Construction Project Coordinator
Current2/2024: Edmonton LRT Subway Extension It is a 13-km horizontal project which starts from DT Edmonton all the way to Lewis Farm located in west Edmonton. B&M is working as a subcontractor to take in charge of infrastructure removal, traffic control, conduit and JB installation. 10/2023 - 1/2024: 2023 St Albert Fiber Optic Cable InstallationB&M was working as the primary contractor for this project, which includes 2-2" HDPE conduit cabling, 144F fiber optic cable pulling and… Show more 2/2024: Edmonton LRT Subway Extension It is a 13-km horizontal project which starts from DT Edmonton all the way to Lewis Farm located in west Edmonton. B&M is working as a subcontractor to take in charge of infrastructure removal, traffic control, conduit and JB installation. 10/2023 - 1/2024: 2023 St Albert Fiber Optic Cable InstallationB&M was working as the primary contractor for this project, which includes 2-2" HDPE conduit cabling, 144F fiber optic cable pulling and junction box/splice box installation. We are able to generate $50K projected gross margin at the completion of the project.9/2023 - 1/2024: 124 St Renewal B&M was working as the subcontractor for this project. We had removed existing infrastructure along 124 St in DT Edmonton and install the new streetlights, tree receptacles, junction boxes, cabinets, etc, which is part of the city of Edmonton’s Street Renewal Program. We were able to generate $500K projected gross margin, and gained nearly $110K for early finish bonus. Show less