Master Lift Builder
●Train general laborers to prep steel for the next step in the process.●Kept assembly room supplied with parts. Maintained daily inventory and re-ordered when needed.●Assembled the lift mechanism and stress tested for durability.●Provided feedback on production times and QC for performance.Tumbler Operator 11/ 2020- 1/ 2021●Trial and error, tweak and adjust, hope for the best. The machine had seen much better days.General Labor 8/2020- 1/2021● Prep stainless steel for Tig and spot weld. While prepping, each piece was given the first of 3 in process inspections.●Peel protective coatings and wiping down parts when applicable before packaging for shipment.●Assembled 1000 hand cranks and 1000 lift mechanisms bi-monthly, to maintain stock for the main assembly room.