Are Technical
CurrentNeelum Jhelum Consultants NJC, Supervising 969 MW Neelum Jhelum Hydroelectric Project AK. Responsibilities. 1. Drill and Blast Tunnels.• Geological mapping and identification of faults and shear zones in tunnels. • Monitoring instruments data analysis & tunnel deformation reports of 54 convergence stations and 1 extensometer. • Tunnel Drill and Blast production sheets and down time calculations.• Grouting works in tunnels including consolidation, backfill and contact… Show more Neelum Jhelum Consultants NJC, Supervising 969 MW Neelum Jhelum Hydroelectric Project AK. Responsibilities. 1. Drill and Blast Tunnels.• Geological mapping and identification of faults and shear zones in tunnels. • Monitoring instruments data analysis & tunnel deformation reports of 54 convergence stations and 1 extensometer. • Tunnel Drill and Blast production sheets and down time calculations.• Grouting works in tunnels including consolidation, backfill and contact grouting especially through pipe canopy in tunnel collapse sections. • Support works by Q-system.• Hydrojecking and Over coring, in-situ tests in Tunnels, suggested locations for boreholes and analysis of reports checked. • Support items checked for IPCs.• Project Final Report writing. 2. TBM Tunnels.• Tunnels Deformation Monitoring.• Monitoring instruments data analysis & tunnel deformation reports of 89 convergence stations and 16 extensometers.• Tunnel Seismic Tomography TST and back analysis reports.• Comparison reports for TST predictions with as built geology.• Rock burst in tunnels initial assessment and analysis in sandstone and additional supports.• Laboratory tests reports for shotcrete in tunnels.• Working as part of Project Final Report writing. Show less