Electrical Foreman
Directly involved in preparations and commissioning of Castoro 12 pipe laying barges firing line station including set up all automatic welding machines. And some modification in Electrical system. Including accommodation equipment and Kitchen and galley equipment.•Directly involved preparation installation and commissioning of Tie in Barge, TRB Trenching Barge in Baku and Storione, involved in side Boom Davit Crane, Generators, Electrical system, Ballasting Pumps, Winches (PLC operated) and navigational equipments.•Directly involved and commissioning of TB-1 Piles and Flares Installation Utility and Welding Barge in Baku, Azerbaijan, installation of all Electrical system, Kitchen and Galley and Navigation system.