AeroLeads people directory · profile

Adrian Vosloo Email & Phone Number

Senior Controls Manager at Watercare Services Limited
Location: New Zealand 6 work roles 1 school
1 work email found @xtra.co.nz LinkedIn matched
✓ Verified Jul 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email v****@xtra.co.nz
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Senior Controls Manager
Location
New Zealand
Company size

Who is Adrian Vosloo? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Adrian Vosloo is listed as Senior Controls Manager at Watercare Services Limited, a with 891 employees, based in New Zealand. AeroLeads shows a work email signal at xtra.co.nz and a matched LinkedIn profile for Adrian Vosloo.

Adrian Vosloo previously worked as Contracts and Cost Intelligence Engineer at Watercare Services Limited and Senior Project Manager at Stellar Projects at Stellar Projects Ltd.. Adrian Vosloo holds Msc Eng, Engineering from University Of Kwazulu-Natal.

Company email context

Email format at Watercare Services Limited

This section adds company-level context without repeating Adrian Vosloo's masked contact details.

{last}@xtra.co.nz
86% confidence

AeroLeads found 1 current-domain work email signal for Adrian Vosloo. Compare company email patterns before reaching out.

Profile bio

About Adrian Vosloo

 Over 25 years experience with complex infrastructure projects and 20 years experience in a senior management role with local government and Council owned utility businesses providing water supply, wastewater and stormwater services to small and large communities. Successfully delivered as Program Director the installation of large diameter sewer and water trunk mains including outfalls, using open trench and tunneling construction methods (i.e. micro tunneling , HDD) individual projects costing up to $116 million. Experience in delivering major new wastewater treatment plants and upgrades as well as sewer pump stations and sewer transfer schemes individual projects costing up to A$120 million. Rehabilitation/relining of deep (up to 30m), large diameter (up to 1500 mm) sewers using finite element modelling techniques for accurately determining loads on the sewer and allow design for full structural loading. Over the last 20 years working with Council and utility businesses gained experience with the operation and maintenance of infrastructure assets and the management of asset renewal programs.  Managed the development of catchment/zone management/master plans and feasibility reports including optimising investigations and level of design for each project implementation stage.  Regional planning experience with water supply and river basin studies, strategic planning experience with all 3 waters including the development of long term project plans to meet corporate strategic objectives. Have successfully developed high performing asset management, infrastructure planning and project implementation teams. Experience in managing complex, large value professional service and physical works contracts. Developed experience in transforming a team from an annual asset centric infrastructure capital investment approach to a customer centric program management approach.

Listed skills include Leadership, Project Planning, Information Management, Sewer, and 22 others.

Current workplace

Adrian Vosloo's current company

Company context helps verify the profile and gives searchers a useful next step.

Watercare Services Limited
Watercare Services Limited
Senior Controls Manager
newmarket, auckland, new zealand
Website
Employees
891
AeroLeads page
6 roles

Adrian Vosloo work experience

A career timeline built from the work history available for this profile.

Contracts And Cost Intelligence Engineer

Auckland, New Zealand

Key Achievements:• Developed and operationalised a Watercare cost estimation system -I prepared a cost estimation manual and policy.• Developed a Watercare Cost Database and cost Work Breakdown Structure and developed Cost Estimate templates.• Prepared numerous contract documents, negotiated prices and managed departures and clarifications.

Aug 2020 - Dec 2022

Senior Project Manager At Stellar Projects

Auckland, New Zealand

Provided advice and assistance with the following:Program Management- Asset assimilation, investment smoothing and portfolio review- Procurement management- Business case development- TOTEX approach - Eliminate root cause; Operate differently; Improve asset capability; New asset- Program Management Office developmentProject ManagementConstruction ManagementPlanning Studies and Asset Management

Aug 2019 - Jul 2020

Program Director Major Projects

Brisbane, Australia

Managed the team responsible for the planning, design and implementation of a number of major wastewater treatment plant and large diameter sewer and water-main augmentation and rehabilitation projects with individual projects costing up to A$120 million. Gained experience in transforming a utility capital works program from an annual delivery cycle to longer term investment cycles with a comprehensive benefits realisation approach. Major Projects:- Bartleys Hill / Wellers Hill water main zone connection and river crossing - A$25 m - a 700 mm diameter water main crossing the Brisbane river, using the directional drilling technique - Bulimba Creek Tunnel sewer stage 2 upgrade project - A$54 m - 4.2 km sewer 1500 mm in diameter using the micro-tunneling technique - Woogaroo Creek Tunnel and Bundamba main sewer projects - A$75 m - micro tunneling and open trench sewers projects up to 1350 mm in diameter.- S1 main sewer rehabilitation project - A$74 m - relining a major sewer located along the busiest roads in Brisbane CBD, with diameters up to 1500 mm and up to 30m deep, built 100 years ago by constructing a tunnel and cast in-situ a mass concrete pipe. Finite element modelling was used to determine likely loads on the sewer.The project has won a number of awards. - Lowood & Fernvale sewerage treatment plant and transfer scheme - A$45 m - a 8800 EP WWTP in Lowood, an 8 km sewer rising main transfer system from Fernvale and two new sewerage pump stations. - Goodna WWTP stage 4A upgrade - A$120 m – an oxidation ditch MBR plant which has increased the capacity by over 90,000 EP and meets the 3N:1P ratio license condition. This project has won 3 prestigious awards.- Grey Street sewer pump station relocation - A$17 m – relocation of a sewer pump station on a high traffic road to accommodate a transport tunnel project.

Nov 2010 - Jul 2019

Planning & Projects Group Manager

North Shore City Council

Planning and Projects Group Manager responsible for providing effective leadership and management of the Planning and Projects Group which is responsible for:• Ensuring the capital works for the three water networks (water supply, wastewater and stormwater) and the wastewater treatment plant are planned to meet the long term needs of the city• Ensuring the delivery of capital programmes for the three water networks and the wastewater treatment plant meet Council objectives• Ensuring best asset management practices are used to deliver the agreed service levels. Responsible for leading and managing the infrastructure planning team, asset management team and four project delivery teams consisting of 44 engineers, environmental scientists, hydraulic modellors and information system specialists and an annual budget varying from NZ$ 60 to 100 million per annum. The North Shore City Council is an urban city with a population of 220,000.Key Achievements:• For the last five years the Planning & Projects group delivered over 95% by value against planned for replacement and new capital projects.• Developed a pro-active, continuous improvement team culture where the group is involved with a number of world leading technologies (i.e. sewer rehabilitation and relining, directional drilling and micro tunneling of pipelines, stream management, low impact stormwater urban designs, development of real time asset management data capture tools and systems, WWTP cell lysis process) resulting in sought after positions within the group and consultants wanting to work on our projects.• North Shore water and wastewater was recognized as being in the top 3 organizations for 4 of the 7 functional areas in the Water Services Association of Australia 2008 Asset Management benchmarking exercise carried out by 42 organizations worldwide, namely; asset acquisitions, asset maintenance, asset operation and renewal and replacement management.

Dec 2001 - Oct 2010

Director

Bosch & Associates Sa Ltd Consulting Engineers

Senior Engineer responsible for the marketing and implementation of all irrigation and rural development projects. Involved in the planning and design of urban water supply schemes, bulk water supply schemes and large pump stations. Responsible for investigating wastewater disposal systems in rural communities. Also specializing in the hydraulic and surge (Water Hammer) analysis of pipe work for large pump stations and pipelines for potable water, petroleum products and industrial effluent.• In March 1995 appointed as a Director of Bosch & Associates and Manager of the Rural Development and Irrigation Division. Responsible for securing work for this division and also for managing the information systems requirements of the company (i.e. computer hardware and software). The B&A Group employed approximately 250 to 300 people and Bosch & Associates employed 50 engineers.

Apr 1991 - Dec 1997
Team & coworkers

Colleagues at Watercare Services Limited

Other employees you can reach at watercare.co.nz. View company contacts for 891 employees →

1 education record

Adrian Vosloo education

FAQ

Frequently asked questions about Adrian Vosloo

Quick answers generated from the profile data available on this page.

What company does Adrian Vosloo work for?

Adrian Vosloo works for Watercare Services Limited.

What is Adrian Vosloo's role at Watercare Services Limited?

Adrian Vosloo is listed as Senior Controls Manager at Watercare Services Limited.

What is Adrian Vosloo's email address?

AeroLeads has found 1 work email signal at @xtra.co.nz for Adrian Vosloo at Watercare Services Limited.

Where is Adrian Vosloo based?

Adrian Vosloo is based in New Zealand while working with Watercare Services Limited.

What companies has Adrian Vosloo worked for?

Adrian Vosloo has worked for Watercare Services Limited, Stellar Projects Ltd., Queensland Urban Utilities, North Shore City Council, and Bosch & Associates Sa Ltd Consulting Engineers.

Who are Adrian Vosloo's colleagues at Watercare Services Limited?

Adrian Vosloo's colleagues at Watercare Services Limited include Allan Brean Alvarez, Matt Patel, Sheila Brown, Nick Van Burick, and Nuku Kahui.

How can I contact Adrian Vosloo?

You can use AeroLeads to view verified contact signals for Adrian Vosloo at Watercare Services Limited, including work email, phone, and LinkedIn data when available.

What schools did Adrian Vosloo attend?

Adrian Vosloo holds Msc Eng, Engineering from University Of Kwazulu-Natal.

What skills is Adrian Vosloo known for?

Adrian Vosloo is listed with skills including Leadership, Project Planning, Information Management, Sewer, Wastewater Treatment, Water, Water Supply, and Contract Management.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Adrian Vosloo you were looking for.

View similar profiles