Technical Coordination Engineer
CurrentProject:*Greater Cairo Metro Line 4 – PH 1 & Depot The project comprises the construction of depot and workshop area for Phase 1 of Greater Cairo Metro Line 4, with a total length of 18.8 km. The line runs from Hadayek Al-Ashgar station to El-Malek El-Saleh station and consists of a total of 16 stations, where traction power is provided through the 3rd rail system (750 VDC).