Site Engineer
CurrentProject: Warringah Freeway upgrade, M7 Widening and M7 & M12 Interchange, M6 & Bluescope Berth 113 Extension • Analyzed construction drawings to create detailed pile and rebar schedules. • Collaborated with rebar cage suppliers, reviewing shop drawings and establishing delivery schedules. • Interpreted borehole reports to determine required casing lengths for each pile. • Managed all aspects of pile construction, including location, drilling depth, socketing, cage installation, and concrete pouring. • Coordinated with geotechnical engineers to confirm socketing depths for piles. • Assisted project engineers and managers with additional project documentation and planning tasks. • Monitored project progress and updated the overall plan to reflect real-time conditions. • Conducted PIT and Sonic Lodging tests for test piles, ensuring project feasibility. • Prepared and maintained as-built schedules for completed piles, documenting project progress. • Developed and implemented safety plans (SWMS, TRAs) securing client approval and ensuring project compliance. • Conducted weekly safety audits, identifying and mitigating potential hazards on-site. • Maintained comprehensive safety and quality documentation for project records. • Liaised with clients to obtain necessary permits (platform certificate, excavation permit, hot work permit). • Performed quarterly inspections of lifting equipment, ensuring certificate validity. • Led daily pre-start meetings, highlighting potential jobsite hazards to the crew. • Liaised with clients, yard facilities, and transportation contractors to facilitate machinery movement, mobilization, and demobilization. • Managed the supply of oxy-acetylene and fuel for project machinery, ensuring operational efficiency.