Gulfstream LNG
Company

Gulfstream LNG

Oil And Gas 1 employees
Employees
1

Gulfstream LNG Overview

Industry
Oil And Gas
Employees
1
NAICS
Oil and Gas Extraction
Keywords

About Gulfstream LNG

The Gulfstream LNG Project will be constructed and located on an approximately 400 acre leased site with approximately 2 miles (3 km) of frontage on the west bank Mississippi River, south of town of Belle Chasse, Plaquemines Parish, Louisiana. The Gulfstream LNG Project site is undeveloped and there is minimal habitation or other activity in the immediate vicinity of the Project site. The water depth at the site is over 50 ft (15 meters) and the river is over 1 km wide. No navigation or depth limitation issues are anticipated at the site. The Project facilities will include: two feed gas processing trains, three LNG trains each with an average base LNG production capacity of approximately 1.4 MTPA, one LNG storage tank and tank protection system, two marine loading berths (one capable of receiving smaller barges and vessels, and one capable of receiving large (>180k m3) ocean-going LNG ships), and an on-site power generation plant. Technical partners for the project include Baker Hughes (for liquefaction trains), Honeywell/UOP (for gas treatment), GTT (for LNG tank technology) and Kiewit (for EPC).

Gulfstream LNG Contact Details

People in AeroLeads
1

Gulfstream LNG Org Chart

Sample employees and titles
Name Title Contact
Vivek Chandra Founder and CEO of Gulfstream Lng
View

Compare Similar Companies to Gulfstream LNG