Gulfstream LNG Overview
- Website
- www.gulfstreamlng.com
- Industry
- Oil And Gas
- Employees
- 1
- NAICS
-
Oil and Gas Extraction
Keywords
About Gulfstream LNG
The Gulfstream LNG Project will be constructed and located on an approximately 400 acre leased site with approximately 2 miles (3 km) of frontage on the west bank Mississippi River, south of town of Belle Chasse, Plaquemines Parish, Louisiana. The Gulfstream LNG Project site is undeveloped and there is minimal habitation or other activity in the immediate vicinity of the Project site. The water depth at the site is over 50 ft (15 meters) and the river is over 1 km wide. No navigation or depth limitation issues are anticipated at the site. The Project facilities will include: two feed gas processing trains, three LNG trains each with an average base LNG production capacity of approximately 1.4 MTPA, one LNG storage tank and tank protection system, two marine loading berths (one capable of receiving smaller barges and vessels, and one capable of receiving large (>180k m3) ocean-going LNG ships), and an on-site power generation plant. Technical partners for the project include Baker Hughes (for liquefaction trains), Honeywell/UOP (for gas treatment), GTT (for LNG tank technology) and Kiewit (for EPC).
Gulfstream LNG Contact Details
- People in AeroLeads
- 1
Gulfstream LNG Org Chart
Sample employees and titles| Name | Title | Location | Contact |
|---|---|---|---|
| Vivek Chandra | Founder and CEO of Gulfstream Lng |
View
|
Compare Similar Companies to Gulfstream LNG
Energy Transfer
Oil And Gas
Cheniere Energy, Inc.
Oil And Gas
Venture Global LNG
Oil And Gas
Sempra Infrastructure
Oil And Gas
Golden Pass LNG
Oil And Gas
Cameron LNG
Oil And Gas
Commonwealth LNG
Oil And Gas
Glenfarne Energy Transition, LLC
Renewable Energy Power Generation
Texas LNG
Natural Gas Distribution
ARGENT LNG
Oil And Gas