Nearly 18 years of work experience, once engaged in thermal power plants, waste incineration power plants and ethylene projects, over 10 years of project management, and have nearly 2 years of overseas work experience.
-
Site ManagerChemtex Mar 2011 - Mar 2018Shanghai, CnAs site manager, my responsible as below:1. Assist marketing department to negotiation with client(if need);2. Issue contract and TP for both client and sub-contractor with our team.3. In charge of all site works, such as schedule, cost, quality and so on.4. Coordinate design institute, vendors, owner, construction company and other parties participate in project.5. Assist project manager to manage sun-contractor.6. Responsible for commissioning.7. Sometimes take part in commercial work such as bidding, negotiation with client or sub-contract, i.e. Ningxia project and Jade project.8. Selection vender or construction company for EPC project.9. Assist Owner to select sub-contractor if owner request us to do it.10. Assist owner to review all the documents from sub-contractor and control cost, quality, schedule on site.11. Other works my leader request.Major projects involved; LNG project,Xinjiang Guanghui New Energy Co. Ltd (from 2011 March to 2011 December.) LNG project, Yulin Yuanheng Co. Ltd (from 2012 January to 2012 May) LNG project, Ningxia Hongxin Co. Ltd (from 2012 May to 2015 Jan.) SSP project, Jade project in Nigeria (from 2016 Mar. to Now)
-
Project ManagerShanghai Electric Environmental Protection Group Jan 2006 - Feb 2011Shanghai,CnResponsibilities:1. Assist marketing department to bid and negotiation with client. 2. Build up a project team to execute project.3. In charge of all the management of project such as cost, schedule, safety and quality.4. In charge of bidding, purchase.5. Issue contract and TO for both client , sub-contractor and vendors.6. Site installation and construction.7. Coordinate all parts involved in project such as design institute, vendor, sub-contractor and so on.8. Commissioning.9. Communication with local government(if need).10. Other works my leader request.Major projects involved; FGC project, Shanghai Electric (Nantong) MSW incineration plantFrom 2006 January to September, as an engineer of Technology Center, Participated in technical route choice, the selection and procurement of equipment. From 2006 September to 2009 April, as a FGC project manager, having the overall responsibilities for the design, purchase, installation and commissioning. Kelamayi Petrochemical Industrial Park WWTPResponsible for the installation of BAF process stage
-
Project ManagerShanghai Xu-He Environmental Engineering Co., Ltd Oct 2004 - Jan 2006Shanghai,CnMajor projects involved; Piping design for vacuum belt filter in secondary dewatering sub-system, FGD Island in power plant, coordinating the civil construction, led the installation and commissioning. Other projects involved in including, Zhenjiang Gao-zi Power-generation plant, State-grid Changzhou Power-generation plant, Nanjing Ban-qiao thermal Power-generation plant (secondary dewatering sub-system, FGD Island)
-
EngineerBeijing Yan-Shan Petro-Chemical Industrial Engineering Co., Ltd Aug 2000 - Sep 2004Beijing City, ChinaFrom: 2000/8 to: 2004/9 Employer: Beijing Yan-shan Petro-chemical Industrial Engineering Co., LtdLatest Positions held: Assistant Engineer, Project EngineerResponsibilities:1. Issue work instruction for piping, structure, pressure test and so on.2. Participate issue construction management plan.3. Advise or guide work team for installation and erection.4. Communications with designer ,the third party and owner’s engineer.5. Inspect material and equipment before delivery.6. Make report to project control department.7. Send material list to purchase department so that they can purchase material in time.8. Other works my lead request.Major projects involved: Rebuilding & Enlarging of 660k tons/year ethylene plant, Beijing Yanshan Petro-chemical IndustryIn charge of the technology in process and piping for the cracking furnace, and responsible for the pipe fabrication for 10# and 11# ethylene cracking furnace and installation of long-distance transmission piping. Project of 900k tons/year ethylene plant, Secco Shanghai Responsible for the installation of the structure engineering, equipments and process pipeing of polystyrene completed plant, and for the testing and commissioning of the process pipeline system. Participated in the bid for Nanjing Yang-ba projects, responsible for the technical documents
Frequently Asked Questions about Stephen Wang
What is Stephen Wang's role at the current company?
Stephen Wang's current role is Project Manager.
What schools did Stephen Wang attend?
Stephen Wang attended 南京化工大学, 上海交通大学.
Not the Stephen Wang you were looking for?
-
1gmail.com
-
-
6hotmail.com, idgtechnetwork.com, idgtechnetwork.com, idgtechnetwork.com, idgtechnetwork.com, idgtechnet.com
2 +164678XXXXX
-
Stephen Wang
Baoshan District -
Stephen Wang
Beijing, China
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial