Team Member
CurrentAchieved a 2-day turnaround time on a new member project to streamline manufacturing. Worked with an international energy drink organization to supply the team with 48 weekly energy drinks. Designed and installed over 30ft of ducting to safely manage the carbon monoxide from the dyno exhaust outflow. Assisted with maintenance of team vehicles to ensure adequate transportation conditions for all team equipment.