Azmat Khan

Azmat Khan Email and Phone Number

Director Plant Quality @ Brose Group
Rochester, MI, US
Azmat Khan's Location
Rochester, Michigan, United States, United States
About Azmat Khan

A detail-oriented Engineering Manager with extensive experience in the automotive industry. Apply expertise in product knowledge and management, and best practices in manufacturing and quality assurance to reduce risks and improve business outcomes. Effectively collaborates with and engages with others to exceed goals.

Azmat Khan's Current Company Details
Brose Group

Brose Group

View
Director Plant Quality
Rochester, MI, US
Website:
brose.com
Employees:
9547
Azmat Khan Work Experience Details
  • Brose Group
    Director Plant Quality
    Brose Group
    Rochester, Mi, Us
  • Brose Group
    Director Of Quality
    Brose Group Jul 2024 - Present
    Michigan, United States
  • Belcan
    Quality Manager
    Belcan Mar 2024 - Jul 2024
    Michigan, United States
  • Avancez Llc
    Quality Manager
    Avancez Llc Feb 2024 - Jul 2024
    Michigan, United States
  • General Motors
    Quality Manager & Vehicle Excellence Lead
    General Motors Oct 2014 - Feb 2024
    General Motors Lansing, Orion, Pre-Production A Global Technical Center (Mi Usa)
    • Single voice leader for total Program quality from program framework initiation to launch.• Develops & maintains QMS budgeting of $250M for new program tooling & measurement systems.• Early interface with design studio & product design to develop DTS and styling interfaces desensitization.• Develops & lead exterior, interior design interfaces, clay development & tabletop models for leadership reviews and buyoffs.• Works as a manufacturing & quality architects b/w design… Show more • Single voice leader for total Program quality from program framework initiation to launch.• Develops & maintains QMS budgeting of $250M for new program tooling & measurement systems.• Early interface with design studio & product design to develop DTS and styling interfaces desensitization.• Develops & lead exterior, interior design interfaces, clay development & tabletop models for leadership reviews and buyoffs.• Works as a manufacturing & quality architects b/w design studio, product design and manufacturing execution teams to achieve quality and manufacturing deliverables 20% above the targets of SPQRC.• Develops & manages quality and dimensional build targets at pre-production and launch in plant.• Develops upfront BOP and BOE tooling & fixturing strategies through critical interface meetings enabling 20% cost reduction with launch excellence quality targets above 70% at start of production.• Implements upfront DFSS glide path charting with sufficiency plans to achieve 70% reduction in GCA, IPTV & Warranty.• Manages CAE simulation to drive the development of product design math for as manufactured Vs as assembled.• Forging early strong partnerships with suppliers to understand their processes to mitigate the risk of parts variances. Leads supplier quality activities for PPAP, PDR & compliance to IATF 16949.• Leads supply chain management initiation of SPPS, containment action plans with cost recovery.• Develops suppliers training workshops for parts matching submissions and matching quality targets.• Prepares parts submission requirements before SOR releases & tooling kick-off at supplier sites. • Manages tech reviews with buyers & design release for sourcing. • Develops Gantt charts and leads slow build matching to meet tooling and gauging R&R.• Set up PVR reviews for Class-A surface defects resolution & buy-off using GSQE/GFQE applications.• Leadership management of salaried & hourly workforce for team building, mentoring, and training. Show less
  • General Motors
    Senior Manufacturing Engineer- Product Interface Lead
    General Motors Sep 2012 - Oct 2014
    General Motors, North American Assembly Plants (Us, Mx & Canada)
    • Developed and maintained Plan-for-every-part for New and MCE program launches.• Managed supply chain by creating tombstone charts and worksheets for budgeting and procurement of integration material.• Introduced batch changes criteria for least impact on launch timing, reworking and scrap resulting in 40% cost reduction.• Developed training workshops and forums to engage suppliers before and during launch milestones builds for Iterative matching.• Implemented innovative… Show more • Developed and maintained Plan-for-every-part for New and MCE program launches.• Managed supply chain by creating tombstone charts and worksheets for budgeting and procurement of integration material.• Introduced batch changes criteria for least impact on launch timing, reworking and scrap resulting in 40% cost reduction.• Developed training workshops and forums to engage suppliers before and during launch milestones builds for Iterative matching.• Implemented innovative concept of early first shot parts mini matching at supplier’s sites for dimensional iterations loops.• Developed histograms and pareto charts to prioritize parts matching issues and identified top variance contributors. • Introduced early design virtual simulation to detect part design interferences resulted in cost saving of above $20M. Show less
  • General Motors
    Senior Supplier Quality Engineer & Supplier Development
    General Motors Aug 2010 - Sep 2012
    General Motors, Global Technical Center, Detroit Hamtramck & Orion Assembly Plants (Mi Usa)
    • Introduced and implemented single sourcing and bundling strategy concept.• Review and develop SOR appendices for POA & MP parts APQP, PPAP, measurement equipment and frequency requirements.• Lead and coordinate APQP, PDR DFEMA, PFMEA, Gage Design, Gage R&R and PPAP activities for buy-off.• Participates in program launches cross functional meetings to develop single issues list for driving ownerships and resolutions.• Lead problem-solving activities to support manufacturing… Show more • Introduced and implemented single sourcing and bundling strategy concept.• Review and develop SOR appendices for POA & MP parts APQP, PPAP, measurement equipment and frequency requirements.• Lead and coordinate APQP, PDR DFEMA, PFMEA, Gage Design, Gage R&R and PPAP activities for buy-off.• Participates in program launches cross functional meetings to develop single issues list for driving ownerships and resolutions.• Lead problem-solving activities to support manufacturing locations on supplier related performance issues.• Monitor and perform suppliers’ capability assessments of Run-at-Rates, Process Control Plans, PPM’s, and Warranty Audits.• Establish close relationships with assigned suppliers and actively drive Poke Yoke and Kaizen activities.• Educate suppliers on GM supply power SQMS systems for providing action plans.• Managed Cost Recovery with suppliers based on the SPPS.• Coordinate suppliers change requests through production trial runs for approval. Show less
  • General Motors
    Assistant Manufacturing Integration Manager
    General Motors Aug 2008 - Aug 2010
    General Motors, Global Technical Center And North American Assembly Plants (Us, Mx & Canada)
    • Develop and maintain capital investment budgeting worksheets for new launches with global inter-buildability strategies.• Develop the concept of creating VISBOM for communicating and resolving program ‘disconnects’ in targeted Mfg. investments.• Program cost reduction of 30% to define assembly datums in early design reviews for asset reuse.• Member of Program leadership team for approving engineering design changes and modification.
  • General Motors
    Senior Quality Engineer & Red X Master Problem Solver
    General Motors Sep 2005 - Aug 2008
    General Motors, Global Technical Center And North American Assembly (Us, Mx & Canada)
    • Lead & solved several complex front-end no-build issues with negligible cost and part changes impact.• Visited supplier sites in US & MX to resolve frames deflection and pre-pierce body mounts misalignment saving overall $110M. • Implement the concept of Buck build in Bodyshop to set closure panels with level II DTS to achieve final fit in General assembly. • Improved Full Size SUV & Truck marriage to frame to meet the competitive quality VTSD resulting cost savings of $40M +… Show more • Lead & solved several complex front-end no-build issues with negligible cost and part changes impact.• Visited supplier sites in US & MX to resolve frames deflection and pre-pierce body mounts misalignment saving overall $110M. • Implement the concept of Buck build in Bodyshop to set closure panels with level II DTS to achieve final fit in General assembly. • Improved Full Size SUV & Truck marriage to frame to meet the competitive quality VTSD resulting cost savings of $40M + $5PC.• Re-designed Fender inner flange holes to increase the adjustments to absorb the frame/powertrain deflections and misalignment.• Designed a Headlamp to Grille Gap control feature by adding a piercing slot enabling trend build.• Re-design End-Gate striker install fixture to reduce refitting to achieve flush interface with box-side outer. • Vision systems template communization’s and additions of critical zoning to correlate the BIW data to the GA builds. • Developed (JES) Sheets to standardize and train both salaried and hourly closure hang and fit teams.• Managed and lead the activities to tune-In dimensionally duplicate Die sets in US and MX.• Resolved Production through-put issues at Oshawa Plant and updated Vision systems to show Man-machine interface time, buffers, MTBF, MTTR, and equipment cycle times resulted efficiency increase from 65% to 90%. Show less
  • General Motors
    Assistant Production Manager
    General Motors Aug 2003 - Sep 2005
    General Motors, Pontiac Truck Assembly Plant (Mi Usa)
    • Ran the production floors in Bodyshop and General Assembly with an achievement of DRR @ 90%.and FTQ @ 85%, • Managed and resolved day-to-day Production Supervisors and Union work force issues. • Provided daily briefing to the Plant leadership staff on Verification stations, throughput DRR, DRL and BPD. • Developed & implemented plans to engage panel fitters measuring their work improved the CARE line quality 95% for shipping.• Lead cross-functional meetings to follow-up day to… Show more • Ran the production floors in Bodyshop and General Assembly with an achievement of DRR @ 90%.and FTQ @ 85%, • Managed and resolved day-to-day Production Supervisors and Union work force issues. • Provided daily briefing to the Plant leadership staff on Verification stations, throughput DRR, DRL and BPD. • Developed & implemented plans to engage panel fitters measuring their work improved the CARE line quality 95% for shipping.• Lead cross-functional meetings to follow-up day to day and repetitive DRR & DRL, GCA issues for permanent resolution.• Created and lead a task force to manage weld flash issues resulted in the savings of $5M across 3 shifts.• Developed templates and vision monitoring for adhesives and sealers reducing the rework with a saving of $1M. Show less
  • General Motors
    Senior Quality And Reliability Engineer
    General Motors Oct 2001 - Aug 2003
    General Motors, Flint Truck Assembly Plant (Mi Usa)
    • Managed and lead Issue resolution teams for day-to-day & hardy perennial issues impacting DRR, DRL, Warranty, IPTV & GCA.• Co-Chaired Go-Fast workshops to strategize the production and distribution of SPO parts resulted in the saving of 20M. • Developed vehicle Closure panel fit process layouts, JES, operators training resulted in FTQ of 90%. & $10M savings.• Resolved data disconnects b/w Tier-1 & OEM by developing datum coordination, removed non-value-added work costing $1.5M… Show more • Managed and lead Issue resolution teams for day-to-day & hardy perennial issues impacting DRR, DRL, Warranty, IPTV & GCA.• Co-Chaired Go-Fast workshops to strategize the production and distribution of SPO parts resulted in the saving of 20M. • Developed vehicle Closure panel fit process layouts, JES, operators training resulted in FTQ of 90%. & $10M savings.• Resolved data disconnects b/w Tier-1 & OEM by developing datum coordination, removed non-value-added work costing $1.5M. • Presented lessons learned to Sr. Leadership for documentation as BP and for robust parts designing & manufacturing processes. Show less
  • General Motors
    Product Design Release Engineer
    General Motors Mar 1999 - Oct 2001
    General Motors, Global Tech Center (Mi Usa)
    • Product design release Door-in-white and its internal components per vehicle design criteria, styling, and packaging requirement.• Worked & resolved with stamping Die lead for meeting formability vs styling, feature & hem radii and class-A surface defects, • Worked with CAE & Crash teams to meet the GM and FMVSS Frontal offset barrier crash, Dynamic Side Impact and Static 214. • Involved in Structural testing, validation of sealing and wind tunnel testing for meeting aero VTS… Show more • Product design release Door-in-white and its internal components per vehicle design criteria, styling, and packaging requirement.• Worked & resolved with stamping Die lead for meeting formability vs styling, feature & hem radii and class-A surface defects, • Worked with CAE & Crash teams to meet the GM and FMVSS Frontal offset barrier crash, Dynamic Side Impact and Static 214. • Involved in Structural testing, validation of sealing and wind tunnel testing for meeting aero VTS requirements.• Prepare BOM list with plan-for- every part for build contents.• Approve production trial runs submitted by supplier quality engineers.• Root Cause and finalize the resolution of TIR’s issued by MPG for achieving Corporate Warranty Goals.• Prepare submissions of EWO’s, PPAP, PTR’s and PADS to authorize plants and/or suppliers for part changes and modifications.• Prepared budgeting of die line-up, vendor tooling, containerization, logistics for submission to program chief for approval.• SOR preparation and releases to program buyer.• Hold part sourcing tech reviews with the buyer for supplier selection. Show less
  • General Motors
    Manufacturing Engineer – Process & Launch Lead
    General Motors Dec 1996 - Mar 1999
    General Motors, Flint Mid/Lux Tech Center, Orion And Detroit Hamtramck Assembly Plants (Mi Usa)
    • Lead industrial engineering activities of developing floor layout for tooling, BEC and material presentation. • Lead the development & finalization of tool design, fabricating, installation, and safety buyoffs with integrated suppliers.• Developed Gantt charts to manage and lead tooling and fixturing Gage R&R studies for dimensional integrity buy-off.• Design door hinges to body fastening system to avoid toe and heel down conditions which results in increased variability.•… Show more • Lead industrial engineering activities of developing floor layout for tooling, BEC and material presentation. • Lead the development & finalization of tool design, fabricating, installation, and safety buyoffs with integrated suppliers.• Developed Gantt charts to manage and lead tooling and fixturing Gage R&R studies for dimensional integrity buy-off.• Design door hinges to body fastening system to avoid toe and heel down conditions which results in increased variability.• Develop pareto & histogram charts to prioritize & root cause of GCA, IPTV, Warranty & JD Power issues. • Managed and lead Bodyshop meetings of a joint cross functional team for resolution of dimensional problems.• Involved in the dynamic & static repeatability studies for calibration and correlation verification of CMM to Vision Systems.• Worked with EDS & NAO manufacturing to develop BIW analyzer software to track six sigma and process mean shifts.• Designed and implemented purple card process to document and track containment moves to avoid certification issues.• Resolved Bodyshop closure hang downtime & throughput issues through PLC Logic reduces MTTR 1.5hr to 10min.• Developed maintenance plans for door hinges hydraulic piercers bolt shearing issue downtime. Show less

Azmat Khan Education Details

Frequently Asked Questions about Azmat Khan

What company does Azmat Khan work for?

Azmat Khan works for Brose Group

What is Azmat Khan's role at the current company?

Azmat Khan's current role is Director Plant Quality.

What schools did Azmat Khan attend?

Azmat Khan attended Wayne State University, Ned University Of Engineering And Technology.

Who are Azmat Khan's colleagues?

Azmat Khan's colleagues are Eliane Gasnot, Dave Juke, Croswill Ortiz, Thomas Stenglein, Fredi Schülke, Angelo Stokes, Scarlett Schmittou.

Not the Azmat Khan you were looking for?

  • Azmat Khan

    Logistics & Supply Chain
    Washington Dc-Baltimore Area
  • Azmat Khan

    Winchester, Ma
  • Azmat Khan

    Investigative Reporter
    New York, Ny
    7
    gmail.com, columbia.edu, buzzfeed.com, columbia.edu, gmail.com, gmail.com, newamerica.org

    1 (202) 5XXXXXXX

  • Azmat Khan

    ( Road, Rail, Ocean, & Air ) [ Available 24/7/365 @ 301-821-3370 | Azmat@Fastcatfreight.Com ]A Division Of Armstrong Transport Group | Mc 512088 | Usdot 2233590
    Washington Dc-Baltimore Area

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.