AeroLeads people directory · profile

Abu Sayed Email & Phone Number

Principal Process Engineer -III at Worley
Location: Canada 9 work roles 3 schools
LinkedIn matched
✓ Verified Jul 2026 3 data sources Profile completeness 100%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Principal Process Engineer -III
Location
Canada

Who is Abu Sayed? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Abu Sayed is listed as Principal Process Engineer -III at Worley, based in Canada. AeroLeads shows a matched LinkedIn profile for Abu Sayed.

Abu Sayed previously worked as Principal Process Engineer -III at Worleyparsons, Edmonton Ab and Condition Monitoring System (CMS) Specialist at Perennial Innovation Limited. Abu Sayed holds Master'S Degree, Petroleum Engineering from University Of Alberta.

Company email context

Email format at Worley

This section adds company-level context without repeating Abu Sayed's masked contact details.

Worley

Review company-level records connected to Abu Sayed before choosing the right outreach path.

Profile bio

About Abu Sayed

PROFESSIONAL SUMMARYProfessional Engineer with 20+ years of diversified experience in engineering consultancy, project management, financial analysis for industry-leading companies and organizations. Adept in a range of industries with oil and gas, distribution, infrastructure in project feasibility study, project reliability modeling, reliability availability and maintainability study, maintenance plan development, risk based mechanical integrity, life cycle cost analysis, development of bill of materials, and functional location structure. Possess wide range of experience in effective forecasting, budget development and management, bid preparation and evaluation, planning scheduling, cost control, progress measurement and performance monitoring, change order management, trend analysis, contract administration, procurement and business development. Core Expertise and Competencies: Reliability Modeling and Calculation Reliability Availability and Maintainability (RAM) study

Listed skills include Maintenance Procedure Writing, Risk Based Inspection Analysis, Bill Of Materials, Technical Report Writing, and 1 others.

Current workplace

Abu Sayed's current company

Company context helps verify the profile and gives searchers a useful next step.

Worley
Worley
Principal Process Engineer -III
Canada
AeroLeads page
9 roles · 28 years

Abu Sayed work experience

A career timeline built from the work history available for this profile.

Principal Process Engineer -Iii

Canada

Principal Process Engineer -Iii

Current
Worleyparsons, Edmonton Ab

Edmonton, Ab

Client: Suncor Energy Inc., PMC, AB CanadaProject: Diluted Bitumen Quality NRU (Naphtha Recovery Unit) Revamp Project- DBM Phase, ABScope/Description: Executed the Reliability, Availability, and Maintainability (RAM) study to validate the Availability of NRU Revamp Project based on the design configuration, installed sparing strategy, and equipment intrinsic capacity of both new and existing equipment items.Project: Plains Midstream Canada (PMC) Empress IV Optimization Project, AB Scope/Description: Executed the reliability analysis (RAM) for Empress IV Optimization Project based on the design/process configuration. The analysis was comprised with both existing and new equipment items for finding out the equipment criticality list, and operational availability of the plant.

Jul 2019 - Present

Condition Monitoring System (Cms) Specialist

Perennial Innovation Limited

Edmonton Ab

Client: Wajax, Calgary ABProject: Condition Monitoring System Development for Ojibway Salt Mine (K+S Canadian Salt Ltd, Windsor, ON) Underground Equipment. Scope/Description: Design, selection, purchase and supply of instrumentation (sensor, associated connectors, wiring and switch BNC box) for four different transporter lines of the underground mining. Also preparing the engineering package for Installation, Commissioning, Operating and Maintenance procedure of this CMS project.

Jan 2019 - Jun 2019

Senior Asset Management Consultant

Phoenix Engineered Solutions Inc.

Edmonton Ab

Client: ENMAX Power Corporation, AB; Merck, NC USA Project: District Energy System (DES) Edmonton ProjectScope/Description: Project feasibility study, cost of ownership analysis, and calculate level of service for DES Edmonton by estimating probability that this system will produce a specified thermal energy output of hot water for stated boiler configurations. The scope was included to: i) develop different models based on Project P&ID, flow diagram, customer demand (present and future), and regulatory consideration; ii) develop spreadsheet for project cost estimation and assign cost such as total installation cost (TIC); operational & maintenance cost, lost opportunity cost and utility cost, iii) assign formulae and necessary logics to calculate cost of ownership considering 40 years of project life time; and iv) develop and prepare project risk register of selected model.Project: Project C/CMV Launch Facility Design- Durham, NC Scope/Description: Executed the reliability analysis for the Project C/CMV Launch Facility assets and associated utilities design. The scope was included to: i) formulate and model the RBD, failure models and reliability information of the Project C/CMV Launch Facility. Review the RAMS analysis results related to the Operational Availability for the Base Case, and the facility supply Asset Criticality List that indicates the equipment ranked in importance based on their contribution to production losses due to unplanned and planned maintenance activities; ii) evaluate whether the Operational Availability criteria is achievable for the Project C/CMV Launch Facility assets and associated utilities design established during the Basis of Design (BOD) and Front-End Planning (FEL-3) phase; and iii) provide recommendations on how to improve overall Operational Availability of the Base Case – based on the results of the Facility Supply Asset Criticality List.

2017 - 2019 ~2 yrs

Project Manager

Ibi Group Professional Services

Fort Mcmurray Ab

Clients: Regional Municipality of Wood Buffalo (RMWB), Alberta Municipality Affairs Responsibility: The responsibility of each project was but not limited to: i) evaluate bid/tender documents, selection of contractors and monitor project activities; ii) ensure that all project scopes are designed in accordance with all regulations, policies, applicable industry codes and corporate standards; iii) prepare and oversaw ongoing projects’ overall activities that compliance with drawings and clients’ expectation; iv) manage multiple sub-contractors and their cost reporting, verify LEMs and approved contractors’ final invoicing. Also prepared project proposal, specification, bid documents, scheduling, and cost estimation of any upcoming project opportunities. Some of the major projects: • Mills Avenue Storm Water Management – Storm Sewer & Outfall Upgrade, Fort McMurray, AB • 2016 Wildfire Firebreak Drainage Improvement Project, Fort McMurray, AB • Engineering Consultants for Wildfire Water & Sewer Repairs, Fort McMurray, AB• Road Condition Assessment Report Post Fire Damage, Fort McMurray, AB

2015 - 2017 ~2 yrs

Mechanical Engineer (Reliability And Maintenance Excellence Engineer)

Jacobs Canada Inc.

Fort Mcmurray And Edmonton Ab

Clients: Nexen, AB; Shell, AB; Husky, AB; and Aramco, Saudi Arabia. Projects:• Nexen Long Lake Facility Maintenance Work Instructions Development ProjectScope/Description: Project was involved to develop major overhaul, minor overhaul, and removal/ reinstatement corrective maintenance (CM) procedures for 20 bad actors at the Nexen Long Lake (LL) facility. • Shell Albian Sand’s Reliability Phase-2 Project – In Operation Scope/Description: Developed bill of materials (BOM) and functional location (Floc) structures in SAP for different equipment items of Albian’s breaker feed conveyor system. • Shell Carmon Creek Project- Casting Vent Gas (CVG) and Emulsion Pipeline Integrity Threat Assessment (Design Phase) Scope/Description: Conducted corrosion simulation by Computational Fluid Dynamics (CFD) to assess water accumulation in CVG line and sediment settling in emulsion line. • Ras Tanura Refinery North Sour Water Stripper Corrosion Management Program Scope/Description: Project was included to develop the Corrosion Management Program for the Install Sour Water Stripper - Ras Tanura Refinery Project as per SAEP-14 requirements in accordance with Section 8 of Saudi Aramco Engineering Standard SAES-L-133. • Shell MRM Power Distribution Upgrade Project Reliability Availability Maintainability (RAM) Study• Nexen Oil Sands Long Lake Diluent Tank Project RAM Study • Husky Energy Sunrise Phase 1 and 2A RAM Study

2011 - 2015 ~4 yrs

Safety Coordinator/ Watch

United Safety Ltd.

Edmonton Ab

Clients: Suncor Energy Inc. -Edmonton Refinery, Husky Energy - Ram River Sour Gas Plant , Devon Energy– Jackfish SAGD Project, Trans Alta - Sundance Power Plant , Shell Canada -Jumping Pound Gas Complex, and ConocoPhillips - Surmont SAGD Project.Scope/ Responsibility: i) Interfaced with Project Coordinator / Manger and work with field supervision to identify and develop corrective actions for hazardous work conditions or unsafe employee actions; ii) provided assistance to project and department management personnel to ensure compliance with all safety, accident and fire programs, procedures and policies; iii) interfaced and coordinated regularly with H&S representatives from other functional units to share successes, best practices and ensure the alignment of policies and procedures; iv) monitored and maintained the safety documentation, track hazard assessments; and reports on the overall effectiveness of the safety program; and v) conducted incident investigations and corrective actions when required using established incident investigation principles, and ensured data is captured effectively.

2009 - 2010 ~1 yr

Full Time Study At University Of Alberta In Master’S Program

Edmonton Ab

School of Mining and Petroleum Engineering Master’s Final Project Report: Production System Analysis of SAGD Wells Scope/Description: The purpose of this report was to demonstrate the production system analysis of a typical Steam Assisted Gravity Drainage (SAGD) process for in situ heavy oil extraction. The effect of reservoir parameters and operating conditions on the perspective of production system optimization was described in the report. Numerical reservoir simulation was done to get the IPR (Inflow Performance Relationship) by using commercial CMG’s STARS simulation software; and an analytical model was developed to calculate the pressure drop along the production tubing. Finally, optimum production tubing size was found out by applying NODAL analysis method.

2007 - 2009 ~2 yrs

Mechanical Engineer/ Project Engineer

Multiple Positions At Different Organizations In Bangladesh

Some of the Major Projects:• Feasibility Study and Detail Design of City Water Supply and Sanitation Project- Main part of this project was 2.23 million gallon/day capacity of a water treatment plant and 4.5 km water pipe line from raw water intake system to main settling tank of the water treatment plant. My job scope was to design and select pumps, valves, piping support, joints, equipment/plant layouts, process flow diagrams, process and instrumentation diagrams, control philosophies and control sequence charts. Prepared BOQ, data sheets for pumps, valves, and piping specialty items. • Fourth Dhaka Water Supply Project - The scope of work was to design, drawing, cost estimation, and to prepare the installation and operation instructions of setting out of high capacity vertical axial flow submersible propeller pumps at the river side for raw water supply to the main water treatment plant. The project was consisted with 5 nos. of pumps of 7440 m3/hr capacity. • Urgent Sewerage Rehabilitation and Expansion Project (Package II) - The project consisted of 4 pump stations at different location of the city. The scope of work was to plan and implement the maintenance works of mechanical machineries like: pump (different types and capacities), hydro pneumatic system, electric motor, different valves and, fittings.

1999 - 2007 ~8 yrs
3 education records

Abu Sayed education

FAQ

Frequently asked questions about Abu Sayed

Quick answers generated from the profile data available on this page.

What company does Abu Sayed work for?

Abu Sayed works for Worley.

What is Abu Sayed's role at Worley?

Abu Sayed is listed as Principal Process Engineer -III at Worley.

Where is Abu Sayed based?

Abu Sayed is based in Canada while working with Worley.

What companies has Abu Sayed worked for?

Abu Sayed has worked for Worley, Worleyparsons, Edmonton Ab, Perennial Innovation Limited, Phoenix Engineered Solutions Inc., and Ibi Group Professional Services.

How can I contact Abu Sayed?

You can use AeroLeads to view verified contact signals for Abu Sayed at Worley, including work email, phone, and LinkedIn data when available.

What schools did Abu Sayed attend?

Abu Sayed holds Master'S Degree, Petroleum Engineering from University Of Alberta.

What skills is Abu Sayed known for?

Abu Sayed is listed with skills including Maintenance Procedure Writing, Risk Based Inspection Analysis, Bill Of Materials, Technical Report Writing, and Mechanical Engineering.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Abu Sayed you were looking for.

View similar profiles