Transportation Elecrician Apprentice
CurrentWorked on 405 freeway/Sepulveda pass widening project: Installed temp/permanent street lighting, temp/permanent traffic signal poles, wired up signal/street light poles, installed temp power services, worked with crane operators to install wood poles, traffic poles, street light poles, worked with back hoe operators, pot holed for utilities, used jackhammer to open trenches, installed 1/2"-4" pvc/rigid conduits,drove company vehicles, maintained a clean work environment, kept safety as top priority, got along with different trades in the area, finished tasks in a timely manner.