Senior Project Engineer
I have worked on several projects while at North American Stainless (NAS). I initially started there as a contract engineer doing field work for the installation of a new EAF (electric arc furnace). NAS asked me to go to work for them directly and help with their next project which would be AP4 (or Annealling and Pickling line 4). I started full time with them in September 2006.After successful completion of this project, I was assigned to Bahru Stainless Sdn. Bhd. in Johor Bahru, Johor, Malaysia. Our parent company, Acerinox (based in Spain), had decided to build a stainless steel factory in the Asia region to be closer to that market. I was assigned to the purchase and installation of the factory mechanical utility systems (compressed air, steam, water treatment, potable water, and deionized water systems and distribution. I worked there for 3 years and 4 months on two different phases of the planned four phases. I returned in April 2013 to be reassigned to the Hot Mill Mechanical Maintenance department. I worked there for about a year and then moved into Hot Mill Operations as the Furnace Engineer/Supervisor. This portion of the Hot Mill included slab grinding operations, Reheat Furnace operations, and Water Treatment Plant operations.