Project Lead
CurrentSpecializing in monopole reinforcements, design modifications for failing towers in accordance with the local jurisdictional code including TIA/EIA, AISC, ACI, AWS among others. Reinforcements typically range from monopole shaft reinforcement, elevated flange reinforcements, elevated flange jumps both welded and bolted configurations, base plate and anchor rod modifications and additions, micro-piles, rock anchors and other more typical foundation modifications. Work with the client to review failing analyses and provide quotes for reinforcement design. Complete reinforcement design from beginning to end, including analysis review, modification design, and design drawings. Coordinate with clients and general contractors to design and construct reinforcements in a cost effective and efficient manor given the existing conditions found in the field. Review pre-construction documents including fabrication drawings and special inspections forms, depending on jurisdictional requirements. Review and sign post-modification inspection reports to ensure the design was constructed properly to the design and code specifications.