Asst. Manager (Mechanical & Project)
CurrentAt NAGPUR since JULY. 2010. (paper plant of 600 TPD with 15+3 MW Thermal power plant.Responsibilities Project and Site Management Turbines and Rotating Equipment Supervision Planning and Development Repair and Maintenance of all equipment Construction Project Boiler and its auxiliary Plant preventive & predictive maintenance. PLANT OVERVIEW 85 TPH & 65 kg/ cm2 pressure (15 x 1 MW) CVL make AFBC, coal fired, Water tube type Boiler controlled with DCS system supplied by EMERSON AUTOMATION. 15 MW 6850 RPM, Triveni Engineering India Ltd. Turbine of Extraction cum condensing type connected to 15 MW (11 KV, 1500 RPM) BHEL make alternator through 1:4.56 reduction gear box. 24 TPH & 45 kg/cm2 pressure (3 x 1 MW) CVL make AFBC, coal fired water tube type Boiler controlled with PLC.3 MW (8325 rpm) Triveni Engineering India LTD Turbine of extraction cum condensing type connected to 3MW (11KV,1500 rpm) BHEL make alternator through 1:5.55 reduction gear box.Ash handling system of MACAWBER BEAKEY LTD. 30 TPH Bevcon make Coal Handling Plant.R.O. Plant Doshion LTD of total capacity 65M3/hr (with MGF, ACF and Mixed bed).