Bridge Engineer
Current- Opportunity to see various offices throughout MnDOT to obtain a well-rounded experience of what goes into designing and constructing a bridge.
- Designed a prestressed concrete girder bridge for final design using Mathcad and Excel.
- Assisted in witting MNDOT standards for a prestressed concrete girder design example,utilizing debonded stands, to be implemented into the Minnesota LRFD Bridge Design Manual.
- Used A-Pile and Excel to design foundations for bridge abutments. Interpreted thoseresults to write foundation recommendations for our preliminary group.
- Performed construction inspection on 3rd Avenue Bridge over the Mississippi, HW-55 Reconstruct, and 35W Stormwater Storage Project.
- Layout bridge geometry in preliminary design using MicroStation drafting software.