Gulf for services and projects GSP Overview
- Headquarters
- Eg
- Industry
- Chemical Manufacturing
- Employees
- 4
- Founded
- 2005
- NAICS
-
Chemical ManufacturingSoap, Cleaning Compound, and Toilet Preparation ManufacturingOther Chemical Product and Preparation Manufacturing
Keywords
About Gulf for services and projects GSP
GSP established in 2005 its services in storing oil & chemical products through its license in Adabyia Suez port Across last 15 years GSP has a record with major prominent names as Unilever, Loaders Croklaan Group, Pacific Interlink, IFFICO & Chevron Our objectives to become one of leading storage service provider through a core competency of its man power & application of proven project management system as from pledges distinct efficiency Our tank terminal is in ElAdabyia made up of 8 Carbon steel tanks with total capacity 10500MT (comprising 5 tanks with capacity of 1200MT each and 3 tanks with capacity 1500MT each) In addition to 2 tanks would be constructed in total capacity 3600MT (1800MT each) Tanks are filled with 3 separate lines of which one for receiving edible oil & remaining are for base oil Thus ensuring in total the purity and avoid contamination during the cargo loading/unloading Port Service: Berthing at Adabyia port Quay no.9 is on a 1st come 1st serve basis shore line length around 750MT Dock hoses are of 6'' diam. Adabyia port Quay no.9 can accommodate the tanker vessel up to max. draft at berth 11.20MT with the size max. LOA berth 200MT and max. draft at approach channel 40 ft/12m Required min. keel clearance of berth min. 1MT, Sea water density of berth 1.029 Hereunder sample of services can be also be provided by GSP: 1.Finishing all customs procedures (customs duties, guarantee letter & insurance documents) before receiving the vessel 2.Hiring a calibration company for checking the tanker quantities before uploading with BOL, Sealing the required shore tanks before the tanker discharge, Samples taken from the tankers before discharging & after uploading the quantities to shore tanks, Remeasure the quantities after tanker discharging to shore tanks 3.Loading into tank trucks at tank truck loading station loading time 15-20 min. for 35MT 4 .GSP representative handles procedures of issuing permits for driver & truck from electronic port system
Gulf for services and projects GSP Contact Details
- People in AeroLeads
- 4
Gulf for services and projects GSP Org Chart
Sample employees and titles| Name | Title | Location | Contact |
|---|---|---|---|
| Gulf for Services and Projects Gsp | Company Owner at Gulf for Services & Projects (Gsp) | Suez, As Suways, Egypt |
View
|
| Marawan Mohamed | Accountant |
View
|
|
| Mohamed Osama | Managing Partner & CEO at Gulf for Services and Projects Gsp | New Cairo, Cairo, Egypt |
View
|
| Ashraf Mowafy | Terminal Manager at Gsp |
View
|
Employees by Management Level
Executive
2 profiles
Manager
1 profile
Individual contributor
1 profile
Compare Similar Companies to Gulf for services and projects GSP
Egyptian Banking Institute
Higher Education
Quality Professionals | QA & Software Testing
It Services And It Consulting
Omid Group | گروه امید
Financial Services
T BAILEY LLC
Construction
Scorpion Arabia
Oil And Gas
Rehabitaire
Health And Human Services
GSP TUTORIAL & CONSULTANCY
Education Administration Programs
Petrosanatsaba
Wholesale Petroleum And Petroleum Products
Graduate Starter Pack - Nile University (GSP)
Education
GSP Group
Fire Protection