Electrical Engineer
Current1. Pre SL1 (Safety inspection before turning on electrical equipment)- LOTO (Lock out Tag out) management and protection- Line Check- Resistance measurement- Voltage measurement- Ground resistance measurement2. Preparation of electrical work specifications- Instantaneous power outage compensation device Phase 1- Instantaneous power outage compensation device- Hook Up Equipment in Clean Room- Install additional outlets- Electrical construction for temporary operation: independent cable and power supply- Addition of electric heating duct to disaster prevention room- Installation of heating wire3. Electrical Safety Manager Job Notice- Resistive leakage current measurement- Illuminance measurement- Emergency generator no-load operation- Visual inspection of switchgear and distribution board4. Electrical construction management (safety)- Complete safety work permit and proceed with approval process- Conduct TBM (Tool Box Meeting) before construction begins- Added Clean Room Emergency Phone- Additional CCTV construction- SIPP (Safety Consultation Meeting)5. Shut down the entire building for electrical safety inspection.- Sequential equipment down support in collaboration with the mechanical equipment team- Temporary generator installation and cable laying- Review of generator and crane specifications before installing temporary generator6. Uninterrupted panel cleaning- Clean the panel using insulating material after opening the panel in a live state.- Prepare MSDS and PPE before cleaning8. Support for new office building construction- Participation in factory inspection- Participation in weekly meeting- Preparation of new Office Building Electrical Tool Hook up9. Other- Modification and management of As Built drawings after new construction- Purchase of electrical safety products: measuring equipment, LOTO, insulation products, etc.- Fix lighting control system (Clarus)- Create PR using SAP