Global Relief Well Advisor
CurrentMr. Wright will provide Wild Well and their clients advice on all aspects of controlling a blowout well with a relief well and for non-conventional plug and abandonment operations using relief well related technologies. This will include procedures for developing relief well contingency plans as well as for actual projects, for example:1. Relief Well Design and Delivery Process2. Team Organization3. Target Well Diagnostics 4. Well Intersection Strategy…… Intersection Depth…… Hydraulic Communication Design: Direct connection, Milling, Perforating, Other…… Relief Well Surface Location(s)…… Surface and Subsurface Hazard Assessment…… Ranging and Surveying Strategy (adjacent well avoidance)…… Multiple Relief Well Assessment and Design…… Relief Well Trajectory Design…… Directional Drilling Strategy…… Relief Well Casing Design…… Contingency and Backup Plans…… Equipment and Logistics Requirements5. Relief Well Hydraulic Kill Simulation Strategy (based on diagnostics)…… Dynamic Kill Simulations for: mud density, rate, injection pressure, HHP and volume…… Kill Sensitivity Analysis …… Assessment of Alternate Well Intersection Depths 6. Relief Well Kill Equipment and Implementation Strategy (based on dynamic simulations)…… Assessment of Kill Plant Options …… High pressure pumping plant and manifolds…… High pressure pipe system …… Kill mud storage tankage with rolling and mixing pumps and manifolds …… Low pressure high rate transfer pumps and associated piping and manifolds …… Central command, communication and data acquisition unit and equipment…… Contingency for a separate cementing and/or reactive fluid system…… Contingency for Critical Equipment and Personnel Failures7. P & A Strategy8. Logistics Strategy