Professional Engineer with 20+ years of experience in Project and Construction Management of complex energy(pipelines, storage tanks, heat exchanges, boilers, fracking columns, pressure vessels), water supply, waste management treatment plant, maintenance etc.IWE/EWE licenses for welding works as well as 430 and 432 licenses as authorized contractor.High degree of comfort in multi-disciplined and multi-cultural workforce.I am highly adaptable, with ability to thrive and prosper in demanding and challenging projects, as well in a non-traditional office environment.Professional communication skills both written and oral, in clear concise language.Managed some of largest projects in Serbia and abroad with highest emphasis on integrity, safety, quality and cost.
Termoenergo Inženjering
-
Senior Consultant And SupervisorTermoenergo Inženjering Jan 2021 - PresentBelgrade, SerbiaWorks on preparation and review of documents for submittal for IDR and IDP approval for Jadar project
-
Project Consultant On Delay Cooker ‚Unit At Refinery Pančevo, SerbiaTermoenergoinženjering Mar 2018 - Dec 2020Pančevo, SerbiaSupervising and inspection of process and piping facilities including development and reconstruction of MHC & DHT unit S-4300 ,Sulphur unit S-4450,reconstruction of TNG Merox III S-2550 and Manipulation and filling station S-24100 and full erection of amine recovery unit S-5950 and S-5900.
-
Project Manager For Fabrication Of Pipe Spools (From ½"-28" Steel Pipes) For Refineries .Bmr Group Šabac Oct 2017 - Mar 2018ŠabacMain responsibilities: • Preparation and plan of production according to documentation (isometrics) of investor. • Clarification on drawings of isometrics which are not correct. Making suggestion to solve problems. • Control of WPQR, WPS and ITP procedures and organization TÜV SUD control and acceptance. • Welding done as per 111,135,136 and 141 EN5817 " B". • Organization of VT/MT/RT form third party. • Monthly /weekly/daily progress report. Production and mitigation plan of production. • Coordination meeting with investors and representative owner of facilities. • Preparation of delivery and payment sheets according to contract documents. • Organization and following of assembly work with all parts of activities necessary for execution and finalization on work at site.
-
Project Manager ConsutantEnergoprojekt Entel Qatar Sep 2015 - Oct 2017Qatar Doha Water Mega ReseroirsConstruction of Water Mega Reservoir consist of 5(five) new Primary Reservoirs and Pumping Stations (PRPS) connected with Transmission and Corridor Main system of pipelines and existing distribution system to provide a minimum 7 days Strategic Water Storage.Total value of project; 4.600.000.000 USD •All matters related to the Field Engineering and Construction, with focus on critical installations following contract specifications - requirements ,General Specification for Contracts, General Specification of Main Laying Material for Waterworks and Qatar Construction specification (QCS2014) •Ensure all requirements relating to HSE and Security are met (Tool Box Talks, Weekly Safety Walk, Critical Lifting, Job Safety Analyze)•Review/ Feedback/ Comments on:Contractors’ Execution Plan, Detail Schedule / Look-ahead Work Plans, Mitigation Plans, Method Statements, QA/QC Procedures, ITPs, Shop Drawings•Reporting, Meetings:Daily / Weekly Reports; Weekly Progress Report & Progress Meeting; Engineering/ Technical Review; Weekly Interface Meeting; Pre-Construction Meetings•Conduct constructability review during pre-construction meeting, providing technical experience and advice to the Contractor/ Subcontractor•Review and feedback on Request for Information (RFIs) Approve Site Instructions as necessary•Participate in design clarifications •HSE performance of up to 550 direct workers over a multi-year period; Zero LTI•Coordination of forward planning, introducing “Two weeks look ahead schedule” •Analyze and evaluate the Contractors’ Claims and prepare recommendations Report•Review and follow up to prepare the variation orders and recommendations for the Client -
Project ManagerOgrank Porr Bau Gmbh Beograd Jun 2010 - Aug 2015Novi SadRelocation of gas and oil pipe installation in to new energy corridor north of highway E-75 in Novi sad area.Total length of all installation 43 Km ,size from 26" to 8" with all crossings and reconection to existing pipelines,commissioning and handing over to the clients as per API 5L.Total value of project 18, 7 Mil. €uro Sewerage pipeline with 3 pieces pumping station, costruction of concrete manifolds, drilling of wells and dewatering in Begec –Novi sad. Total value of project 1.25 Mil. €uro Water pipeline in Popovica –Novi sad. Total value of project 0.125 Mil. €uro Sewerage pipeline with one pumping station, house connection, drilling of wells and dewatering in Veternicka rampa-Novi sad. Total value of project 0.39 Mil. €Waste Water treatment plant in Vrbars .Total value of project 2.3 Mil. €uroLeading and overseeing multidisciplinary construction team: HSE, Project Controls, Procurement, QA/QC, Field Engineering, Interface Coordination, Superintendents, Supervisors, Inspectors, Specialists, Support Services, Vendor Representatives, Commissioning / Hand-OverPreparing Construction Management Plan, Detail Construction Scheduling, Look-ahead planning, Mitigation Plans, Overseeing and coordination of work fronts, Integration of construction activities into an existing plant operationCoordination of all activities in process of environmental permitting & construction approvals from authorities, as needed for smooth progress and completion of the workImplementation of Quality Management System (ISO 9001:2008) - ensure to follow the Manual for transport carbon hydrogen fluid through pipelines and Project Quality Specification,analyze and evaluate the Contractors’ Claims and prepare recommendations Report Reviewing and certification of Interim Payment- Statement and supporting documents submitted by Contractors
-
Construction ManagerHbk Contracting Company W.L.L Mar 2008 - Sep 2010GTC 158/2007 Main Water pipeline project Raslaffan “C” 1600mm, water distribution pipeline DN1600mm from Duhail to desalinization plan in Ras Laffan Industrial city (total length 82.375 Km) with online chambers for installation of washouts and air valves. Installation of pressure /surge vessels and pumps in pumping stations and connection to existing distribution pipelines and reservoirs including pressure tests, flashing ,sterilization and handing over-commissioning.Total value: 250.000.000 USDTo perform all the Works as requested by the Contract and Project Technical Data BookTo achieve the critical milestone dates as identified in Contract documentsI managed multidisciplinary site project team with following structure: Project Controls, Procurement, HSE, QA/QC, Field Engineering, Interface Coordination, Construction Superintendents/ Supervisors/ Inspectors, Specialists, Support Services, Vendor RepresentativesContractual deliverables: Execution Plan; Q Plan; Detail Scheduling; Look-Ahead Work Plans & Reports; Mitigation Plans; QA/QC procedures; Procurement and Subcontracting Plans; RFIs; Method Statements; ITPs; Shop Drawings; Material & Data Submittals; Free-issue MaterialMeetings: Weekly Progress Report & Progress Meeting; Engineering/ Technical Review; Vendor Coordination Meeting; Weekly Interface Meeting; Pre-Construction MeetingsResponsible for obtaining all necessary Permits and Licenses, ensuring compliance, at all times, with RO authorities, Health Safety and Environmental directives, codes, standards and guide lines.To provide satisfactory and acceptable handover of the Works in an orderly manner and in accordance with Contract requirements, including all documentation and certificationsMechanical Completion and Turnover of all portions of work achieved within contracted schedule. -
Construction ManagerPetrolcomet D.O.O. Feb 2006 - Sep 2007Raslanuf Rasco Refinery ,Sahabi And Amal Oil Field, LibyaTo perform all the Works as requested by the Contract and Project Technical Data BookTo achieve the critical milestone dates as identified in Contract documentsI managed multidisciplinary site project team with following structure: Project Controls, Procurement, HSE, QA/QC, Field Engineering, Interface Coordination, Construction Superintendents/ Supervisors/ Inspectors, Specialists, Support Services, Vendor RepresentativesContractual deliverables: Execution Plan; Q Plan; Detail Scheduling; Look-Ahead Work Plans & Reports; Mitigation Plans; QA/QC procedures; Procurement and Subcontracting Plans; RFIs; Method Statements; ITPs; Shop Drawings; Material & Data Submittals; Free-issue MaterialMeetings: Weekly Progress Report & Progress Meeting; Engineering/ Technical Review; Vendor Coordination Meeting; Weekly Interface Meeting; Pre-Construction MeetingsResponsible for obtaining all necessary Permits and Licenses, ensuring compliance, at all times, Health Safety and Environmental directives, codes, standards and guide lines.To provide satisfactory and acceptable handover of the Works in an orderly manner and in accordance with Contract requirements, including all documentation and certificationsI conducted regular and ad-hoc meetings with the Client and PMC, to prevent and resolve any contractual issuesAs “Contractor Management Representative” assigned to the project, I was acting as interface between the Client, Veba oil field, AGOCO.Co authorities, Corporate Management and site project team.Mechanical Completion and Turnover of all portions of work achieved within contracted schedule. -
Mechanical Design And Production EngineerLuk Loznica Mar 2004 - Feb 2006Loznica, Centralna Srbija, Serbia• Designing of tools and production parts for pipelines and burners ,corrugated pipes, atypical elbows , manifolds, flame tube, pipe joints and register to DN 1200 mm, Dual and single axes compensator( CS and SS) for pipeline up to 20” size. • Technical documentation, certification and verification of finished parts including checking welds and production preparation, tender preparation up to completion and delivery of finished products.
-
Project Engineer / Maintenance EngineerA.D Hemiremont Sep 2001 - Feb 2006Loznica, Centralna Srbija, Serbia• All matters related to the Field Engineering and Construction, with focus on critical installations: Boiler plant, coal mills, replacement of steam generators registers, conveyors for coal, wood delivery, removal of bark, chipping machines, air blower system to silos. • Fast track project, requiring fast mobilization and effective execution maintenance of centrifugal pumps for all chemicals used in production of pulp for cellulose paper, maintenance of all process machines in line system production.• Pipelines: steam, strong acid, sulfur molten, boiler feed water, process water, cooling water, plant air and instrumentation air.• Project Manager for detail engineering, equipment and machinery manufacturing, onsite installation, commissioning.
-
Project-Resident EngineerZelten Oil Services Co.-Benghazi, Libya During Work In A.D Hemiremont -Loznica Apr 2003 - Feb 2004Raslanuf ,Sahabi Field And AmalProjects: Cleaning, sandblasting with repairing (replacement of annular), refurbishment of steel tank vessel GT-01 capacity 400000 barrels in Marsa el hariga oil field for AGOCO Co. with associate pipelines connection, heaters and pumps Cathodic protection and testing, as per requirements of API 650 standards . Total value of projects 1.20 Mil. €uro
-
Maintenance EngineerNovacel D.O.O Loznica Mar 1999 - Sep 2001Loznica, Centralna Srbija, Serbia• Maintenance of the entire plant for the production of cellulose cardboard timber of receipt, cooker, whiteness plant to cellulose machines and boilers.• Maintenance of centrifugal pumps, mixers, boilers and making of technical documentation and organization of planned maintenance.• Making plans for the construction and improvement of existing facilities.• Preparation, control being, supervision, installation and commissioning of gas boiler unit capacity 60t 10 bar steam for distant heating and process of production in the factory "Viskoza A.D" Loznica, Serbia.
Dusan Basic Education Details
-
University Of Mechanical Engineering ,BelgradeIndustial Engineering -
Gymnasium Vuk Karadzic Loznica
Frequently Asked Questions about Dusan Basic
What company does Dusan Basic work for?
Dusan Basic works for Termoenergo Inženjering
What is Dusan Basic's role at the current company?
Dusan Basic's current role is Senior Consultant and supervisor for process piping erection - Termoenergo inženjering.
What schools did Dusan Basic attend?
Dusan Basic attended University Of Mechanical Engineering ,belgrade, Gymnasium Vuk Karadzic Loznica.
Not the Dusan Basic you were looking for?
-
-
-
-
1gmail.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial