İka İzmir Otoyol Yapım Adi Ortaklığı (IC Ictas - Kalyon - Astaldi) JV
Civil Engineering
Aliağa, Tr
39 employees
- Employees
- 39
İka İzmir Otoyol Yapım Adi Ortaklığı (IC Ictas - Kalyon - Astaldi) JV Overview
- Headquarters
- Aliağa, Tr
- Website
- ikaizmir.com
- Industry
- Civil Engineering
- Employees
- 39
- Founded
- 2017
- Company Email
- Available in AeroLeads
- NAICS
-
Heavy and Civil Engineering ConstructionOther Heavy and Civil Engineering Construction
Keywords
About İka İzmir Otoyol Yapım Adi Ortaklığı (IC Ictas - Kalyon - Astaldi) JV
Izmir-Çandarlı Highway Project Employer: General Directorate of State Highways Contract Date: Apr 2017 Contractor : IC Ictas Insaat – Kalyon Insaat – Astaldi S.p.A Location : İzmir, Turkey Contract Type : Built, Operate and Transfer MENEMEN – ALIAGA- CANDARLI Highway Project involves: The construction of highways and link roads, viaducts, highway bridges between Menemen and Çandarlı port. Total length of project is approximately 76,8km with its connection roads. Fourteen junctions, 3 service areas, 7 motorway toll booths, 10 viaducts, and 11 bridges Highway Lanes: Main road 2x3 lanes, connection road 2x2 lanes Highway Length: 78 km (including connection roads) EUR 333 million of which for construction activities, for approximately 80 kilometres of the Menemen-Aliağa-Çandarlı Motorway in the province of İzmir. The construction activities will be performed by Astaldi (33% stake), with the Turkish companies IC Içtaş (34%) and Kalyon (33%). The transaction’s financial structure calls for the contribution of private capital for an amount equal to 20% of the total investment, which for Astaldi translates to approximately EUR 26 million to contribute by the end of the construction period. Operation activities call for a minimum guaranteed revenue guaranteed by the grantor, totalling EUR 45 million/year. Fourteen junctions, 3 service areas, 7 motorway toll booths, 10 viaducts, and 11 bridges are planned, in addition to the performance of all O&M (Operation and Maintenance) activities. The duration of the concession is equal to approximately 10 years, with 36 months for the construction phase and the remaining period for operation. The project’s customer is KGM, the General Directorate of Motorways of Turkey’s Ministry of Transport, which operates as Grantor. The tender process for Izmir-Menemen-Aliağa-Çandarlı Highway Project, which will connect Izmir to Çandarlı Port, has bee
İka İzmir Otoyol Yapım Adi Ortaklığı (IC Ictas - Kalyon - Astaldi) JV Contact Details
- People in AeroLeads
- 1
İka İzmir Otoyol Yapım Adi Ortaklığı (IC Ictas - Kalyon - Astaldi) JV Org Chart
Sample employees and titles| Name | Title | Location | Contact |
|---|---|---|---|
| Mert Tutar | Mining Engineer - İKa İZmir Otoyol | Türkiye, Turkey |
View
|
Employees by Management Level
Individual contributor
10 profiles
Senior / Lead
1 profile
İka İzmir Otoyol Yapım Adi Ortaklığı (IC Ictas - Kalyon - Astaldi) JV Tech Stack
Engineering
3 profiles
Compare Similar Companies to İka İzmir Otoyol Yapım Adi Ortaklığı (IC Ictas - Kalyon - Astaldi) JV
RÖNESANS HOLDİNG
Holding Companies
Kalyon Holding
Construction
IC İÇTAŞ İNŞAAT / IC ICTAS CONSTRUCTION
Construction
Kuzey Marmara Otoyolu İşletmesi (KMO)
Construction
ICA Yavuz Sultan Selim Köprüsü ve Kuzey Çevre Otoyolu İşletmesi
Highway, Street, And Bridge Construction
Gebze - İzmir Otoyolu İşletme ve Bakım A.Ş.
Facilities Services
IC İÇTAŞ ENDÜSTRİYEL / IC ICTAS INDUSTRIAL
Construction
IC İçtaş Enerji
Investment Management
OTOYOL YATIRIM VE İŞLETME A.Ş
Investment Management
Kuzey Ege Otoyolu
Construction