Chris Watson Email & Phone Number
@riotinto.com
1 phone found area 186
LinkedIn matched
Who is Chris Watson? Overview
A concise factual answer block for searchers comparing this professional profile.
Chris Watson is listed as Superintendent Mining Tech and Growth at Rio Tinto, a with 39972 employees, based in Greater Perth Area, Australia. AeroLeads shows a work email signal at riotinto.com, phone signal with area code 186, and a matched LinkedIn profile for Chris Watson.
Chris Watson previously worked as Superintendent Mining Tech & Growth at Rio Tinto and Project Lead at Rio Tinto. Chris Watson holds Higher National Diploma, Information Technology from Teesside University.
Email format at Rio Tinto
This section adds company-level context without repeating Chris Watson's masked contact details.
AeroLeads found 1 current-domain work email signal for Chris Watson. Compare company email patterns before reaching out.
About Chris Watson
PMI and PRINCE2 certified Project Manager with over thirty years experience in Project Management, People Management and IT / Customer Support.Specialties: Project management, people management, IT infrastructure
Listed skills include Project Management, Pmp, Resource Management, Management, and 14 others.
Chris Watson's current company
Company context helps verify the profile and gives searchers a useful next step.
Chris Watson work experience
A career timeline built from the work history available for this profile.
Superintendent Mining Tech & Growth
Current
Project Lead
• Product evaluation and installation of a Ground Engaging Tool (GET) Loss Detection System which shall be implemented on a variety of Heavy Mobile Equipment (HME) including wheel loader and excavators at Gudai-Darri. The primary use case for such a system is to provide an alert to the operator of the machine when it is believed a GET has become displaced from its position on the machine bucket. • Deliver a standard version of RoboFuel that can be deployed across Rio Tinto’s AHS sites. It includes, the design, manufacture, programming, installation and commissioning of an Auto Washdown Upgrade. System enhancements to facilitate the capture and analysis of fueling data for reporting improvements. • Implement improvements to the existing RoboFuel system deployed at Yandicoogina. The delivery of this project included the installation, commissioning and usage acceptance test of the provision for robot self-calibration and a Cap Bank upgrade. • Opportunity evaluation of implementing a remote controlled mini excavator for de-pegging small rocks on the grizzly within the Tom Price primary crusher.
Project Manager
• Definition phase for the deployment of the infrastructure to support the rollout of all autonomous functions at Rio Tinto’s greenfield mine site Gudai-Darri.• Deployment of the autonomous network and associated infrastructure for Marandoo’s AHS roll-out. Support for the first software upgrade of the CAT system. Managed the replacement of MineCare equipment in CAT HME fleet and the transition of the site based control centre to the Operations Centre.• In support of the overall ADS deployment program, provide connectivity to the LTE network and deploy Cisco 829 radios for multiple RT sites. Enabling of firewalls for the build of new ADS servers.• Provision of network and server availability for the roll-out of Smart Charge Trucks at various RT sites.• Deployed the technical infrastructure necessary to expand the use of AHS to West Angelas Deposit B.• Rollout of Tele Remote Dozing solutions at two locations.
Project Manager
· Roll-out of an in-vehicle system (IVMS) to 25 trucks, designed especially to support Chevron’s Barrow Island facility, supporting the customer waste tracking, reporting and invoicing requirements; · Programme Manager for the implementation of a standardised NAV 2013 (ERP) system throughout Western Australia, with installation of IVMS infrastructure into associated trucks;· Definition phase planning and vendor engagement for a customer focused transformation programme, delivering company-wide operating model, organisation structure, system and process changes, underpinned by Dynamics 365 and ERP integration; and· Defined, planned and managed the set-up of SharePoint Project Online, including changes to project management methodologies within the organisation. Managed the implementation of a new Cherwell Service Desk across the whole organisation.· Managed the replacement of the company’s entire SAN.
Project Manager - Iron Ore
· Implementation of a Laboratory Information Management System (LIMS) to replace functionality currently contained within the CCLAS solution, on a like-for-like basis;· Development of a project to deploy a satellite / GPS tagging system for all employees working on a new mine site. This included incorporating feedback HR, legal and Health and Safety;· Deployment of a Tool Tracking system, based around RFID technology at a newly established mine site; · Installation of a standardised electronic tank gauging system in diesel fuel tanks across BHP sites and upgrade of existing monitoring equipment for compatibility with AdaptFMS for one platform monitoring;· Definition phase planning and RFP engagement for a Slope Monitoring system that integrates all differing slope monitoring technologies data into one platform; and· Proof of concept trial of an RFID technology that is incorporated into the teeth on digger buckets, to enable them to be found when they break off.
Project Manager - Nickel West
· Brought in at commencement of project execution and quickly established that the approved project approach had flaws that deemed timescales and budget not viable. To sustain project momentum maintained focus on delivering areas of the project that required minimum to no change; whilst concurrently progressing with key stakeholders on developing a revised approach that was endorsed by the project steering committee, with increased scope and budget. · Conducted training and testing for changed features of Documentum; and · Transitioned support functions from existing service providers to IBM.
Project Manager At Bhp Billiton Niw
Project Description: Project Manager responsible for the transition of all BHP Billiton Stainless Steel Materials (SSM) and Nickel West (NiW) users, applications and services from the legacy environment to the IBM supported infrastructure. The areas being transitioned focused on Domain, Messaging, Security, eRooms, and Documentum.Contribution: Implemented a significant number of changes to over 2000 users in readiness for migration of Enterprise Services to IBM. This included the reduction of all mailboxes to under 100MB and the upgrade and standardising of the SSM/NiW desktop environment to be compatible with the new services (Windows XP SP3, Office Communicator, Outlook, Java upgrades) and all associated Organisational Change Management communications. Facilitated the remediation / reconfiguration of all applications that utilise SMTP for mail relay and conducted an audit of all Blackberry devices and upgrades of any incompatible versions. Prepared legacy environment for decommissioning and migrated third-party remote access users to a new remote access application. Conducted training and testing for changed features of Documentum. Ensured successful transition of Service Management and support functions for all services from existing service providers to IBM.
Infrastructure Project Manager
Project Description: Project Manager for the Western Power separation of Verve Energy into a desegregated entity.Contribution: Responsible for the infrastructure and application split of Verve Energy’s IT environment; including the procurement and physical build of a completely new production environment for Verve, consisting of Intel, UNIX, network and security equipment. Supported the selection process for a third-party vendor to outsource and assist with the infrastructure build. Managing the migration and testing of applications from the existing Western Power production environment to the new Verve infrastructure.
Project Manager
PROJECT MANAGER at Arcadia account. Project Description: Project Manager responsible for the implementation of multiple projects in a major High Street fashion retailer.Contribution: Currently responsible for three major projects in the Arcadia group. Replacement of outdated Netfinity Servers and EPOS equipment across 115 stores, coordinating 3rd party resources and in house support teams, ensuring the customer is still able to trade during the upgrade. The testing and support of the infrastructure in Arcadia's first US store in New York City and the associated changes to the retail application in order for it to operate in a US environment. A replacement of the servers and 100 cash registers in Arcadia's flagship store in Oxford Circus, London with a resilient solution that ensures continuity of service in the event of a failure.
Project Manager
PM at Bradford and Bingley PlcProject Description: Project Manager at IBM@Bradford & Bingley, Contribution: Implemented the rollout of new equipment to 140 BBG Agents UK wide. Outdated PCs, printers and screens were replaced and a new OS and applications deployed to the user's desktop. Accomplished a major upgrade to the associated SAN, utilising and coordinating resources in the UK and India without loss of service or data to the customer. Responsible for a $1.8M infrastructure project which included the deployment of new Intel servers for a major programme. 90 servers were built, content loaded and service activated across Production, Pre-Production and Development environments. Sub-projects consisted of changes to Alteon Load Balancers, TSM server configurations, preparation of DR plans, creation of Citrix Production and Pre-Production environments, Production and Pre-Prod SQL Clustered environments, Middle-Tier and Active Directory clustered environments, and the rebuilds of 32 bit to 64 bit servers. 2 major sub-projects consisted of the cutover of 2 clustered File Servers to a 4 node cluster and an equivalent Print Server, 2 to 4 node upgrade. Managed the successful implementation of a new IBM hosted Oracle HR / Payroll application (HRMS), migrated from a mainframe based application (Cyborg), with no break in service.Was responsible for the IT element of the move and consolidation of a number of teams into the main Call Centre. 226 PCs were decommissioned and moved. In addition, new PCs were deployed; existing PCs were replaced with new builds and numerous screens were procured. This was completed with no disruption to normal service for the customer facing call centre staff.Held additional responsibilities to PM role; was a member of the Release Management Board, ensuring all changes adhered to the Change Management process; was a Project Quality Assurance (PQA) reviewer, ensuring that in-flight projects adhered to Project Quality standards.
Resource Deployment Manager
Project Description: RDM for PMs - Midlands & SouthContribution: As an RDM, a Project Management role, was responsible for managing project engagement staffing for approximately 60 PMs in the South of England. This gave the opportunity to work at senior levels within AS, assisting the Executive Leadership Team secure resource for senior roles and contributing to a bi-weekly 'Top PM Call' with the AS management team. Was also the RDM for a Skills Transfer Project and identified, interviewed, recommended and recruited individuals to AS from other areas of IBM.
Sso New Business Manager
Project Description: New Business Manager responsible for a team of Project Managers and Delivery Integration Specialists, supporting SSO strategic outsourcing projects. Contribution: This role involved financial and budgetary responsibility, program and project status tracking and associated reporting to higher management. People management responsibilities included resource and task management; and people development and reward. Had responsibility for escalation, situation management and customer satisfaction / relationship tracking. Approved new solutions and focused strongly on process improvement in all areas of the business.
Project Manager - Sso New Business
Project Description: As a Project Manager in the New Business Implementation Team was responsible for the implementation of committed strategic outsourcing solutions to agreed baselines, leading and driving the delivery team to completion of successful projects. Was promoted to Team Leader and performed this role for two years, in addition to managing projects.Contribution: Amongst the projects managed and the customers worked with were, Bradford and Bingley Group (BBG) Transition; a Firewall Replacement Project on an RS/6000 platform at BBG; Equifax Transition Project incorporating DEC-VAX environments; an Optical Replacement Project at Equifax; Certegy Transition Project; two ASDA Home Shopping Projects and an Internet Banking project on an Intel infrastructure for a joint venture between Merrill Lynch and HSBC. As a member of the engagement team working on a new bid for JPMC in New York City, produced high level project plans for the AS/400 (iSeries) and RS/6000 (pSeries) transitions, for inclusion in the global solution.As a Project Manager, gained the IBM recognised title of Advisory Project Manager and knowledge of project management methodologies and practices has been confirmed via the Project Management Institute (PMI). Successfully certified as a PMP in December 2002.
Systems Services Representative
Project Description: Qualified as a Systems Services Representative by passing SSR school; a similar course to IBM Sales School. SSR is an extension of the Customer Engineer (CE) role; with further responsibilities in account management, escalation of customer situations and recognising where IBM Services would improve the customer's IT operations. Contribution: Enthusiastically took on the role of SSR in many high profile Mid-Range accounts; the largest being HSBC Bank who had been disappointed with recent major AS/400 upgrades at their data centres at both Barnsley and Bootle. After making many improvements to the IBM procedures within the account, HSBC were then delighted with the support they received for their AS/400 systems. Acted as Mid-Range Team Leader and actively promoted the development of the team.
Mid-Range Territory Coordinator
Project Description: Role encompassed planning standby patterns and account responsibilities and monitoring a territory budget and maintenance coverage. Contribution: During IBM's transformation to a 'team based' company, promoted the development of the territory as a team and during this time still had a Mid-Range patch covering Bradford, Keighley and Skipton. Skills as a CE were recognised via an assessment process and achieved the IBM recognised qualification of being a Professionally Accredited Customer Engineer (PACE) and a National Vocational Qualification (NVQ) Level 3 in Servicing IT Equipment & Systems.
Mid-Range Customer Engineer (Ce)
Project Description: Had Account responsibility for the busy City Centre patch of Leeds. The role entailed the resolution of hardware and microcode issues for IBM mid-range systems – AS/400 and RS/6000 systems; the resolution of issues for IBM mid-range systems associated I/O - external DASD, DASD controllers, backup devices; the planning and undertaking of major system upgrades; the planning and undertaking of operating system upgrades – OS/400 and AIX; the resolution of printer hardware issues; the diagnosis and resolution of network problems, including cabling, network controllers, modems.Contribution: Maintained AS/400 and RS/6000 systems and achieved high levels of customer satisfaction as measured by customer surveys. Managed difficult situations, communicating at all levels across companies – from end-users to managing directors. This was also across a broad range of customers – from small offices to large international companies. Received a Service Award for commitment to customer satisfaction.
Program Support Representative
Project Description: Worked within the Birmingham Software Support Centre.Contribution: Took first line, problem determination calls on the full range of Mainframe software; such as MVS, VM & CICS. The problem resolution of errors included identifying appropriate software Program Temporary Fixes (PTFs) for known issues, recommending upgrade paths and for new problems, requesting a fix via an Authorised Program Analysis Report (APAR).
Colleagues at Rio Tinto
Other employees you can reach at riotinto.com. View company contacts for 39972 employees →
Eleanor Lu
Colleague at Rio TintoShanghai, China
View →
JW
Joel Woolley
Colleague at Rio TintoBrisbane, Queensland, Australia
View →
TW
Thanuri Weerasinghe
Colleague at Rio TintoMaylands, Western Australia, Australia
View →
DB
Darko Bajkin
Colleague at Rio TintoKitimat, British Columbia, Canada
View →
SA
Steve Antle
Colleague at Rio TintoLabrador City, Newfoundland And Labrador, Canada
View →
SM
Saarthak Malhotra
Colleague at Rio TintoGurugram, Haryana, India
View →
TD
Troy Duncan
Colleague at Rio TintoKitimat, British Columbia, Canada
View →
KB
Khushboo Batra
Colleague at Rio TintoNew Delhi, Delhi, India
View →
AE
Adam Edwards
Colleague at Rio TintoGreater Perth Area, Australia
View →
KJ
Kyle Jamieson
Colleague at Rio TintoPerth, Western Australia, Australia
View →
Chris Watson education
Frequently asked questions about Chris Watson
Quick answers generated from the profile data available on this page.
What company does Chris Watson work for?
Chris Watson works for Rio Tinto.
What is Chris Watson's role at Rio Tinto?
Chris Watson is listed as Superintendent Mining Tech and Growth at Rio Tinto.
What is Chris Watson's email address?
AeroLeads has found 1 work email signal at @riotinto.com for Chris Watson at Rio Tinto.
What is Chris Watson's phone number?
AeroLeads has found 1 phone signal(s) with area code 186 for Chris Watson at Rio Tinto.
Where is Chris Watson based?
Chris Watson is based in Greater Perth Area, Australia while working with Rio Tinto.
What companies has Chris Watson worked for?
Chris Watson has worked for Rio Tinto, Toxfree Solutions, Bhp Billiton, Ibm, and Western Power.
Who are Chris Watson's colleagues at Rio Tinto?
Chris Watson's colleagues at Rio Tinto include Eleanor Lu, Joel Woolley, Thanuri Weerasinghe, Darko Bajkin, and Steve Antle.
How can I contact Chris Watson?
You can use AeroLeads to view verified contact signals for Chris Watson at Rio Tinto, including work email, phone, and LinkedIn data when available.
What schools did Chris Watson attend?
Chris Watson holds Higher National Diploma, Information Technology from Teesside University.
What skills is Chris Watson known for?
Chris Watson is listed with skills including Project Management, Pmp, Resource Management, Management, Infrastructure, Integration, Data Center, and Itil.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trialCheck these profiles if this is not the Chris Watson you were looking for.
View similar profiles