Mining Engineering Intern
Current- Fully designed and scheduled a 28,000-ounce cut-and-fill gold mine using Deswik. Analyzed net present value, providing recommendations on the economic feasibility of the project in a comprehensive presentation
- Winner of the 2024 Nevada Gold Mines Top 20 Presentations
- Conducted stope line reviews, optimizing stope and drift geometry in Deswik to maximize total ounces and revenue.
- Designed blasts using Deswik.UGBD and Shot Plus
- Conducted underground surveys, installed survey control points, and established laser grade lines to ensure accurate guidance for operators during drifting operations.