Section Engineer – Drainage, Hard Solutions & Earthworks
Balfour Beatty Major Civil Engineering
M25 Section 4 Road Widening J27 To J30
• I Successfully completed Installation of several km’s of various drainage pipe, 350m of 2.1m Diameter attenuation pipes, Hydrodynamic separators, petrol interceptors, 1.5km sheet piling at several locations and of various applications, several Km’s of HA boundary fencing and 2Km of Central reserve Earthworks.• I was Responsible for all engineering aspects of the works within my authority including; Health, safety, Environment and welfare, Coordination with other disciplines, planning works, Design clashes, piling platform construction & associated temporary works briefs, Logistics, Traffic Management, Permit control, QA, setting out, • Managed and supervised different teams of Engineers to support the project requirements. Ensuring Flow of Information between Engineers and managers and timely completion of setting out. • Managed up to 8 sub-contract gangs at different locations within the works. Coordinating available areas with other disciplines. Ensuring Engineers have completed setting out. Reporting progress to my Manager.