design and implementation of desiccant system for instrument gas systems.• Optimization and uplift of high-rate high-pressure gas wells through facility design.

Jun 2015 - Jan 2018

Rotational Engineer

Oklahoma City, Oklahoma, United States

The focus of my time in this position was to gain valuable training, both on the job and in the classroom, to be applied later during my career. My time was spent in three different locations, Oklahoma City, OK; Shreveport, LA; and Canton, OH. Each location taught me valuable lessons that contributed to both my personal and professional growth. I learned how to make and keep valuable connections with my counterparts, how to manage my time effectively and how to function as an engineer in a professional environment. I rotated through various positions, engineering and otherwise, to learn how the company functioned as a whole, and the small details that are involved in well construction and operations. Each location provided me with not only a different set of operating conditions, but three incredibly unique and functional teams. This allowed me to view different approaches to the same or similar problems and how more than one approach can work effectively.High Flow Rate Erosional Velocity in Haynesville wellheads and pipingHaynesville P&ID Development and PHADrilling/Completions/Operations/Production Experience - Haynesville dry gas and Utica condensate/oil

Jun 2014 - Jun 2015

Facilities Engineering Intern

Oklahoma City, Oklahoma, United States

As a Facilities Engineering Intern, I was given two specific problems that would immediately add value to the company and those were: lightning data and mitigation; and analysis of oil carryover at SWD facilities and mitigation. Both projects allowed me to gain valuable insight with cross-functional groups within the company as well as collaborating with industry professionals outside the company. The two projects that I worked on, and the recommendations that came from them, were implemented, and resulted in a reduction in downtime, decrease in lost production, and an increase in revenue.Lightning strike tracking and prevention Capital projects Oil carryover monitoring and prevention at SWD facilities

May 2013 - Aug 2013

Facilities Engineering Intern For Eagleford Shale

Houston, Texas

During my time as a Facilities Engineering Intern, my two projects were to assist in the development and optimization of a full scale stabilization facility in the Eagle Ford Texas asset as well as conducting hydraulic calculations for pipes to be connected to that facility. This involved several field trips to the existing facility and discussions with field and office personnel to determine the best path forward with the designs.

May 2011 - Aug 2011

Production Engineering Intern For Permian Basin

Odessa, Texas

As a Production Engineering Intern, I was assigned a well-set of approximately 500 wells to monitor production, optimize, and recommend operational changes as well as writing procedures for workover interventions. All these aspects allowed me to gain a greater understanding of the whole production engineers work as well as giving me hands on experience with making changes to wells to maximize production. I worked in a cross functional group to make economic decisions and determine what value can be added at a minimal cost.• Performed well optimization• Designed and oversaw the implementation of work over procedures and recompletions.• Assisted in the day to day production and operations of Permian wells.• Assisted in team discussions regarding design and change of design for aging wells.

May 2010 - Aug 2010

Upstream Engineering Intern For Williston Basin

Baker, Montana

This was ultimately my introduction into all aspects of the Energy Industry. My main task for the summer was to learn as much as possible through interactions with my peers as well as getting hands on knowledge of field processes. I also had the opportunity to work with both the engineering staff and field staff on right-sizing the pressure relief valves that were in place on central production facilities. Through my analysis I was able to determine that the pressure relief capacities for the pressure vessels were significantly undersized and those were immediately replaced to ensure a safe process.• Developed and implemented system for quality assurance of pressure relief valves in central tank batteries• Performed well optimization for producing wells in the Bakken play.• Assisted in the implementation of pump off controllers for Bakken producing wells.• Assisted in the electrification project for the Bakken play.

May 2009 - Aug 2009
2 education records

William Mccabe education

FAQ

Frequently asked questions about William Mccabe

Quick answers generated from the profile data available on this page.

What company does William Mccabe work for?

William Mccabe works for Siena Natural Resources.

What is William Mccabe's role at Siena Natural Resources?

William Mccabe is listed as Project Manager | Production Engineer | Facilities Engineer | Production Optimization at Siena Natural Resources.

What is William Mccabe's email address?

AeroLeads has found 1 work email signal at @conocophillips.com for William Mccabe at Siena Natural Resources.

Where is William Mccabe based?

William Mccabe is based in Yukon, Oklahoma, United States while working with Siena Natural Resources.

What companies has William Mccabe worked for?

William Mccabe has worked for Siena Natural Resources, Self-Employed, Self Employed, Chesapeake Energy, and Conocophillips.

How can I contact William Mccabe?

You can use AeroLeads to view verified contact signals for William Mccabe at Siena Natural Resources, including work email, phone, and LinkedIn data when available.

What schools did William Mccabe attend?

William Mccabe holds Bachelor Of Science (B.S.), Mechanical Engineering, 3.0 from Oklahoma State University.

What skills is William Mccabe known for?

William Mccabe is listed with skills including Petroleum and Natural Gas.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the William Mccabe you were looking for.

View similar profiles