Architect (Design Coordination And Bim)
São Paulo Area, Brazil
(20th Largest Contractor in Brazil) 2013-2015 BIM Dept: Design Coordination; model quality control; clash detection; modelling for quantity take-off; team leadership. 2012-2013 Engineering and Design Dep: In-site work and site instructions; value engineering (VE); pre-construction and support in project cost effectiveness proposals; 2D Clash detection; support for bid proposals. 2010-2011 “Fast” Dep: Architectural design for tender and design coordination for bank branches (new, remodelling and/or expansion). Small projects with short deadlines, in large volume. Most relevant BIM Projects: 2015 - Shopping Carrefour Pamplona: (Shopping Centre retrofit in São Paulo City Centre): Modelling for quantity take-off. Responsible for the team leadership.2015 - Osasco City Hall (New City Hall building for Osasco, SP): 5D Modelling; clash detection. Responsible for the team leadership.2013-2014 - Rio 2016 Olympic Park, IBC e MPC buildings: 5D Modelling. Responsible for the team leadership in final design review.2013 - Shopping Manaus Via Norte (95,000sqm shopping centre in the outskirts of Manaus, AM, largest city in the Amazon basin): Clash detection; mixed BIM/2D MEP design coordination; site instructions and survey; team leadership. Pilot project, with estimated RoI of over R$1,000,000 (€425,000 at the time), or 1% of total cost.Most relevant in-site Projects: 2013 - Tishman Speyer Vila Nova Home (27 storey upscale residential building in São Paulo): 2D Clash detection; site instructions and building survey.2012-2013 - Torre Matarazzo e Shopping Cidade de São Paulo (125,000sqm Office and commercial building in São Paulo City Centre): Site instructions; value engineering (VE); pre-construction and support in project cost effectiveness proposals; 2D Clash detection.References on request.