Have strong troubleshooting skill in technical issues and a good ability of project management.Familiar with TDS 、HPU、HVAC、ENGINE、AIR COMPRESSOR、CRANE, etc.
Shopc Of Sinopec
-
Facility SupervisorShopc Of Sinopec May 2011 - Present1. Responsible for writing the drilling rig equipment repair and maintenance plans and procedures1) According to the company's annual plan, formulate annual work plans and major equipment annual repair and maintenance schedule(such as engine (CAT 3516CHD), HVAC (heating ventilation and air conditioning systems), HPU, Water maker, Air compressor and crane (50T)), etc. and assign the equipment department carry out regularly inspect major equipment, reduce equipment failure rates;2… Show more 1. Responsible for writing the drilling rig equipment repair and maintenance plans and procedures1) According to the company's annual plan, formulate annual work plans and major equipment annual repair and maintenance schedule(such as engine (CAT 3516CHD), HVAC (heating ventilation and air conditioning systems), HPU, Water maker, Air compressor and crane (50T)), etc. and assign the equipment department carry out regularly inspect major equipment, reduce equipment failure rates;2. Responsible for equipment repair, ensure the drilling operation is not suspended1) According to the equipment condition, can timely and accurately find out the causes of equipment breakdown;2) Analyse the equipment fault reason, solve the technical problems in the repair and propose solutions.3. Responsible for supervising the daily maintenance of the equipment, to reduce the daily equipment wear, extend the working life of the facilities1) Draw up routine maintenance procedure;2) Draw up operating Procedure for the facility, organize the training for the worker to guide them use and maintain the facility. File the case which causes the damage of the equipment. Record 20 improper operation, let the operator learn regularly;3)Organize the maintenance person to carry out the inspection of various types of equipment and make records. According to the inspection, timely detect potential 5 facility problems, to avoid the losses of the company;4) Do daily inspection, weekly inspection and monthly inspection strictly in accordance with PMS , avoid equipment failure; 4. Responsible for ordering spare parts. Responsible for the equipment improvement and technical support for procurement,use CATIA soft to draw design drawing for the equipment improvement project and apply the plan to the company;5.Compile HSE system file, revise and improve the HSE file system of the company;6. Project management. Show less
-
Project ManagerShopc Of Sinopec Sep 2009 - Apr 2011Singapore1. Responsible for the project organizational management and team building , strictly implement the rules and regulations of the company, responsible for the implementation the project management objectives, such as the project quality, schedule, cost, safety, etc. 2. Responsible for the validation of the overall project management planning, quality planning, construction organization design; participate in the joint review of the drawings; participate in validation of the special… Show more 1. Responsible for the project organizational management and team building , strictly implement the rules and regulations of the company, responsible for the implementation the project management objectives, such as the project quality, schedule, cost, safety, etc. 2. Responsible for the validation of the overall project management planning, quality planning, construction organization design; participate in the joint review of the drawings; participate in validation of the special construction scheme and the control measures and Responsible for the requirement validation of the project personnel, materials; spare parts, equipment, funds, etc. and shall be responsible for the organizing the implementation, supervision. 3. According to the project plan, responsible for conducting the project work orderly, regularly submitting project implementation table to the leading group. Figure out & report immediately major issues during project work to the project leading group 1) During the implementation of the project work, check the relevant equipment technical data, to ensure that the equipment is installed correctly, Carefully write project record; a) Review the equipment drawings, technical standards, manufacturing process and commissioning procedure, etc. Propose amendments. Supervise the design conform to ABS class, API standards, statutory regulations, and technical operating requirements from construction contract. 2) Responsible for the preparation of the monthly supervision report, the periodic project work report, the specific report and project work summary; 3) Detect and record nonconforming items, At the weekly meeting timely notify PPL shipyard to take measures, and carry out rectification. If PPL can't give us a definite reply, write a report. 4. Responsible for attending equipment factory testing, ensure the equipment in good condition ; the equipment installation process, and responsible for the equipment commissioning work Show less
-
Mechanical EngineerShopc Of Sinopec Dec 2007 - Aug 2009Shanghai City, China1. Reasonably arrange the department work, and compile operations procedure and rules and regulations. Responsible for writing equipment operation and maintenance procedures; conscientiously perform my duties, ensure the team safety as the safety responsibility person; 2. Responsible for maintaining and repair drilling equipments, such as drawworks, iron roughneck, mud pump, air hoist, top-driving(TDS-11S), etc.; 3. Supervise the drilling crew strictly observe the operation manual and… Show more 1. Reasonably arrange the department work, and compile operations procedure and rules and regulations. Responsible for writing equipment operation and maintenance procedures; conscientiously perform my duties, ensure the team safety as the safety responsibility person; 2. Responsible for maintaining and repair drilling equipments, such as drawworks, iron roughneck, mud pump, air hoist, top-driving(TDS-11S), etc.; 3. Supervise the drilling crew strictly observe the operation manual and maintenance schedule; 4. Responsible for conducting technical training and safety production education to the mechanic; 5. Investigate and analyse the equipment accident and timely carry out rectification; 6. Responsible for writing turnaround plans and ordering spare parts plan; 7. According to the requirements of the classification society, do the equipment maintenance work; cooperate with ABS staff or CCS staff in annual check; 8. Responsible for daily check of drilling equipment; 9. Responsible for handling various emergency events, such as pipe-handling of top-driving(TDS-11S) when not working, and other cases in the similar situation. Show less
-
Qulity Control SupervisorShopec Of Sinopec Jul 2005 - Nov 2007Shanghai City, China1. Make sure the thread of casing or drilling pipe meet the API standard; 2. Responsible for API audit,Coordinating the audit on site by API; 3. Responsible for testing the drilling tools with Ultrasonic equipment; 4. Make preventive maintenance plan. Compile maintenance instruction and maintenance record.Supervise equipment workers daily job on repairing and maintenance to ensure the normal operation of equipments;Quickly respond to troubleshooting requests to recover the operating… Show more 1. Make sure the thread of casing or drilling pipe meet the API standard; 2. Responsible for API audit,Coordinating the audit on site by API; 3. Responsible for testing the drilling tools with Ultrasonic equipment; 4. Make preventive maintenance plan. Compile maintenance instruction and maintenance record.Supervise equipment workers daily job on repairing and maintenance to ensure the normal operation of equipments;Quickly respond to troubleshooting requests to recover the operating capacity in time; 5. Work out annual repair plan and preventive maintenance plan; Offer guidance during implement. Update preventive maintenance plan in time. Offer support and guidance during maintenance. Keep the machine running smoothly, reduce down rate as low as possible; 6. Order some spare parts,control spare part type and volume in reasonable; 7. Typical equipment fault analyze, compile manual, and training maintenance operator. Make continues equipment improvement according equipment status; 8. Carry out TPM management. Show less
刘立明 Education Details
-
Machine Design & Manufacturing And Their Automation
Frequently Asked Questions about 刘立明
What company does 刘立明 work for?
刘立明 works for Shopc Of Sinopec
What is 刘立明's role at the current company?
刘立明's current role is SHOPC of SINOPEC & Facility Supervisor.
What schools did 刘立明 attend?
刘立明 attended Daqing Petroleum Institute.
Not the 刘立明 you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial