Have a rich experience of over 35 Years in Project execution , Electrical maintenance and Power& utilities in Refinery & Petrochemical industry. In February 2017, I got retired from Indian Oil Corporation Ltd after a stint of 35 Years and was servicing as General Manager – (Head - Power & Utilities Dept.) of 15 MMT crude oil refinery. I was heading the Power and Utilities Department which ensured the safe commissioning of 15MMT gross root refinery & smooth sustain operation by providing uninterrupted power & utilitiesDuring my tenure I have executed & commissioned - Gas turbines (Frame 9E) & steam turbine based captive power plant ,Utility boilers ,HRSGs , DM Plant, Condensate recovery treatment plant, Cooling towers of various capacities & CW network, Air compressor , service air & instrument air system, fire water network, Electrical substations & various capacity transformers and motors.
China Kunlun Contracting & Engineering Corporation
-
Lead Electrical EngineerChina Kunlun Contracting & Engineering Corporation Jan 2018 - PresentIndiaCommissioning of Electrical & Instrumentation of PP Project at Paradip which consist of following major Equipment• Siemense Make GIS, 11 KV & 6.6 KV switch gear, Various capacity transformer of 66/11 KV and 66/6.6 KV, PCC and MCC Panels, PMS, Battery chargers & UPS, Batteries, Motors of various capacities, lighting system in plant, substations & control room.• Preparation of method and JSA• Preparation of pre- commissioning & commissioning check list and generation of Format• Implementation of LOTO and work permit system.• Commissioning of various capacities motors in PP complex.
-
General ManagerIndian Oil Corporation Limited Feb 2016 - Mar 2017Paradip Garh Area, IndiaTo ensure safe Project execution of CPP & DM Plant and commissioning of 15MMT gross root refinery & smooth sustain operation by providing uninterrupted power & utilities• Leading the Power & Utilities department of 15 MMT crude oil refinery Finalisation of P&IDs of CPP , DM Plant , Cooling water, compressed air system etc.• Operation of CPP of capacity 366 MW & 1340 T/Hr at HHP level 105 Kg/cm2• Follow-up with different agencies regarding interphase between offsite & different unit• Commissioning of steam & power load shedding scheme• Operation & Maintenance of different capacity substation & electrical equipment installed in hazardous area -
Deputy General ManagerIndian Oil Corporation Limited Mar 2009 - Feb 2016Paradip Garh Area, IndiaScheduling, Planning, Reviewing & Commissioning of 366 MW CPP & required utilities system• Construction of 366 MW CPP which contains 3X102 MW GTG , 2X30 MW TG, 4X300 T/Hr Utility boilers, 3X220 T/Hr HRSG, 5X400 M3/Hr DM Plant• Preperation of path forward for steam & power out from CPP• Commissioning of fire water network , cooling tower & cooling water network and instrument air system• Commissioning of Air compressor & instrument air dryer • Commissioning of 66 KV GIS generation & distribution switch gear, 11 KV ,6.6 KV and 415 V switch gear• Develop operating procedure for operation of Frame 9E gas turbine, Utility Boiler, HRSG, Fire water pump house, DM Plant, Cooling tower, Air compressor & Air dryer -
Cheif ManagerIndian Oil Corporation Limited May 2007 - Apr 2009Vadodara Area, India• Design, selection & procurement of 11KV & 415V Panels• Design, Procurement, installation & commissioning of 11KV/415V Transformer• Argumentation of HT & LT Panels• Design, Procurement ,Execution and Commissioning of NG skid to feed NG to GT & HRSG• Preparation of spec. for procurement of one no GT (30MW), HRSG & Utility Boiler (150T/Hr)• Design & Execution of various process Scheme -
Manager, Sr Manager And Chief Power & Utility ManagerIndian Oil Corporation Limited May 1997 - May 2007Vadodara Area, IndiaTo ensure uninterrupted supply of Power, Steam, Air, DM Water, Fire water & Cooling water to process unitHead of Power & Utility Department of Gujarat Refinery which contain following major equipments 126.5 MW (3X30+2X12+12.5) gas turbine & steam turbine based power plant Boiler (3X80+150 T/Hr) & HRSG( 3X115 T/Hr) DM Plant of capacity (3X250 + 4X150 M3/Hr) Air compressor (4X5000 NM3/Hr) and air dryer Cooling tower, fire water pump house & raw water system 66KV switch yard, HT and LT switch gear & total electrical and utilities distribution network of Gujarat refinery• Arrangement of spare to carry out timely preventive maintenance, Scheduling shutdown activities, Resource and Manpower planning• Optimization of Cogeneration & thermal power plant to minimize power generation cost & electricity duty and maximization of NG consumption• Execution & Commissioning of 30 MW Gas turbine & 115 T/hr heat recovery steam generator• Commissioning of 3X250 M3/Hr capacity DM plant & modification in DM transfer pump control scheme to avoid tripping of pumps during PLC failure• Coordination with statutory authorities like CEA & Boiler inspectorate for timely inspection -
Deputy Manager & Manager ElectricalIndian Oil Corporation Limited May 1990 - Apr 1997Kolkata Area, India• Maintenance & testing of electrical equipment such as non sparking, increase safety & flame proof motors• Maintenance & testing of Transformers, HT & LT switch gears, UPS, Battery Chargers & Batteries • Design & selection of reactor to improve fault level of generation bus to facilitate 4th TG connectivity• Review of over current & earth fault protection coordination of electrical distribution network of Haldia Refinery• Maintenance of 3X10.5MW TG, Power transformer & switch yard• Total operation of Thermal power plant which contain 3x10, 5 MW TG, 3X125 T/Hr boiler,3x150 M3/Hr DM Plant Cooling tower and air compressor -
Senior Electrical EngineerIndian Oil Corporation Limited Jul 1986 - Apr 1990Mathura Area, India• Operation & maintenance of three nos steam driven turbo generator (12.5 MW at 11KV) with auxiliaries, Cooling tower & DM Plant (3x150 M3/Hr)• Operation of HT, LT switch gear, switch yard & transformers• Operation of UPS, Battery chargers & batteries• Execution & commissioning of 3rd DM water chain of capacity 150 M3/Hr• Scheduling & planning of preventive maintenance of turbine, generator & boiler -
Electrical EngineerIndian Oil Corporation Limited Dec 1981 - Jun 1986Mathura Area, India• Execution & Commissioning of 3rd TG (12.5 MW) of Mathura refinery• Testing & maintenance of 3X12.5 MW TG set & its auxiliaries• Testing , Maintenance, Repairing and trouble shooting of various relay like over current, earth fault, differential, voltage, negative phase sequence and various type of electromagnetic, electronic & thermal relay• To finalize control drawing of HT motors, Transformers, LT feeder and their interlock• Testing & maintenance of AVR, battery chargers and UPS• Testing & Maintenance of HT/LT motors ,HT/LT panels, Transformers & Switchyard • Review of protection coordination of electrical system of Mathura Refinery• Design & execution of steam & power load shedding scheme of Mathura Refinery
Jagadish Singh Education Details
-
Power Apparatus & Electric Drive
Frequently Asked Questions about Jagadish Singh
What company does Jagadish Singh work for?
Jagadish Singh works for China Kunlun Contracting & Engineering Corporation
What is Jagadish Singh's role at the current company?
Jagadish Singh's current role is Lead Electrical Engineer at China Kunlun Contracting & Engineering Corporation.
What schools did Jagadish Singh attend?
Jagadish Singh attended Indian Institute Of Technology, Roorkee.
Not the Jagadish Singh you were looking for?
-
Jagadish Singh
Bengaluru -
-
1accenture.com
-
1mphasis.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial