Electrical Apprentice
Camsan Inc
Stamford
Continuation of Experience.Project: 66 Summer St, 16 Story Residential Highrise, Stamford. 7 months on the job.I worked on running 4'' conduit from the 1st floor electrical room to the 16th floor electrical room. I worked on running 3/4'' and 1'' conduit throughout the entire building for various electrical power, fire alarm systems, telecommunications, site lights and cameras. I also worked on the general rough of walls/ceilings of each apartment, power, fire alarm, communications, cable. I worked on the finish of each apartment, installing devices, lights, appliances. I ran power and fire alarm for the electrical dampers on each floor. I installed the smoke ducts for each damper, 52 in total. I worked on the layout and installation of the 1st floor main electrical room switch gear, panels, transformers as well as the 16th floor electrical room switch gear, panels, transformers. I worked on the Electrical Bus Duct that went from the 1st floor to the 15th floor distributing power for each floors electrical room where I was apart of the installation and termination of 16-20 Meter Packs per floor.Project: Grace Farms, New Canaan. 5 months on the job.I worked on just a few buildings on this project which were the Gym, Living and Dining, and the Sanctuary. Most of my work was in Living/Dining where I was apart of the in-wall rough/layout for the kitchen and rest of the building. I was apart of the layout/installation/wiring of Living/Dining Electrical room and mechanical equipment as well as commercial kitchen equipment. I worked on various tasks throughout the building which consisted of roughing, conduit runs, fire alarm conduit runs and roughing, and site light work.Other various office building projects and renovations, demolition, roughing, layout, gear, conduit.