AeroLeads people directory · profile

Daniel Cutler Email & Phone Number

Senior Project Engineer at DRA Global
Location: Scarborough, Western Australia, Australia 10 work roles 3 schools
LinkedIn matched
✓ Verified August 2026 3 data sources Profile completeness 100%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Senior Project Engineer
Location
Scarborough, Western Australia, Australia
Company size

Who is Daniel Cutler? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Daniel Cutler is listed as Senior Project Engineer at DRA Global, a with 1099 employees, based in Scarborough, Western Australia, Australia. AeroLeads shows a matched LinkedIn profile for Daniel Cutler.

Daniel Cutler previously worked as Project Engineer at Calibre and Project Engineer at Engenium. Daniel Cutler holds Bachelor Of Engineering (B.Eng.) (Mechanical), Mechanical Engineering, First Class Honours from Cquniversity.

Company email context

Email format at DRA Global

This section adds company-level context without repeating Daniel Cutler's masked contact details.

DRA Global

Review company-level records connected to Daniel Cutler before choosing the right outreach path.

Profile bio

About Daniel Cutler

My current career goal is to gain experience as a Mechanical Engineer and work towards becoming an efficient Project Manager. To achieve this, I will be looking at extending my experiences I have attained so far. I am looking at positions which allow me to work in the three main sections of a project, planning, execution and closing out a particular project. At present, I have completed 6 years of post-graduate work in the construction industry. During this time and my work experiences through university, I worked on several Gas Projects, Alumina Plant Upgrade, and the construction of an Iron Ore and Coal Handling Plants. I am looking at expanding the skills I have learnt; these skills include but not limited to; Structural, Mechanical, Piping, Commissioning, Report Writing and interacting with Management and Clients. Although all my experience has been large scale projects I wish to extend these skills and gain experience with the constraints and complexities smaller projects and brownfield sites will provide. Additionally, I would like to gain experience working in the early phase of a project, being involved in the design process, contract involvement and following through with experiencing an operating facility. My strong points, which I am keen to promote, are my familiarity of the safety of the construction industry, willingness to learn, dedication to tasks and enthusiasm for new knowledge.

Listed skills include Construction, Piping, Project Engineering, Engineering, and 42 others.

Current workplace

Daniel Cutler's current company

Company context helps verify the profile and gives searchers a useful next step.

DRA Global
Dra Global
Senior Project Engineer
perth, western australia, australia
Website
Employees
1099
AeroLeads page
10 roles

Daniel Cutler work experience

A career timeline built from the work history available for this profile.

Senior Project Engineer

Current

Perth, Western Australia, Australia

Feb 2023 - Present

Project Engineer

Robe Valley

Calibre Group contracted to be EPCM for RTIO Robe Valley to manage the major expansion of Mesa A and Mesa J Mines. This included the development of three new mining deposits and the construction of supporting infrastructure to continue operations of the two existing operational hubs.o Provide technical support throughout project phases ensuring design meets necessary engineering standards.o Site engineering focal point for both Calibre Perth and onsite Contractors o Created… Show more Calibre Group contracted to be EPCM for RTIO Robe Valley to manage the major expansion of Mesa A and Mesa J Mines. This included the development of three new mining deposits and the construction of supporting infrastructure to continue operations of the two existing operational hubs.o Provide technical support throughout project phases ensuring design meets necessary engineering standards.o Site engineering focal point for both Calibre Perth and onsite Contractors o Created numerous tracking and reporting tools for management and contractors: Daily Contractor Meetings, Shutdown Dashboards, Redline / AsBuilt & TQ Registerso Monitoring & reporting on aspects of project quality, cost & progresso Mentored and provided guidance to budding engineers from both internal Calibre Graduate Program and external hiring sources who required it. Show less

May 2020 - Oct 2022

Project Engineer

Hope Downs 1 & 4

Engenium were contracted in to assist with the management of Capital Projects on both Rio Tinto Hope Downs 1 and Rio Tinto Hope Downs 4 Sites. o Responsible for managing, coordinating, and delivering packages of work within the overall project.o Preparation of scope and specification for tender documentation.o Develop preliminary scopes of work / detailed proposals.o Coordinate kick-off meetings (vendor supply and sub-contractor).o Responsible for schedule maintenance… Show more Engenium were contracted in to assist with the management of Capital Projects on both Rio Tinto Hope Downs 1 and Rio Tinto Hope Downs 4 Sites. o Responsible for managing, coordinating, and delivering packages of work within the overall project.o Preparation of scope and specification for tender documentation.o Develop preliminary scopes of work / detailed proposals.o Coordinate kick-off meetings (vendor supply and sub-contractor).o Responsible for schedule maintenance and progress tracking. o Approval of extra works and variations. Show less

May 2019 - Feb 2020

Project Engineer

Perth, Australia

MGJV is a joint venture between Monadelphous and Giovenco, bringing together Monadelphous’ expertise in delivering quality maintenance solutions with Giovenco’s capability in providing a broad range of industrial services for the Karratha Life Extension Project for Woodsides Karratha Gas Plant. Woodside’s KGP is located roughly 30 kilometres North of the Karratha township. The Project roster is 3 weeks on 1 week off.o Lead Engineer for KLE Package, Seawater Firewater Pump Platform… Show more MGJV is a joint venture between Monadelphous and Giovenco, bringing together Monadelphous’ expertise in delivering quality maintenance solutions with Giovenco’s capability in providing a broad range of industrial services for the Karratha Life Extension Project for Woodsides Karratha Gas Plant. Woodside’s KGP is located roughly 30 kilometres North of the Karratha township. The Project roster is 3 weeks on 1 week off.o Lead Engineer for KLE Package, Seawater Firewater Pump Platform Refurbishmento Generation and Management of Construction SMP Work Packs & Job Cardso Red-Line mark ups of PEFS / P&ID drawings and construction drawingso Procurement support, material take offs, plant, and equipment, etc.o Problem solving for site clashes, design errors and missing scope to provide solutions for offsite engineering team. Show less

Aug 2016 - May 2019

Project Engineer

Roy Hill Iron Ore Project, Wa (Thiess)

SMP Engineering was brought into the Roy Hill Project to integrate with the Thiess Engineering team to complete the contract awarded to Thiess by Samsung C&T. Main focus to construct the mine’s process facilities. The site is located roughly 280 kilometres due south of Port Hedland. The roster was 3 weeks on 1 week off. o Generation and management of Construction Work Packso Ensured that all Construction Work Packs contained necessary QA/QC documentationo Daily progress… Show more SMP Engineering was brought into the Roy Hill Project to integrate with the Thiess Engineering team to complete the contract awarded to Thiess by Samsung C&T. Main focus to construct the mine’s process facilities. The site is located roughly 280 kilometres due south of Port Hedland. The roster was 3 weeks on 1 week off. o Generation and management of Construction Work Packso Ensured that all Construction Work Packs contained necessary QA/QC documentationo Daily progress reporting to management and client.o Red-Line mark up of P&ID drawings.o MDR (Master Document Register) and PDB (Project Database) support such as ITC and ITP closeout.o Clarification of construction drawings inc. piping isometrics, P&IDs, structural, general arrangements, etc Show less

Jan 2015 - Sep 2015

Project Engineer

Qgc – Qclng Project Qld (Thiess)

SMP Engineering was brought into the QGC QCLNG Project to assist Thiess with their 6+1 project. The six field compression stations and one central processing plant, to be built about 30km north-west of Dalby in southern Queensland, represent some of the upstream facilities being developed by QGC. The roster was 2 weeks on 1 week off. o Completing as-built mark-ups of drawings (structural drawings and piping isometrics) for numerous facilities o MDR (Master Document Register) and PDB… Show more SMP Engineering was brought into the QGC QCLNG Project to assist Thiess with their 6+1 project. The six field compression stations and one central processing plant, to be built about 30km north-west of Dalby in southern Queensland, represent some of the upstream facilities being developed by QGC. The roster was 2 weeks on 1 week off. o Completing as-built mark-ups of drawings (structural drawings and piping isometrics) for numerous facilities o MDR (Master Document Register) and PDB (Project Database) support such as ITP closeout.o Leading client walkdowns to generate remaining works/punch listing primarily for structural systemso Reporting to and assisting the Area Manager, Project Manager and Engineering Manager in their daily duties.o Support client activities required for completion of key milestones. Show less

Apr 2014 - Dec 2014

Project Mechanical Engineer

Santos Glng Project For The Clough Downer Joint Venture

Clough Downer Joint Venture was awarded the $600m contract by Fluor for construction of pipelines, compression facilities and associated infrastructure relating to the Fairview component of the Santos GLNG project, located in the Surat Basin. The station’s purpose is to convert coal seam gas to liquefied natural gas for export to global markets. The roster was 3 weeks on 1 week off. o Managed, organised, and provided support in the construction of the underground services.o Designed… Show more Clough Downer Joint Venture was awarded the $600m contract by Fluor for construction of pipelines, compression facilities and associated infrastructure relating to the Fairview component of the Santos GLNG project, located in the Surat Basin. The station’s purpose is to convert coal seam gas to liquefied natural gas for export to global markets. The roster was 3 weeks on 1 week off. o Managed, organised, and provided support in the construction of the underground services.o Designed an excel spreadsheet that served as a reporting tool for upper management detailing daily, weekly, and monthly breakdowns of piping installation. o Developed a progress tracking spreadsheet which listed pipelines via subsystems with supporting information (P&ID’s & piping isometrics). o Provide a variety of engineering services for both internal and external clients to achieve objective milestones.o Investigate and resolve engineering issues at a site level and prepare / close out RFIs. Show less

Jul 2012 - Nov 2013

Undergraduate Mechanical Engineer (Student Work Placement)

Wesfarmers Curragh Project, Blackwater (New Chpp)

The Curragh Project consisted of constructing a new 1200tph of Coal Handling Preparation Plant (CHPP) located 14km north-west of Blackwater in the Bowen Basin of Central Queensland. The expansion of the coal preparation and mine costs approximately $286m. The plant produces 2 types of coal simultaneously, coking and streaming coal for international use and Stanwell Power Station outside Rockhampton. The roster on the Curragh Project was 11 days on and 3 days off. o Developed a further… Show more The Curragh Project consisted of constructing a new 1200tph of Coal Handling Preparation Plant (CHPP) located 14km north-west of Blackwater in the Bowen Basin of Central Queensland. The expansion of the coal preparation and mine costs approximately $286m. The plant produces 2 types of coal simultaneously, coking and streaming coal for international use and Stanwell Power Station outside Rockhampton. The roster on the Curragh Project was 11 days on and 3 days off. o Developed a further understanding of a construction project and all the ancillary functions that are required to support construction activities.o Successful completion of my thesis on the commissioning process which involved a complete understanding of plant and its process equipmento Gained an understanding of Downer’s programs and databases (ie. Navis Works, Tekla Structures, Virtual Model) o Learnt valuable communication skills dealing with people from all levels of the construction site. This included peers, managers, high level managers and well as construction personnel and client representatives. Show less

Jul 2011 - Jan 2012

Field Engineer (Student Vacation Employment)

Yarwun 2 Alumina Project (North Of Gladstone)

Bechtel Construction was contracted to Rio Tinto Alcan Yarwun (RTAY) expansion of its alumina refinery situated in the Yarwun area 10km north-west of Gladstone in Central Queensland. The refinery incorporates leading edge technology and environmental design features which have also been incorporated into Yarwun 2. The working roster was the standard working week. o I gained an understanding of alumina and its associated risks involved with its production process.o I achieved an… Show more Bechtel Construction was contracted to Rio Tinto Alcan Yarwun (RTAY) expansion of its alumina refinery situated in the Yarwun area 10km north-west of Gladstone in Central Queensland. The refinery incorporates leading edge technology and environmental design features which have also been incorporated into Yarwun 2. The working roster was the standard working week. o I gained an understanding of alumina and its associated risks involved with its production process.o I achieved an insight into how a company works, through the different phases of projects.o I was able to communicate with a wide variety of people including, other staff members, managers, site crew members, hierarchy, and clients. Show less

Nov 2010 - Feb 2011

Draftsman (Student Work Placement)

Cq Steel Industries

Rockhampton, Australia

Main Duties and Responsibilities: • Responsible for the production of detailed workshop drawings for the steel fabrication workshop. • Required to liaise with clients to ensure their requirements were met. • Undertook measuring of existing buildings and discussed project requirements with both the client and my employer. To undertake this position I had the following attributes:-• Knowledge of AutoCAD • Interpret structural design drawings • Interpret mechanical… Show more Main Duties and Responsibilities: • Responsible for the production of detailed workshop drawings for the steel fabrication workshop. • Required to liaise with clients to ensure their requirements were met. • Undertook measuring of existing buildings and discussed project requirements with both the client and my employer. To undertake this position I had the following attributes:-• Knowledge of AutoCAD • Interpret structural design drawings • Interpret mechanical design and conveyor information • Have a practical approach to manufacturing• Have attention to precision and detail in their work• Ability to do some basic design using Australian Standard guidelinesPersonal Achievements from this work placement:• Completed all work given to me in a professional manner to the standard required by my employer. • Achieved an insight into how a company works, through the different phases of projects.• Assisted in “whole” projects including tendering, quoting, drafting, communicating work to fabricators and assisted with the installation. • Communicate with a wide variety of people including, other staff members, managers, workshop workers, and clients. Show less

Nov 2009 - May 2010
Team & coworkers

Colleagues at DRA Global

Other employees you can reach at draglobal.com. View company contacts for 1099 employees →

3 education records

Daniel Cutler education

Bachelor Of Engineering (B.Eng.) (Mechanical), Mechanical Engineering, First Class Honours

Diploma Of Professional Practice (Engineering), Mechanical Engineering, First Class Honours

Education record

Emmaus College Rockhampton
FAQ

Frequently asked questions about Daniel Cutler

Quick answers generated from the profile data available on this page.

What company does Daniel Cutler work for?

Daniel Cutler works for DRA Global.

What is Daniel Cutler's role at DRA Global?

Daniel Cutler is listed as Senior Project Engineer at DRA Global.

Where is Daniel Cutler based?

Daniel Cutler is based in Scarborough, Western Australia, Australia while working with DRA Global.

What companies has Daniel Cutler worked for?

Daniel Cutler has worked for Dra Global, Calibre, Engenium, Monadelphous, and Smp Engineering.

Who are Daniel Cutler's colleagues at DRA Global?

Daniel Cutler's colleagues at DRA Global include Syed Aftab, Neale Sausman, Mark Townsend, Sibusiso Edgar Makhanya, and Kathy Joubert.

How can I contact Daniel Cutler?

You can use AeroLeads to view verified contact signals for Daniel Cutler at DRA Global, including work email, phone, and LinkedIn data when available.

What schools did Daniel Cutler attend?

Daniel Cutler holds Bachelor Of Engineering (B.Eng.) (Mechanical), Mechanical Engineering, First Class Honours from Cquniversity.

What skills is Daniel Cutler known for?

Daniel Cutler is listed with skills including Construction, Piping, Project Engineering, Engineering, Mechanical Engineering, Epc, Autocad, and Project Control.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Daniel Cutler you were looking for.

View similar profiles