Assistant Engineer
Central Kowloon Route - Yau Ma Tei Ventilation Building, Hong Kong Sar
50/50 joint venture ownership by Jardine Matheson and .Balfour Beatty.HY/2019/13: Central Kowloon Route - Buildings, Electrical and Mechanical WorksSep 2021 - Oct 2023- Yau Ma Tei Ventilation Building Site, logistics and temporary works coordination.- >1 kiloton ELS prefabricated materials full cycle processing: Shop drawings --> procurement --> prefabrication --> logistics --> installation --> design amendment --> removal --> reuse/ disposal, dealing with logistics risks under COVID-19 pandemic when constructing in site with low-accessibility.- TTM coordination for site accessOct 2022 - Oct 2023- Design and Build Reinforced Concrete Structure Construction: operation team and rebar fixing inspection.Oct 2023 - Mar 2024- Design Coordination: prioritize Contractor's Designer task list for drawing amendments, cross-check design quality, actively explore for simplified rebar design, reduction of steel ratio and need of couplers within the frameworks of Code of Practice.Mar 2024 - Aug 2024:- Underground Utility works such as telecom and sewage/ drainage.- Precast wall installation logistics.- Rooms handover control on E&M and ABWF subcontractors.Aug 2024 - Sep 2024:- Design support at Lambeth Associated Limited (head office)