Planner | Scheduler
Durango, Co | Farmington, Nm | Perryton, Tx
• Produced labor and parts costs savings by implementing new processes to inspect parts for reuse instead of purchasing new.• Managed RFQs to ensure quotes met design requirements and standards.• Developed competence by training customer, associates and field crews on new installation procedures and standards.• Collaborated in EI&C design, drawings, and installer training• Collaborated with engineers to develop BOMs, identify long lead-time parts, and assisted PSCM in creating purchase orders – Maximo and SAP.• Maximo Work Management System SME, adequately training BP production operations and project planners on the Maximo work management system, MS project & MS Office• Collaborated with the engineers and PSCM to reduce parts inventory and meet new standards.• Implemented new process to streamline MOC (Change Management) that allowed faster start and completion times of customer jobs.• Developed standardized BOM catalog to reduce project lead times and completion cycle times.• Generated multiple project plans that standardized project scheduling and resource management.• Adequately managed project audits to identify resource and materials cost reduction opportunities.• Generated 65% reduction in costs by standardizing environment changes on hazardous materials management.• Managed structured improvement activities to implement new procedures for design changes to field process equipment installation.• Engineered production equipment installation requirements to decrease environmental hazard impacts.• Identified and managed shutdown impacts and coordinated multiple maintenance work opportunities.• Develop project schedules to coordinate resource, plant, and site sustainment tasks.• Led HSE compliance efforts to comply with current federal, state and local regulations. • Implemented process changes in installation testing creating a $300K cost savings and increase job safety performance metrics• Generated $40k cost savings by reducing jobs rework