Twenty years of road and bridge CEI experienceCurrent FDOT CTQP certifications in Final Estimates (Levels 1 and 2), Earthwork (Levels 1 and 2), Asphalt (Levels 1 and 2), Concrete, Pile Driving, Drilled Shaft Inspection, and QC Manager.Current Florida Advanced Maintenance of Traffic, American Concrete Institute (ACI) Concrete Field Testing Technician Level I, FDEP Stormwater Management Inspection, and CPN Nuclear Gauge Safety certificationsSubmitted final estimates for several FDOT Projects in Northeast Florida (District 2), including I-295 From the Buckman Bridge ($18M); J. Turner Butler Blvd Resurfacing and Reconstruction from Kernan Blvd to San Pablo Parkway ($32M); SR 200 (AIA) from Stratton Blvd to Griffin Rd ($29.3M); SR 115 (MLK Blvd) from 21st Street to Tallyrand Ave (30.8M); all projects were successfully completed with positive feedback from the client.Specialties: Experienced in various construction project-related duties including preparation of project final estimate packages; monthly progress estimate preparation/processing; contractor' submittals, project document, and drawing control; contract modifications and time extensions, including cost-proposal analysis and engineer’s estimates for unforeseen work; project pre-construction and close-out activitiesCross-trained and certified to assist in inspection of contractor's operations and project QA reviews.
Listed skills include Road, Construction, Concrete, Civil Engineering, and 16 others.