Project Management Infrastructure In Ro,Bg,Md
Romania
OMV PETROM Expat Project Management Infrastructure DSO (Romania, Bulgaria, Moldova) Building and revamping 6 storage terminals around Romania including railway unloading, truck loading, VRU , Terminal Automation System (TAS)and :3x10000 m3, 5x5000 m3, 1x3000 m3, 11x2000 m3, 7x1000 m3 tank being responsible :•For preparing the all need documents for Gate keeping meetings for all Project phases as IDEA, IDENTIFY, SELECT, DEFINE and EXECUTE including the requested documents for each phase as Project charter, Cost Estimation, Risk register, Time Schedule, Contracting strategy, Project supply plan •For Concept, FEED and Detail Engineering, cost estimation, tenders evaluation and budget2014 Isalnita Terminal but in function and operation Diesel Coloring, Marking unit •Responsible for Concept, Detail Engineering works, cost estimation, tenders evaluation and budget2014 Jilava Old Terminal but in function and operation exiting terminal including 8x 10000 m3 and 4x5000 m3, Diesel tanks, fiscal metering, FAME blending, pumping unit. •Responsible for Concept, Detail Engineering works, cost estimation, tenders evaluation and budget2014 Jet A-1 Stock Optimization & Pipeline connection II. between Petrobrazi Refinery and Brazi Terminal •Responsible for FEED works, cost estimation2013 Fall protection project for 7 Storage terminals in Romania, Bulgaria, Moldova •Responsible for Details Engineering, cost estimation, tenders, budget, construction work 2010 Jet A-1 Pipeline connection I. between Petrobrazi Refinery and Brazi Terminal •Responsible for FEED works, cost estimation2009 Gasoline Bottom Loading Project in Romania •Building bottom loading for 16 storage terminals in Romania, being responsible for Details Engineering, cost estimation, tenders, budget, construction work and evaluation