Company Details
- Employees
- 8
- Founded
- -
- Address
- Villa 54, Street 68, 2nd District, Zone 6,5th Settlement, New Cairo, Cairo,egypt
- Industry
- Engineering Services
- NAICS
-
Engineering Services
- Website
- http://www.t-square.net
- Keywords
- Process and Piping Design, • Feasibility Studies: Assesses the technical, economic, and environmental viability of the project, market demand, technologies, and potential risks., • Process Optimizations: Improving the efficiency and performance of process units through design modifications or operational changes., • HAZOP Study: identify and assess risks associated with the operation of the system and to propose appropriate measures to mitigate or eliminate these risks, thus ensuring safe and efficient operation., • Flow Assurance: Comprehensive analysis to identify & mitigate potential issues that could impede the flow of fluids within the production system. This includes addressing challenges such as start-up, bigging, ramp-up, hydrate formation, wax deposition, and slugging phenomena., • Process Hazard Analysis (PHA): Identifying and assessing potential process hazards, such as fires, explosions, and toxic releases., • Safety and Risk Assessment: Process safety, occupational safety, environmental risks, and emergency response planning., • Quantitative Risk Assessment (QRA): Quantitative estimation of consequences and probabilities of various hazardous events, such as fires, explosions, or chemical releases., • Fire & Gas Mapping: Optimize the placement and configuration of fire and gas detectors to ensure adequate coverage and timely response to potential incidents such as fires, gas leaks, or toxic releases., o Environmental Impact Assessment (EIA): Identify potential environmental impacts of the project throughout its lifecycle to comply with regulations and implement necessary mitigation measures., • Electrical Load Analysis: Determining the electrical load requirements for the project, including power consumption by equipment and facilities., • Safety Integrity (LOPA): Detailed review of all Safety Instrumented Functions (SIFs) to confirm adequate configuration, reliability, and effectiveness of safety systems in reducing risk to an acceptable level., • Alarm Management & Rationalization: Structured review of all alarms to determine their necessity, significance, and response requirements to meet AMS KPIs and improve plant safety and availability., • Cybersecurity: Assessing the cybersecurity risks associated with critical infrastructure and propose measures to protect against cyber threats, and • Operational Readiness: Independent project assessment to that all aspects of a system, facility, or project are fully prepared and equipped to begin or resume operations safely and efficiently..
- HQ
- Cairo