Quality Control Chief
CurrentPROJECTS: 1. YEKA-4 SOLAR POWER PLANT 195 MWp/150 MWe Şanlıurfa/TURKEY2. YEKA-4 SOLAR POWER PLANT 85 MWp/50 MWe Gaziantep/TURKEY3. YEKA-3 SOLAR POWER PLANT 130 MWp/100 MWe Niğde/ TURKEY4. YEKA-1 SOLAR POWER PLANT 1.350 MWp/1000 MWe Konya/TURKEY • Supervising site teams.• Preparing BoQ and tracking. • Review and alter the site designs to ensure projects details are more applicable and compliance with standards.• Make recommendation for material selection based on design objectives.• Performing inspections for installation all aspect of electrical works and materials• Testing the whole string and array at the circuit combiners box and inverter, earth resistance and insulation resistance.• Performing quality checks to ensure that established processes are followed.