David H.

David H. Email and Phone Number

General Superintendent @ Conam Construction Company
dallas, texas, united states
David H.'s Location
Wallisville, Texas, United States, United States
About David H.

I have spent my career in Gulf of Mexico and Alaska. Installation of large oil and gas facilities in Valdez Alaska, Prudhoe Bay Alaska and the offshore platform industry in both Alaska and the GOM. I am an experienced marine offshore construction supervisor. I manage logistics, materials, heavy lifting , loading, shipping, transport trucking, heavy marine construction, top sides, spar hulls, subsea manifolds, subsea injection skids, mud mats, jackets, templates, crane pedestals, reconstruction of burned out topside, heavy reinforcement retrofits, sea lifts, 400 series barge loading, vessel inspection, pile driving, graving docks, locks, coffer dams, dock construction for super tankers, ballast water treatment facilities, new tank farm construction, tank farm refurbishment and demolition. Construction supervisor of oil and gas production facilities, pipelines and refineries. Sea lift coordination and installation of many large facilities in Prudhoe Bay Alaska. Installation of production drill sites with multiple truck able modules up to 100 tons. Managed ultra-large frack tank service company in Permian Basin West Texas.

David H.'s Current Company Details
Conam Construction Company

Conam Construction Company

View
General Superintendent
dallas, texas, united states
Website:
conamco.com
Employees:
112
David H. Work Experience Details
  • Conam Construction Company
    General Superintendent
    Conam Construction Company Jul 2013 - Present
    Conoco Phillips Prudhoe Bay Alaska
    General Superintendent for construction of permanent drilling / production facilities in arctic Alaska North Slope Prudhoe Bay. State of the art designed projects completed under budget and ahead of schedule.Pre Planning deliverablesSafe work planning Job Hazard AnalysisPreparation of definitve estimate Develop work scheduleHire craftLogistics planning Mobilize people equipment and faclities to jobSchedule and supervise safe execution of work Engineering RFI Change ordersQC documentation and system handover to clientProject control cost, schedule and equipment managementSafety SupervisorSupervise critical lifting of all cranes 75 ton-400 tonSpecify Welding Procedures
  • Big Creek Mining Llc
    Project Manager
    Big Creek Mining Llc Feb 2013 - Jul 2013
    Fairbanks, Ak / Coldfoot, Ak
    Development of new gold mine for 2013 mining season. Phase I infrastructure. Procurement, logistics and construction of 80 mile winter trail, 20 man camp, landing strip, heavy equipment and 50,000 gallon tank farm. Phase II Production. Scheduled to process 150,000 tons of ore.
  • Price Gregory Inc
    Pipeline Superintendent
    Price Gregory Inc Jan 2011 - Dec 2012
    North Slope Alaska
    Arctic ice road and pipeline construction project laying 14 miles 30" source water supply pipeline.
  • Asrc Energy Services, Llc
    Construction Superintendent
    Asrc Energy Services, Llc Jan 1995 - Jan 2012
    Various
    ConocoPhillips Built 19 well drill site with pipe racks, utility buildings and process facilities. 260 tons of heavy lifts and steel erection.BP - North Star Drilling Island Vapor Recovery Unit: Supervised the rigging and crane to lift one hundred tons of support structure and modules. Welded cantilevered supports on location at one hundred feet elevation and installed approximately three hundred feet of 16 inch SS piping with E&I controls, heat trace and insulation. Work required difficult lifting and rigging in continuous strong winds and arctic conditions. The support structure and piping was performed from hanging scaffolds above live process tanks which could not be shut down.N Pad Debottlenecking Project: Demolition and replacement of abandoned production header valves during live operation in an active oil gathering manifold module. Online welding of split tees and assisting TDW in hot tap activities.Milne Point: 8” and 6” produced water injection pipeline with facility tie-ins of Launcher and Receivers.Liberty Ultra Extended Reach Drilling Rig Project: Coordination of logistics for labor, material, equipment, office facilities, Civil work included new river crossing bridge and a new manmade production island. Drove pipe piles for bridge support. Z-piles piles were installed to divert water and reinforce the abutments. This eleven acre island had 2200 of feet of z-pile dock face and open cell with tiebacks. Drove 200 6” pipe piles and placed and erected 160 man camp. Hauled and compacted 600,000 yards of gravel for the island lift and extension. Coordination of logistics and labor for sealift and placement of the Liberty drilling rig modules on location at Endicott satellite drilling island built within close proximity of active drilling and well service work on a daily basis.

Frequently Asked Questions about David H.

What company does David H. work for?

David H. works for Conam Construction Company

What is David H.'s role at the current company?

David H.'s current role is General Superintendent.

Who are David H.'s colleagues?

David H.'s colleagues are Sara Keene, Jeff Olson, Pmp, Sp, Rmp, Afhly Marte, Adam Hubler, Bob Delong, Leon Rigor, Joseph Diltz.

Not the David H. you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.