Production Gm
CurrentReporting to: CEOManaging Scope: Production, Engineering, Quality, Planning, Warehouse, Project.Pursue Operation Excellence through 3 key drivers: Operation System, Management Infrastructure, Mindsets & Behaviors & Capability, to deliver high performance result in Quality, Cost, Delivery, and Safety, also enhance team capability improvement to ensure continuous improvement:1) High Quality:QMS improvement to meet different requirement from: ISO9001, BRC, PEFC/FSC, meantime… Show more Reporting to: CEOManaging Scope: Production, Engineering, Quality, Planning, Warehouse, Project.Pursue Operation Excellence through 3 key drivers: Operation System, Management Infrastructure, Mindsets & Behaviors & Capability, to deliver high performance result in Quality, Cost, Delivery, and Safety, also enhance team capability improvement to ensure continuous improvement:1) High Quality:QMS improvement to meet different requirement from: ISO9001, BRC, PEFC/FSC, meantime implement FMEA, Standardization, Systematic problem solving.2) Competitive Cost:- Slow-moving inventory reduction,- Automation implementation- Product and Raw amterials SKU rationalization3) On-time Delivery:- Improve the overall planning capability of the planning department,- Implement S&OP to improve coordination between production and sales,- Streamline production process, eliminate waste and bottleneck to improve overall equipment efficiency,4) Solid Safety- Improve safety through human behavior safety and machine physical safety- 5S implementation to build a safety foundation,5) Professional Team- Introduce and implement performance management mechanism for overall team, breakdown and align performance target from top to down,- Build Talent duplication mechanism for key positions: Engineer, Printing, and Maintenance team.- Implement Leader Standard Work for production management team.- Talent Review and talent echelon construction.Key Achievement:1) Safety accidents reduce 50%;2) Customer complaints reduce 50%, PPM reduce to 0.09 from 0.24;3) OTD improve to 90% from 50%;4) Slow-moving inventory reduce to 16% from 20%5) Introduce and implement Performance manage system and Talent duplication mechanism. Show less