Quality Engineering Intern
Gathered energy baselines from high-energy-consuming equipment, refreshed the equipment inventory, and revised the overall energy consumption data for the Watertown location. Completed FMEA (Failure Mode and Effects Analysis) documentation for cells that constructed wastewater, gray water, and freshwater units for transit trains. This permitted.