Director
Providing project services to Wood Group Mustang, based in Woking,Surrey, UK, for the Tengizchevroil Future Growth Project.Responsibilites:• Develop approximately 150 Safety Instrumented System (SIS) Validation Procedures (SIS Vals) to be used in Phase 5 of the IEC61511 Safety Lifecycle Model (Installation, Commissioning and Validation).SIS Validation procedures covered the following activities: • SIS End-to-End testing procedures• PCS 1 Independent Protection Layer… Show more Providing project services to Wood Group Mustang, based in Woking,Surrey, UK, for the Tengizchevroil Future Growth Project.Responsibilites:• Develop approximately 150 Safety Instrumented System (SIS) Validation Procedures (SIS Vals) to be used in Phase 5 of the IEC61511 Safety Lifecycle Model (Installation, Commissioning and Validation).SIS Validation procedures covered the following activities: • SIS End-to-End testing procedures• PCS 1 Independent Protection Layer (IPL) Control Loop testing• ALM 1 Independent Protection Layer (IPL) Alarm testing• Identify and create SIS Validation templates to be used in SIS Val development.• Collation and review of current engineering master SIS Val feeder documents.• Ensuring continual development of SIS Vals by incorporating site Systems Completions team feedback and by carrying out rationalization exercises to ensure credit taken for earlier SIS Validation activities e.g SIS configuration templates Application FAT (AFAT) and SIS AFAT.• Technical reviews on procedures prepared by SIS Val team members, (five in total), on SIS Val reports and systemization proposals completed by site Systems Completions team. Show less