Doug Whipple work email
- Valid
- Valid
- Valid
Doug Whipple personal email
- Valid
Doug Whipple phone numbers
SUMMARY OF QUALIFICATIONS:
A&D Consulting
-
Owner ConsultantA&D Consulting May 2021 - Present
-
Construction ManagerAmes Construction Feb 2020 - May 2021 -
SuperintendentShimmick Construction Apr 2018 - Feb 2020Northern California -
SuperintendentTeichert Jun 2016 - Mar 2018 -
General SuperintendentFlatiron Construction Oct 2014 - Jul 2016San Francisco Bay AreaCalaveras Dam Replacement Project, $580M Sunol, CA SFPUC -
Construction ManagerFlatiron Construction 2012 - 2014California, Usa And Fort Mcmurray, Alberta CanadaSuperintendent Oakland Army Base Redevelopment Project, $160MOakland, CATurner, Top Grade & Flatiron make up this joint venture project for the redevelopment of the 150 acre army base. Currently responsible for underground replacement of over 12,000 feet of storm and sewer drains and waterlines.Construction Manager TOTAL, $280MFort McMurray, ABThis project consisted of road building for Alberta Transportation and included construction of 7 bridges and 20 kilometers of highway.Construction Manager West & East Tank Farms Downstream U&O Expansion, $56MFort McMurray, ABThis project consisted of 6000 meters of fire water line HDPE, 1500 meters carbon steel, 450 thousand cubic meters of embankment and includes 5 tank pads. This project is in the brown zone and requires careful coordination and precise scheduling of production. Construction Manager Parsons Creek Grading and Storm Water Management, $28MFort McMurray, AB This project consisted of hauling and placing 1 million cubic meters of embankment across two high-pressure oil pipelines and fiber optic line, using 12-657 scrap¬pers and 6-775 heavy haul trucks across Hwy 63 with a temporary traffic signal across a live highway. Work was performed 24-7 with a 90-day duration and a liquidated damage and included construction of a storm water man¬agement facility consisting of a network of drains, large settlement ponds and concrete pipe. No loss time incidents or schedule delays, in an environment of extreme weather conditions. Delayed Coker Unit Expansion, $22M Fort McMurray, ABThis project consisted of bulk excavation, 286 drill shafts, 26 meters in depth, structural concrete as well as 24-inch HDP firewater line install and Potentially Contaminated Storm Sewer (PCSS). The storm sewer consisted of 20 - 20” reinforced concrete pipes and 8” epoxy coated carbon steel pipes. No loss time incidents. -
Construction Manager & SuperintendentSuulutaaq, Inc. 2009 - 2012Napa, CaConstruction Manager USACE Army Corp of Engineers /Napa Flood Control DistrictNapa Valley Wine Train Relocation and Flood Protection, $90MWorked closely with the Army Corp of Engineers and City of Napa Flood control to perform storm water prevention to the site including installing underground improvements on 3 cross streets and digging out water ways and swales to prevent storm water runoff and turbidity.One mile of rail relocation (35 feet West and 5 foot elevation rise) while simultaneously replacing 1 river bridge, 2 dry bridges in addition to underground infrastructure in 3 major thoroughfares in downtown Napa. Maintained public access to downtown businesses and continuing operation of existing railroad. Created positive business relations with downtown merchants and public outreach. Worked 950 days with no loss time accidents.Superintendent Redwood Road Slide Repair – FEMA funded, County of NapaEmergency slide repair including construction of a Soldier Pile wall and 250 ft. Burrito Drain above a river with one-way traffic control. Fine grade and pave.Project completed two weeks ahead of schedule.
-
SuperintendentSierra Nevada Construction 2007 - 2008Tremal Crow – Tahoe/Reno Industrial Center1.2 million CY 657 spread, full package job, three 800,000+ SF commercial building pads, utilities, fine grade pave with onsite crusher for AB; 3/4 crush, structural backfill, and joint trench sand. Installed all infrastructure and fine grade & pave. Cal-Trans – Hwy 80 Yuba Gap Truck LanePerforming keyway excavation; drill and shoot geo-grid; structural backfill; 3 miles replacement of drainage and box culvert structures; fine grade pave.Devcon – Triple A Ballpark, Downtown RenoEngineering sewer bypass 28 ft on the Truckee River with relocation of 2 fire houses, utilities, fine grade pave.Cal-Trans – Kings Beach Sedimentation ProjectReplace 6000 lf retaining wall, silt ponds, curb and gutter, fine grade pave. South Lake Tahoe AirportGrind and pave, all can lighting, base rock and pave, divert water with extensive erosion control. -
SuperintendentDesilva Gates Construction 2001 - 2007Superintendent Lennar Homes – West Valley View DevelopmentSupervised 1200 home project in El Dorado Hills. This was a 1,000 acre jobsite which included supervising 3 underground contractors, 3 joint-trench contractors, 4 wall subcontractors, an onsite rock plant including Class 2 AB, type 1 and 3 RSP backing for rock lined ditches, and 3 drill and shoot subcontractors. Maintained relationships with six developers. We were under a “zero dust tolerance” requirement and had to maintain strict water quality requirements with the State of California Fish and Game, El Dorado Irrigation District, and DOT present on jobsite at all times. Zero loss time incidents.Foreman BFI Landfill, Half Moon Bay -
Working ForemanPrevious Experience 1981 - 20011999-2001 KiewitSerrano Hills Housing Development, Promontory Housing Development and San Carlos Light Rail1996 – 1999 DeSilva Gates1993 - 1995 Kiewit – Brisbane, CA 1991 – 1993 Oliver DeSilva Construction1990 – 1991 E. L. Yaeger Construction1989 – 1990 Sukut Construction1981 – 1989 Oliver DeSilva
Doug Whipple Skills
Frequently Asked Questions about Doug Whipple
What company does Doug Whipple work for?
Doug Whipple works for A&d Consulting
What is Doug Whipple's role at the current company?
Doug Whipple's current role is Construction manager.
What is Doug Whipple's email address?
Doug Whipple's email address is dw****@****ick.com
What is Doug Whipple's direct phone number?
Doug Whipple's direct phone number is +120929*****
What skills is Doug Whipple known for?
Doug Whipple has skills like Construction, Construction Management, Contract Management, Contractors, Project Estimation, Change Orders, Construction Safety, Concrete, Primavera P6, Subcontracting, Value Engineering, Bridge.
Not the Doug Whipple you were looking for?
-
5sinclairgroup.com, dow.com, dow.com, arbinger.com, arbinger.com
-
2dwhipple.com, dcwhitecollar.com
-
3hotmail.com, kroger.com, thekrogerco.com
4 +151362XXXXX
-
1yahoo.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial