John Waguespack

John Waguespack Email and Phone Number

Senior Production Engineer
John Waguespack's Location
Angleton, Texas, United States, United States
John Waguespack's Contact Details

John Waguespack work email

John Waguespack personal email

About John Waguespack

John Waguespack is a Senior Production Engineer.

John Waguespack's Current Company Details

Senior Production Engineer
John Waguespack Work Experience Details
  • The Dow Chemical Company
    Production / Improvement Specialist - Versene Chelants
    The Dow Chemical Company Apr 2010 - Mar 2017
    Freeport, Tx
    Developed improved crystal growth techniques which resulted in doubling the run time between restartsOptimized crystallizer wash & restart timing by correlating process data with unwanted crystal structure that resulted in process plugging, as well as out-of-spec productDeveloped and implemented OD in the Crystal Plant Train, achieving in a new MAC in 2012, 2013 and 2014Achieved new MAC in the Specialty Plant Train in 2014Achieved record production in the Crystal Plant, exceeding the 2014 production estimate by the end of the 3rd quarterDeveloped OD and process control requirements for new product launchReview/development of plant LOPA and determination of new safety instrumented systemsProvided technical support for 2014 NEA SAP3 implementation
  • The Dow Chemical Company
    Production / Improvement Specialist - Styrene 2
    The Dow Chemical Company May 2004 - Apr 2010
    Freeport, Tx
    Responsible for safe and efficient operation of styrene monomer unit with a production capacity of 4 MM lb/day. Unit operations include distillation, gas and liquid fuel fired equipment, boiler systems, fixed catalyst bed reactors, cooling towers and large compressor systemsDeveloped detailed cost estimates for decommissioning of the Styrene 2 facility. Developed and implemented a decommissioning strategy for clearing, cleaning and isolation of all equipment which resulted in minimal hydrocarbon waste while meeting timing and cost goalsImplemented advanced process control on distillation tower to improve product recovery (Savings of $750M/yr)Implemented SAP redesign for EBA & Styrene plants (significant improvement in plant specific, as well as overall mass balance of less than 1%. Using six sigma mythology, monthly closing was reduced to one dayDeveloped plant requirements for maintenance shutdownsDeveloped and implemented operating discipline that reduced polymer fouling in distillation towers. (Significant reduction in energy usage and AU losses, significant reduction in turnaround maintenance budget due to packing replacement)
  • The Dow Chemical Company
    Sr Improvement Engineer - Styrenics Business
    The Dow Chemical Company Feb 2001 - May 2004
    Freeport, Tx
    Responsibilities included developing project opportunities and capital budgeting for the department. Served as Man. Rep. for fast track project to rebuild cooling tower that was in danger of collapsing. Project was completed with cooling tower in service, with zero production losses and zero EH&S incidents
  • The Dow Chemical Company
    Production / Improvement Engineer - Styrene 1
    The Dow Chemical Company Sep 1996 - Feb 2001
    Freeport, Tx
    Manufacturing Rep. for $10MM Reliability Improvement Project to replace styrene reactor and other high temperature equipmentSignificant improvements to plant unplanned events and EH&S performance
  • The Dow Chemical Company
    Reliablility Engineer - Maintenance
    The Dow Chemical Company Jan 1993 - Sep 1996
    Freeport, Tx
    Reliability & Maintenance Rep. for A-22, A-8 and A-3A Dock Construction Project ($35MM)Freeport Marine Maintenance Rep. for A-3500 Marine Facilities Project ($30MM)
  • The Dow Chemical Company
    Facilities Engineer - Marine Terminal
    The Dow Chemical Company Jan 1990 - Jan 1993
    Freeport, Tx
    Operations team member developing scope details for reconstruction of most of Freeport Marine facilities including equipment clearing, demo plans and new equipment commissioningServed as Maintenance Activity Focal Point for 6 months

John Waguespack Education Details

Frequently Asked Questions about John Waguespack

What is John Waguespack's role at the current company?

John Waguespack's current role is Senior Production Engineer.

What is John Waguespack's email address?

John Waguespack's email address is jw****@****dow.com

What schools did John Waguespack attend?

John Waguespack attended Lamar University.

Not the John Waguespack you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.