Ait Planning Engineer
Current• Study of bills of materials for the preparation of material lists necessary for factory integration activities • Needs and related management (RDA, Purchasing and supplier follow-on). Schedule analysis with the aid of ad hoc techniques (CPM, LT Analysis, What If scenario analysis) with particular attention to critical issues and their resolution • Integrated project master schedule development by interfacing with the Project Manager and updating of the master schedule through coordination with the various departments and related managers • Logistics activities related to the movement within the site and between the Italian and French site (French Guiana) of materials and equipment • Warehouse/logistics manager in the launch campaign at the AVIO site in French Guiana: the activity involves the coordination of the activities and personnel employed for the preparatory phases (preparation of materials, equipment, PPE, support elements) as well as equipment handling logistics, support elements and stadiums • Ship loading/unloading coordination logistics activities of inert materials and active stages at the port calls in French Guiana for the launch campaign activities.