Quality Control Chief
Current
Viranşehir, Şanliurfa, Türkiye
- PROJECTS: 1. YEKA-4 SOLAR POWER PLANT 195 MWp/150 MWe Şanlıurfa/TURKEY2. YEKA-4 SOLAR POWER PLANT 85 MWp/50 MWe Gaziantep/TURKEY3. YEKA-3 SOLAR POWER PLANT 130 MWp/100 MWe Niğde/ TURKEY4. YEKA-1 SOLAR POWER PLANT 1.350.
- Supervising site teams.
- Preparing BoQ and tracking.
- Review and alter the site designs to ensure projects details are more applicable and compliance with standards.
- Make recommendation for material selection based on design objectives.
- Performing inspections for installation all aspect of electrical works and materials