Antonio Lau
AeroLeads people directory · profile

Antonio Lau Email & Phone Number

Professional Engineer at Ovintiv
Location: Greater Calgary Metropolitan Area, Canada 15 work roles 5 schools
1 work email found @fluor.com LinkedIn matched
✓ Verified August 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email a****@fluor.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Professional Engineer
Location
Greater Calgary Metropolitan Area, Canada
Company size

Who is Antonio Lau? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Antonio Lau is listed as Professional Engineer at Ovintiv, a with 3017 employees, based in Greater Calgary Metropolitan Area, Canada. AeroLeads shows a work email signal at fluor.com and a matched LinkedIn profile for Antonio Lau.

Antonio Lau previously worked as Project Manager - Operations Engineering at Ovintiv and Technical Design Lead / Pipeline Project Engineer / Field Engineer at Fluor Corporation. Antonio Lau holds Bachelor Of Science (B.Sc.), Mechanical Engineering from The University Of Calgary.

Company email context

Email format at Ovintiv

This section adds company-level context without repeating Antonio Lau's masked contact details.

{first}.{last}@fluor.com
86% confidence

AeroLeads found 1 current-domain work email signal for Antonio Lau. Compare company email patterns before reaching out.

Profile bio

About Antonio Lau

I am an Alberta registered Professional Engineer with combined 17 years of Pipeline/Facility Engineering, Project Engineering, Project Management, and CADD design experience in the oil and gas industry. I have technical and management experiences on upstream gathering/injection pipeline systems, midstream transmission pipelines, sweet/sour oil batteries, natural gas/NGL processing plants, blending/trucking/storage terminals, pump/compressor stations, and SAGD flowlines/facilities.As a former Design Lead and Drafting Manager, I place high emphasis on drawing quality and presentation. Meanwhile working as Lead Pipeline/Mechanical Engineer, I direct a team of professionals to deliver optimized solutions and solve engineering problems. And as Project Manager/Engineer, leveraging from my technical background, I enforce effective work process and establish clear communication with the clients. I am an excellent team leader with expertise in project execution.

Listed skills include Project Engineering, Piping, Petroleum, Pipelines, and 46 others.

Current workplace

Antonio Lau's current company

Company context helps verify the profile and gives searchers a useful next step.

Ovintiv
Ovintiv
Professional Engineer
denver, colorado, united states
Website
Employees
3017
AeroLeads page
15 roles

Antonio Lau work experience

A career timeline built from the work history available for this profile.

Project Manager - Operations Engineering

Current

500 Centre St S, Calgary, Alberta, Canada

Managing operation related MOC projects in the Dawson Creek area.- gas compressor engine and cooler upgrades- gas compressor variable volume pocket installation- separator optimization- equipment winterization- piping and control valve replacements- pump package reactivation- security cameras installation- flare stack replacement- pipeline abandonment- facility N2 conversion

Feb 2023 - Present

Technical Design Lead / Pipeline Project Engineer / Field Engineer

Current

55 Sunpark Plaza Se, Calgary Ab, Canada T2X 3R4

CNOOC K1A Pipeline Replacement (Detailed Engineering, Construction Support)Buried high temperature NPS 22/16 Produced Emulsion and NPS 12/18 Boiler Feed Water insulated Pipe-in-Pipe pipeline systems, with twelve HDD/DPI grouted and cased trenchless crossings along a 10 km right-of-way, between Long Lake Central Processing Facility and Kinosis Steam Generation Facility south fo Fort McMurray.

Aug 2019 - Present

Onshore Pipeline Engineering Lead

55 Sunpark Plaza Se, Calgary Ab, Canada T2X 3R4

Enbridge Westcoast Gas Connector Transmission pipeline project (Pre-FEED, FEED)New NPS 48, 600km, gas transmission pipeline starting from Compressor Station 2 west of Chetwynd to Nasoga Gulf at the west coast of British Columbia.

Sep 2021 - Apr 2022

Pipeline Project Engineer

55 Sunpark Plaza Se, Calgary Ab, Canada T2X 3R4

LNG Canada Facility Pipelines Installation (Detailed Engineering)NPS 30, 4km long, HDPE pipeline bring source water to central processing facility; two NPS 30, 4km long, HDPE pipeline taking effluent from central processing facility to offshore; one NPS 24 firewater pipeline for supplying emergency water supply; and one NPS 4 potable water pipeline for supplying drinking water to remote offices.

Jan 2020 - Oct 2020

Lead Mechanical Engineer

200, 37 Quarry Park Blvd Se, Calgary

Project Involvement:- Husky Saskatchewan Gathering System Phase 4: Rush Lake 2, Dee Valley, Spruce Lake Central & North Leg expansion; LACT building, and Blend/Condensate pipelines installation.- Husky Saskatchewan Gathering System Phase 5: Spruce Lake North, Edam Central & Spruce Lake East expansion; LACT building, and Blend/Condensate pipelines installation. - Husky Cold Lake Gathering System: Blackpearl Onion Lake expansion between Alberta and Saskatchewan; LACT building, and Blend/Condensate pipelines installation. Management Skills:- Schedule / budget reporting- Discipline staffing plan and coordination- Project execution optimizationTechnical Skills:- LACT building design and construction support (consist of booster pumps, shipping pumps, analyzer pump, static mixer, and strainers)- Chemical injection building design- CWP/EWP compilation- Equipment and piping material evaluation- Handle RFI from construction site- Inspection report review- Fabrication shop visits

Apr 2018 - Aug 2019

Project Manager / Lead Engineer

200, 37 Quarry Park Blvd Se, Calgary

Project / Proposal Involvement:- TransCanada Pipeline Grande Prairie Mainline Loop 2 Wapiti River Crossing: Proposal, FEED and Detailed Engineering of NPS 36 replacement pipeline and valve stations tie-in, upstream and downstream of a new 1.7 km HDD river crossing. Project scope also involved stopple by-pass installation and crossover connections within the pipeline corridor.Management Skills:- Project proposal review and cost estimate development- Weekly progress / budget reporting to client- Action, risk, decision, and change tracking- Project execution plan review- Discipline coordinationTechnical Skills:- Pipeline class location assessment- Design basis memorandum- Crossing method assessment- Design optimization

Dec 2017 - Mar 2019

Pipeline Engineer

200, 37 Quarry Park Blvd Se, Calgary

Project Involvement:- Enbridge Spruce Ridge Program: Installation of 24km NPS 36 Chetwynd pipeline loop and crossover/blowdown stations in British Columbia.- Enbridge Spruce Ridge Program: Installation of 13km NPS 24 Aitken pipeline loop and crossover/blowdown stations in British Columbia.- Enbridge Gas Distribution: Don River Microtunnel Crossing pipeline replacement project in Ontario- TransCanada Keystone XL pipeline: NPS 36 pipeline from Hardisty, Alberta to US border in SaskatchewanTechnical Skills:- Develop pipeline crossing permit drawings- Review pipeline alignment sheets- Review crossing design report and crossing lists.- Review station P&ID, Gas, and Isometrics- Site survey scope of work and review- Material requisitions on line pipe, fittings, valves, external coating, and induction bends- Material bid evaluations

Sep 2017 - Oct 2018

Lead Pipeline/Piping Engineer

55 Sunpark Plaza Se, Calgary Ab, Canada T2X 3R4

Project Involvement:- Encana Cutbank Ridge Program - Lead Pipeline Engineer- Enbridge Alliance - Lead Piping/Pipeline EngineerManagement Role:- Staff planning at program/project levels- Change and risk management- Control level schedule development and maintenance- Detail engineering cost estimate- Mentoring engineers and designers- Collaboration with SME at satellite offices- Coordinating team building events- Developing department procedures and technical templates- Workshare coordination- Conduct technical training presentations- Coordinating with Stress, Geomatics, Hydraulics, and Geotechnical EngineersTechnical Role:- Pipeline crossing method studies and execution planning- Hot tap design- Auger bore crossing design- Pipeline abandonment evaluation- Site survey scope of work and review- ILI data analysis and execution strategy- HDD design support- Hydrotest plan specification- Piping design for high erosion service - Pig station engineering for on and off module- Pipeline overpressure protection and leak detection analysis- Pipeline material line class specification and material selection- Pipeline LDT and P&ID development- Slug flow analysis support- 3rd Gen modulization- HAZOP identifications and resolutions- CSA Pipeline materials procurement, bid assessment and vendor document reviews

Mar 2015 - Jan 2018

Pipeline Engineering Specialist

10Th Floor 909 - 5 Ave Sw, Calgary Ab, Canada T2P 3G5

Project Involvement:- Horizon Oil pipeline installation in Papua New Guinea; 86 km NPS 8 condensate export pipeline, three NPS 10-12 production pipelines, and a NPS 10 high pressure gas injection pipeline.- SemCAMS Kaybob; 9 km NPS 6 condensate pipeline installation with 4 ESD risers.- Suncor MacKay River SAGD well pad expansion.

Dec 2014 - Mar 2015

Pipeline / Piping Engineering Lead

1100 - 1 Street Se, Calgary Ab T2G 1B1

Project Involvement:- Cenovus, SAGD Pad Facilities CSA steam piping.- Cenovus, 28 km NPS 16 waste water and NPS 12 blowdown water below ground pipelines.- Cenovus, 12 km SAGD flowlines, NPS 36 steam; NPS 24 emulsion; NPS 20 casing gas; and NPS 6 fuel gas.- Cenovus, 2 km SAGD flowlines, NPS 24 steam; NPS 16 emulsion; NPS 16 casing gas; and NPS 6 fuel gas.- Cenovus, two (3) wells Source Water Well Pads connect to NPS 8 and NPS 10 below ground pipelines gathering system.- Cenovus, Disposal Well Pads pigging building expansion.- Cenovus, Sales Oil Coolers Facility optimization and expansion with NPS 20 and NPS 30 sales oil piperack modules.Management Role:- Man-hour and deliverable estimates.- Manpower and resource planning.- Budget control and risk management.- Monitored team performance and earn values.- Developed department procedures.- Scope change management.- Tracked procurement and expediting activities.Technical Role:- Experienced with industry codes: CSA Z662, ASME B31.3, and NACE MR0175.- Familiar with AER, Alberta Pipeline Act and Regulations- Material Requisitions and Technical Bid Evaluations on CSA/ASME, steam and non-steam valves, fittings, pipe, induction bends, and wye-laterals.- Performed studies on pipeline corrosion protection, HDPE liner installation, and other In-situ coating.- Pipeline design and material selection.- Familiar with stress analysis, thermal growth tables, expansion loop design, and shoe/anchor selection.- Involved in P&ID and LDT developments.- Worked on ABSA steam piping system design registration.- Equipment, materials, valves, specialty item, and tie-in lists.- Alignment, plan & profile, right-of-way cross section, general arrangement, isometric drawings.- Compiled Construction Work Packages.- Reviewed client specifications and suggested specification deviations.- Involved in hydraulic analysis and hydro-testing plan.- Participated in model design and development.

Oct 2013 - Dec 2014

Project Engineer-In-Training

Suite 600 639 5Th Ave Sw, Calgary, Ab T2P 0M9

Management Role:- Delegated work to junior engineers.- Tracked procurement status.- Communicated with Facility Engineer, Production Engineer, Field Operators, and Field Inspectors.- Maintained professional work relationship with vendors.- Worked on construction cost tracking and budget analysis.- Organized technical lunch and learn presentations.Technical Role:- Performed NPS 3 to NPS 6 pipeline system hydraulic calculations.- Inlet separators, water injection pumps, flare system sizing and design.- Worked with carbon steel line pipe and Flexpipe, Fiberspar, and Flexsteel direct burial and free-standing liner.- Worked with Designers to generate P&IDs, General Arrangements and Isometric drawings.- Generated project cost estimates, DBM and construction work packages.- Performed technical bid evaluations and purchased line pipe, cold bends, and various processing equipments.- Evaluated pipeline construction tenders and awarded contracts. - Worked with pipeline construction inspectors to ensure engineering compliance including installation routing, hydrostatic testing, liner pull tension limits, and foreign pipe crossing.- Communicated with AER on pipeline licensing applications and Emergency Planning Zone calculations.

Mar 2013 - Sep 2013

Project Engineer-In-Training

500 5 Ave Sw #1400 Calgary, Ab T2P 3L5

Project Involvement: Facility: MEG Energy Stonefell Terminal (Phase 1) Stage: FEED / Detail Engineering Facility: Athabasca Oil Sands Corporation Hangingstone CPF (Phase 1) Stage: FEEDManagement Role:- Participated in the development of Project Execution Plan.- Involved in project quality control /assurance programs and development of best practice program.- Experienced in writing and compiling project DBM.- Created project job instructions to promote smooth project execution.- Participated in Interactive Planning Sessions to develop WBS, project schedule, and scope of work.- Assisted Project Manager in man-hour estimate and resource planning.- Worked with Project Controllers and Engineering Leads to execute management of change.- Participated in generation of Earn Value Reports.- Experienced in project risk management.- Organized weekly project team meetings, client meetings, procurement meetings, and vendor meetings.Technical Role:- Appointed as responsible engineer to design and build multi-disciplines equipment packages.- Developed client specific CSA pipeline and ASME pressure piping line classes, engineering specifications and standards for SAGD project.- Worked on material requisitions and technical bid evaluations on multi-disciplines equipments- Handled technical inquiries from construction team and equipment vendors.- Organized model reviews and involved in model development process.- Worked with Process Engineers on P&ID development and HAZOP meeting.- Worked with Electrical, Instrumentation, and Control Designers on Termination Layouts, I/O Lists & Schematics, and Network Architecture.- Worked with Mechanical Engineers on equipment selection, HVAC, piping design, stress analysis, valve selection and MTO.- Developed and reviewed Construction Work Packages.- Worked with third party inspector on quality surveillance and reviewed weld procedures.

May 2011 - Feb 2013

Relief Operator

Brownfield, Alberta.

- Worked with Senior Operators to perform daily operation at various oil storage and gas processing facilities.- Provided engineering recommendations on facility maintenance schedules, equipment upgrades, and piping replacements.- Assisted home office Project Engineer to created metering schematics for all the processing facilities to satisfy EPAP requirements.- Worked with Production Foreman to monitor production and construction activities.- Completed annual facility lease inspections to identify engineering deficiencies and safety concerns.- Produced site-specific reports for safe operation around equipments.

May 2010 - Aug 2010

Drafting Department Manager & Senior Pipeline/Piping Designer

Calgary, Alberta.

- Specialized in designing sweet/sour gas and oil emulsion wellsites, singles/multi-well batteries, compressor stations, and processing plants design.- Worked on pipeline installation projects ranging from NPS 3 to NPS 12 in Alberta, B.C. and Saskatchewan.- Leaded on various pipeline gathering system projects for ARC Resources, Alberta Clippers, Compton, EnCana, Flagship, Gentry, Highpine, Northrock, Mission, Mustang, and Zapata.- Familiar with processing equipments such as 2/3-Phase separator, heat exchangers, oil strainer, satellite unit, flare stack, incinerator, knock-out drum, storage tank, QA skid, LACT unit, water filter, gas compressor, water injection pump, line heater, dehydrator, and J-T packages.- Hired, supervised and trained all levels of Designers, Checkers, and CADD operators.- Managed a department of seven people with average of 15 concurrent projects monthly.- Generated manpower plans and assigned resources.- Assisted Project Mangers to develop engineering procedures and design standards.- Prepared P&IDs, Line Lists, Plot Plans, Location Plans, and Isometrics.- Developed drawing control and design data management system.

May 2004 - Aug 2007

Intermediate Pipeline/Piping Designer

409 10 Ave Se Calgary, Ab T2G 0W3

- Worked on the NPS 30, 540 km Enbridge Athabasca Pipeline project. - Designed ESD stations, river crossings valve stations, and pipeline pigging termination stations.- Designed NPS 20 Plains Rainbow Pipeline booster pump stations.- Designed Suncor gas transmission pipeline templating compressor stations.- Designed Plains Nipisi Trucking Terminal.- Involved in Koch Bow River pipeline gathering system expansion and storage tank additions project.- Worked on Suncor Firebag Stage 1 oil sand project on pipeline bridge design.- Prepared P&IDs, Line Lists, General Arrangements, Isometrics, Crossing Details, Plans and Profiles, Alignment Sheets, Crossing Typicals, Structural and Foundation Details, Pile Location and Grading Plans, and Architectural Layout.- Assisted Project Managers, Project Engineers, and Senior Designers in underground and above ground pipeline designs, project presentations, drawing productions, and files management.- Experienced in fieldwork, drawing-related inspections and as-built work in Alberta and Saskatchewan.

May 1997 - Aug 2001
Team & coworkers

Colleagues at Ovintiv

Other employees you can reach at ovintiv.com. View company contacts for 3017 employees →

5 education records

Antonio Lau education

Bachelor Of General Studies, Urban Studies/Affairs

Activities and Societies: Hong Kong Students' AssociationUrban Studies, Urban Planning, Urban Design

High School Diploma

St. Mary'S High School

Junior High

Father James Whelihan
FAQ

Frequently asked questions about Antonio Lau

Quick answers generated from the profile data available on this page.

What company does Antonio Lau work for?

Antonio Lau works for Ovintiv.

What is Antonio Lau's role at Ovintiv?

Antonio Lau is listed as Professional Engineer at Ovintiv.

What is Antonio Lau's email address?

AeroLeads has found 1 work email signal at @fluor.com for Antonio Lau at Ovintiv.

Where is Antonio Lau based?

Antonio Lau is based in Greater Calgary Metropolitan Area, Canada while working with Ovintiv.

What companies has Antonio Lau worked for?

Antonio Lau has worked for Ovintiv, Fluor Corporation, Stantec, Equinox Engineering Ltd., and Wood Group Mustang (Canadian Region).

Who are Antonio Lau's colleagues at Ovintiv?

Antonio Lau's colleagues at Ovintiv include Heather Barton, Adam Rolick, Alfredo Sanchez, P.E., Pmp, Tommy Elliott, and Ian Paul Aparece.

How can I contact Antonio Lau?

You can use AeroLeads to view verified contact signals for Antonio Lau at Ovintiv, including work email, phone, and LinkedIn data when available.

What schools did Antonio Lau attend?

Antonio Lau holds Bachelor Of Science (B.Sc.), Mechanical Engineering from The University Of Calgary.

What skills is Antonio Lau known for?

Antonio Lau is listed with skills including Project Engineering, Piping, Petroleum, Pipelines, Gas, Feed, Engineering, and P&Id.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Antonio Lau you were looking for.

View similar profiles