Project Manager
Project: Al Manakher 52Mwp Solar PV power plant project, Amman−JordanDescription Construction of Al Manakher 52Mwp Solar PV power plant project ,covers an area ofapproximately 500,000 square meters located at the east of Amman−Jordan.143,144 Mono Grystalline panels was installedon 614 steel structure tables.Project: Saraya Aqaba, Amman−JordanDescription: Construction of multible projects at one time by top listed large Construction Companiesin Jordan.The project… Show more Project: Al Manakher 52Mwp Solar PV power plant project, Amman−JordanDescription Construction of Al Manakher 52Mwp Solar PV power plant project ,covers an area ofapproximately 500,000 square meters located at the east of Amman−Jordan.143,144 Mono Grystalline panels was installedon 614 steel structure tables.Project: Saraya Aqaba, Amman−JordanDescription: Construction of multible projects at one time by top listed large Construction Companiesin Jordan.The project is phase 2 of Saraya Aqaba mixed use development comprises of residential zones,infrastructure, hard and soft landscape works, spread over a total zones area of (76000)m2.Project: Galleria Mall Project, Jubail-KSADescription: Construction of Galleria MallProject in the city of Jubail, and just 100 meter from theAl−Fanateer beach, The area of land for the project 21,572 m2 and total construction area of 45,378m2 at a cost of 180 million Saudi Riyals.The building consists of two−floors for shopping and underground parking in addition to the externalworks .the project is a building of the concrete structure and raft foundation 3 meters below sea− level of1meter thickness of the area of 18525 m2 this is in addition to the work of the various ceilings: HollowCore Slabs ,Solid Slabs , Canam Asia System Slabs& Tensil Structure (Tent of area 5000m2 ).Project: Prince Salma Estate−;phase3, construction cost JD(7.5)million, built up area(20000)m2.Project: Zarqa Real Estate Building,Construction cost $1.5 million, built up area 3400m2.Project: The New Embassy building for Islamic Republic of Iran in Amman,built up area 3434m2Construction cost $3 million.Project: Extension and renovation of Emergency Department/AL−Bashir Hospital. Show less